Parallel GFS MOS Evaluation
The GFS MOS forecast equations have been applied to output from NCEP's
parallel runs of the GFS model. A comparative verification was perfomed
using parallel GFS and operational GFS MOS guidance from July 1st through
October 31st, 2005, and September 1st, 2006 through March 31st, 2007.
Verification scores are presented for maximum, minimum, and 2-m temperature,
dew point, probability of precipitation (POP), wind speed and direction,
total sky cover, ceiling height, and visibility.