King County Navigation Bar (text navigation at bottom)
Solid Waste Division - reduce, reuse, recycle
GreenTools — Powered by King County GreenTools — Powered by King County

Site Improvements

image: Green Building site improvements

Site Improvements

Low Impact Development allows a developed site to more closely mimic the conditions found on an undisturbed site.

Creating truly green, sustainable buildings requires more than designing a green building itself. It requires careful site selection and design considerations. Low Impact Development (LID) is an innovative, ecosystem-based approach to land development and stormwater management, limiting surface water runoff and pollutant generation from a development site. The application of LID allows a developed site to more closely mimic the conditions found on an undisturbed site. In addition, the use of compost helps restore soil conditions to pre-development conditions.

Post-Construction Soil Standard

These regulations require permit holders to preserve topsoil, restore soils by adding compost after construction, or implement other measures to maintain the soil's moisture holding capacity.

 

Low Impact Development

Low Impact Development (LID) focuses on how water enters a site, is stored on-site, and leaves a site.

 

top of page

SWD Home  |  What do I do with...?  |  Facilities  |  Calendar  |  About Us   |  Contact Us

King County Solid Waste Division
King Street Center 201 S. Jackson Street, Suite 701, Seattle, Washington 98104
Solid Waste Information Line: 206-296-4466, Fax: 206-296-0197, TTY Relay: 711,
800-325-6165 ext. 66542 (outside the local calling area M-F 8:30 am - 4:30 pm)
Send us your comments online.

Updated: Mar. 27, 2008


King County | News | Services | Comments | Search

Links to external sites do not constitute endorsements by King County.
By visiting this and other King County Web pages,
you expressly agree to be bound by terms and conditions of the site.
The details.