Requirements For A Facility
Once The Title V Permit Is Issued

 

Once a final Title V permit is issued, it does not need to be renewed until five years from the effective date. Facilities must comply with all new periodic monitoring and recordkeeping requirements, and some facilities may be required to comply with more than one version of the same AQMD rule.  Also, there are reporting requirements such as deviation (non-compliance) reports, semi-annual monitoring reports and annual compliance certification reports. Each of these new requirements is briefly discussed below.

Periodic Monitoring Requirements
Deviation and Breakdown Notification
Semi-Annual Monitoring Reports
Annual Compliance Certifications
Non-Compliant Operations
Compliance with Outdated Rules in the State Implementation Plan

Some documents require Adobe Acrobat to read and print the document.  You can use this link to download a FREE version of Adobe Acrobat Reader.

Most forms are in pdf format and require Adobe Acrobat Reader or equivalent.  Adobe Acrobat Reader is a FREE program.

Periodic Monitoring Requirements

Title V requires additional periodic monitoring for the SIP-approved, federally enforceable rules that do not contain sufficient monitoring requirements to assure compliance with the emission limitations or other requirements. The AQMD has developed guidelines for periodic monitoring, testing and recordkeeping requirements that may be incorporated in Title V permits. Click here to download a copy of the AQMD Periodic Monitoring Guideline (pdf 289 kb). 
Return to Top

Deviation and Breakdown Notification

The term deviation is not defined in Part 70.  It is generally understood to mean any failure to comply with a permit term - which may or may not result in a violation.  In absence of a federal definition for deviation, the statement on EPA’s reporting form for deviation under Part 71 is used as reference: 

“Deviations from permit terms occur when any permit term is not met, including terms that establish emission limitations, emission standards, control equipment requirements, work practices, and parameter ranges, and those designed to assure compliance with such requirements, such as monitoring, recordkeeping, and reporting requirements.  For example, included in the meaning of deviation are any of the following: (1) a condition where emissions exceed an emission limitation or standard; (2) a situation where process or emission control device parameter values indicate that an emission limitation or standard has not been met; (3) a situation in which observations or data collected demonstrate noncompliance with an emission limitation or standard or any work practice or operating condition required by the permit (including indicators of noncompliance revealed through parameter monitoring); (4) a situation in which an exceedance or an excursion, as defined in 40 CFR part 64 (compliance assurance monitoring or CAM), occurs; (5), a situation in which required monitoring of emissions or parameters is not performed (including where parameters; and (6) failure to comply with a permit terms that requires records to be kept or submittal of a report 3. A deviation is not necessarily a violation.  Violations will be determined by EPA (or its delegate Agency).”  
[See http://www.epa.gov/air/oaqps/permits/prompt.pdf to view the form.] 

Return to Top

Form 500-N – Deviations, Emergencies & Breakdowns  must be completed and submitted to the AQMD Compliance Team  for any deviations from permit or applicable rule requirements. Breakdowns as required by Rule 430 – Breakdown Provisions or Rule 2004(i) shall also be reported using the same form. Condition 22 of Section K of the Title V permit provides the details of this reporting requirement.

The facility must obtain a notification number from the telephone operator at 1-800-288-7664 (1-800-CUT-SMOG) in complying with conditions 22(A) & (B).  Except for deviations under Condition 22D of Section K, the notification number is required on the Form 500-N to reference the reported incident. 
Return to Top

Semi-Annual Monitoring Reports

Title V facilities that have been issued final permits are required to submit a monitoring report to the AQMD Compliance Team every six months. The report includes a statement indicating if all monitoring required by the permit was conducted. Monitoring may include observations, measurements, calculations, sampling and anything else involved with the operation of equipment that is required by the permit to be monitored. Also, the monitoring report must identify all instances of deviations from permit requirements.

In general, these deviations should have been previously reported using the Form 500-NForm 500-SAM - Semi-Annual Monitoring Report should be submitted for the monitoring reports to the AQMD Compliance Team.  Rule 3004 - Permit Types and Content requires the first monitoring report to be submitted by August 31st for the first six calendar months and the second report for the last six calendar months be submitted by February 28th.  This Semi-Annual Monitoring report need not be submitted to EPA. 
Return to Top

Annual Compliance Certifications

A Title V facility that has been issued final permit is required to certify annually that the facility is in compliance with the conditions of the permit. The first annual compliance certification does not include the period preceding the effective date of the initial Title V permit. 

Facility owners should review pertinent records each year to determine if the facility complied with all permit requirements including emission limits, work practice standards, and monitoring, recordkeeping and reporting requirements. Form 500-ACC - Annual Compliance Certification for Title V  must be submitted to the AQMD Compliance Team and EPA by March 1st. Cycle 2 RECLAIM facilities should however submit the Annual Compliance Certification Form annually at the time the Annual Permit Emissions Program report is due. Listing non-compliant operation on the compliance certification does not protect the facility from possible enforcement. 
Return to Top

Non-compliant Operations

A Title V facility must submit Form 500-C2 - Non-compliant Operations Report and Compliance Plan to the Compliance Team in cases of violations of permit and rule requirements. 

Deviations that are considered violations of the rule and permit requirements must also be reported using Form 500-C2 if a notice of violation (NOV) is issued.

A facility that continues to operate in violation of the permit and rule requirements may obtain an Alternative Operating Condition in accordance with Rule 518.2
Return to Top

Compliance with Outdated Rules in the State Implementation Plan

AQMD rules that have been approved by the EPA into the State Implementation Plan (SIP) [40 CFR Part 52, Subpart F] are considered federally enforceable for the purposes of Title V. However, the amended version of SIP-approved AQMD rules may not yet be reflected in the SIP. While AQMD awaits SIP-approval of the amended versions of these rules, EPA requires the Title V permit to refer to rule versions that are the most recent but not SIP-approved as well as the ones that are SIP-approved but not the most recent. In the meantime, facilities are required to comply with both versions of the rule.

The most recent rule language is currently in AQMD’s Rules and Regulations. It is recommended that Sections IV and V of the latest Form 500-C1 – Title V Compliance Status Report be consulted for listing of AQMD rules that are SIP-approved rules but are not the most current, and rules that are not SIP-approved.

To help Title V facilities more easily obtain copies of the older SIP-approved rules, electronic versions are available for downloading