The Texas Transportation Commission and TxDOT use the Unified Transportation
Program (UTP) as a 10-year plan to guide transportation project
development and construction. The UTP is divided into two documents:
Project Selection Process
Title |
Format |
PDF |
MPEG |
2008 Project Selection Process (PDF revised on 2/21/07) [Large video file – downloading recommended] |
|
|
2007
Project Selection Process |
|
|
|