US 90A: SH 6 to Loop 762
Widen Existing Roadway

TxDOT’s Houston District, in cooperation with the Federal Highway Administration, is studying improvements to US 90A, from SH 6 to Loop 762 in Fort Bend County, a distance of about 6.8 miles. The existing roadway consists of a four-lane divided roadway with an average right-of-way width of 175 feet. Existing drainage consists primarily of open ditches, with a short section of curb-and-gutter between Cunningham Creek Drive and SH 99. An eight-lane divided roadway with a raised median and curb-and-gutter drainage is proposed from SH 6 to SH 99. A six-lane divided roadway with a raised median is proposed from SH 99 to Loop 762. Existing drainage would be maintained.

About half an acre of right-of-way would be required at various points along the southern edge of the existing right-of-way between SH 6 and SH 99. No residential or commercial displacements are anticipated.

Contacts
If you have questions about the study, would like more information, or would like to add your name to the mailing list, contact our Houston District at (713) 802-5262 or:

Texas Department of Transportation
Director of Project Development
PO Box 1386
Houston, TX 77251-1386

E-Mail

View the Notice Affording Opportunity for Public Hearing
 

 

spacer spacer
Disclaimer | Privacy Policy | Open Records | TxDOT Contacts