Prepared
by the Health and Human Services Commission December 2001 (
printable adobe acrobat/pdf format )
The Children with Special Health Care Needs (CSHCN) program is projecting a funding shortfall in FY02-03. This has led to the implementation of a waiting list for medical and family support services. The Texas Department of Health (TDH) requested a program review from the Health and Human Services Commission (HHSC) for the purpose of addressing financial management issues and alleviating the shortfall. Commissioner Don Gilbert appointed a five-member review team from HHSC staff representing the Business Operations, Program Evaluation, and Fiscal Policy divisions. The review team focused on verifying the shortfall data, examining specific areas of potential cost savings, and identifying program service priorities. Interviews were conducted with key central office staff, regional program staff, program contractors, and legislative offices. This report presents 18 recommendations with a potential savings of $5.6 million in FY02 and $8.1 million in FY03. If implemented in a timely manner, these recommendations should eliminate the shortfall in FY02 and significantly reduce the waiting list. The recommendations are organized into the following categories: administrative functions, contracts and grants, medical services, financial management, and issues for further study. The table below summarizes these recommendations which have expected fiscal impacts. Summary of Recommendations
PurposeA projected budget shortfall in the Children with Special Health Care Needs program has led to the implementation of a waiting list for medical and family support services. Based on this projection, the Texas Department of Health (TDH) requested that the Health and Human Services Commission (HHSC) conduct a review of program operations for the purpose of alleviating the shortfall and improving program financial management. Commissioner Don Gilbert appointed a five-member team from HHSC staff representing the Fiscal Policy, Business Operations, and Program Evaluation divisions (Appendix A) to conduct a review and make recommendations to address the situation. TDH identified a 13-point scope of work for the program review (Appendix B). Program HistoryTexas established the Crippled Children's Program in 1933. The program was renamed the Chronically Ill and Disabled Children's Program (CIDC) in 1989. The program is not an entitlement and was designed to be a payor of last resort for chronically ill and disabled children under the age of 21. (Adults, 21 years of age and older, with cystic fibrosis who meet financial and residency criteria are also eligible for services.) The program was originally diagnosis specific and funded with State General Revenue and federal Title V Maternal and Child Health funds. The federal government requires that 30 percent of Title V funds be expended on this program. With the enactment of SB 374, 76th Legislature, the program was renamed as the Children with Special Health Care Needs (CSHCN) effective on September 1, 1999. Other program changes created by SB 374 include:
An observation of the review team is that this program has drawn high interest from many influential quarters and program staff often find themselves under great outside pressure to direct resources into special areas. On occasion this has resulted in a reduction of the program resources directed towards direct medical services.
Review ProcessThe Department provided the review team with a detailed presentation of program operations, office space, and an extensive array of program documents, and data. The review team conducted interviews of key staff members in the central office and visited four regional offices in Arlington, Houston, San Antonio, and Temple, which included interviews with eight contractors. All program personnel were readily accessible and forthcoming with requested information and data. Review team members also met with the CSHCN Advisory Committee to provide an overview of the study, and interviewed two committee officers and the program actuaries (see Appendix C for a complete list of interviews). The review team sought to determine the specific requirements of the program and identify program service priorities. Everyone interviewed stated that the provision of medical services was the first and foremost priority. The goal of the review team was to search for actions that would alleviate the shortfall and address financial management issues. This report presents recommendations designed to meet the objectives of the review. Additionally, issues for further study are presented because time constraints prevented a detailed analysis, but the review team identified these items as important to future program operations. The review team found that, in many respects, the CSHCN program is a microcosm of its parent agency as many of the findings of the Business Practices Evaluation by Elton Bomer are also reflected in this program. The savings projected for each recommendation are estimates based on review team findings. The CSHCN program may or may not fully realize the savings upon consideration and implementation of the recommendations. FY 2002-03 Shortfall ProjectionThe CSHCN program is estimating a $5.9 million shortfall in the program for FY 2002 as indicated in Table 2. Should the Medicaid Cost Containment Provision (Section 33) develop increased savings to cover the share of the reduction allocated to CSHCN, the CSHCN shortfall could be reduced to $2.9 million. An estimate of FY03 CSHCN projected expenditures has not been compiled to date. Known differences between FY02 and FY03 are:
Total available funds for the program in FY03 is estimated at $39.6 million. This FY03 funding amount is slightly more than the estimated FY02 expenditure level. It appears that the imposition of the Section 33 reduction would determine whether there is an FY03 shortfall and the extent a waiting list continues. Table 2:
The review of the shortfall projection found that almost all the budgetary elements comprising the FY2002 CSHCN shortfall are actuarial projections. The CSHCN program's contracted actuary is Rudd and Wisdom, which is also the contracted actuary for the Medicaid, CHIP and ERS programs. The actuarial projections consider the impact of the CHIP program. Only the estimate of administrative/case management services was developed without the contracted actuary. The administrative/case management budget projection is a compilation of administrative salaries and related expenses, grants and contracts. TDH staff developed the forecast of the waiting list impact. However, the impact of the implementation of the waiting list ($7.2 million) is based on a methodology that was suggested and reviewed by the contracted actuary. The estimate of the FY02 shortfall appears reasonable, but the estimate of providing new services pursuant to SB 374 includes only new services, and not newly covered diagnoses. For example, regional case workers stated that children with asthma, not previously covered, were now receiving CSHCN services. Since the actuarial projections are developed from previous claims, the shortfall projection may not be capturing the effect of providing services to children with newly covered conditions, and thus may be understated. Currently, the program pays for the services when billed from the National Heritage Insurance Corp. (NHIC), the claims processor for CSHCN as well as the Medicaid program. The date billed from NHIC may not occur in the same fiscal year as the service was incurred. In Table 2, the program incurs the expense of FY01 services billed in FY02, estimated at $3.4 million and defers $2.6 million estimated to be billed in FY03. Although the actuary accounts for the CHIP effect in the projections of claims, the CSHCN program has experienced difficulty in accounting for the effects of this program. Estimates of the effect of CHIP implementation on the CSHCN program have not come to fruition. The number of CSHCN children assumed to be CHIP eligible is less than what was projected. One factor is the number of CSHCN children who are Texas residents but have an undocumented status, and thus are ineligible for Medicaid or CHIP. The number of children enrolled in CSHCN during FY01, who were also enrolled in CHIP as of July 31, 2001, is 1,478. According to the actuary, the data indicates that CSHCN children who have enrolled in CHIP tend to be the less expensive CSHCN children. Also the CSHCN program continues to provide wrap around services to CSHCN children enrolled in CHIP, such as transportation and lodging. Another difficulty is projecting the breadth of services to be used by special needs children. As indicated in Figure 1, eleven percent of the 5,019 children served represented 73.3 percent of the medical expenditures in FY 2000, while over half of the children served represented only three percent of the total medical expenditures. Appendix D provides a more detailed account of CSHCN clients and expenditures. Figure 1:
The review team presents 18 recommendations representing $5,584,269 in potential savings for FY02 and $8,063,152 for FY03. The recommendations are classified as Administrative Functions, Contracts and Grants, Medical Services, Financial Management, and Issues for Further Study. Administrative FunctionsThere are five administrative recommendations with potential savings of $330,000 in FY02 and $660,000 in FY03. These recommendations address indirect salaries, central office reorganization and staffing, and eligibility processing procedures. RECOMMENDATION 1: Reduce Family Health support services administrative costs paid by the CSHCN program FINDINGS: Fifty-six state office positions (some are vacant) support the CSHCN program. In addition, there are 122 CSHCN regional staff positions, for a total of 178 positions. Currently, there are 20 Family Health support services administrative positions, at a cost of $850,240, which are indirectly charged to the CSHCN program. These positions include, among others, six automation staff, two research staff, three financial staff and various other professional and administrative support staff. They represent 26 percent of the state office positions funded by the CSHCN program. Salaries associated with Family Health support services administrative positions charged to the CSHCN program are 40 percent of the state office salary dollars. Family Health support services administrative costs borne by the CSHCN program are excessive. Without an empirical basis, such as a time and motion based cost allocation process, for determining true benefit to the program, it is left to the professional judgment of the review team to make such a determination. Given the current financial shortfall, particularly for medical services, a reduction in Family Health support services administrative costs is logical. Therefore, it is recommended that Family Health support services administrative costs be reduced, at a minimum, by 25 percent, which will result in an additional $100,000 (pro-rated for 6 remaining months in FY02) to be available to the program. (Actual saving could vary slightly, depending on the specific positions and associated salaries that are reduced.) FISCAL IMPACT: FINDINGS: The organization chart for the Authorization and Claims section within the Operations Unit shows a manager, two supervisors and eleven staff positions; six in Authorizations and Inquiry and five in Claims and Provider Enrollment. NHIC is now primarily responsible for these two functions. Within the CSHCN program, it had been planned to use these staff to:
While some of these objectives have been partially accomplished, program staff have not been reduced in spite of diminished workloads. Program staff estimated that three staff positions, not including supervisory positions, could be reassigned to other program functions. Although workload requirements for both sections are in transition, reductions of three to five staff could be realized. Consideration also should be given to reducing the number of supervisory positions from three to one. These savings could be gained quickly by imposing a Reduction in Force (RIF) or more slowly through attrition. Savings as a result of imposing an immediate RIF of 7 positions (five staff and two supervisors) would be $96,500 (pro-rated for six remaining months in FY02). Savings achieved through attrition would be appreciably less in the short term but comparable over the longer term. FISCAL IMPACT: RECOMMENDATION 3: Implement new eligibility software and transfer primary eligibility determination responsibility to the regional offices. FINDINGS: Twenty-three staff members perform eligibility functions and other duties in the regions. Regional eligibility staff are principally responsible for processing new applications and recertifications with the exception of "spend down" cases. Eligibility information is data entered into the automated eligibility determination system. In most instances, applicants do not provide all required information and documentation. Currently, regional staff members enter into the automated system what documents have not been provided and the relevant paragraphs that will be included in a letter sent, from the state office, to the applicant. Once all of the required documentation has been provided, and assuming the applicant meets the financial criteria, eligibility is approved. With the exception of spend down cases, state office staff primarily perform tracking, technical assistance and quality control functions. It is anticipated that, with the implementation of the new eligibility system, work processes will be both simplified and automated. For example:
Therefore, it is extremely important that all testing, modifications and implementation of the new system be comprehensively and properly completed as soon as possible (currently projected to be January 2002). NOTE: In the future, responsibilities and workload of regional eligibility determination staff should be reviewed to ensure that the benefits associated with the new automated system are actually derived. Furthermore, savings can be realized by removing certain responsibilities from state office staff. Examples include:
These measures will facilitate the consolidation of the Eligibility Determination and Client Support Services sections' responsibilities and a concomitant reduction in staff. Estimated saving associated with imposing an immediate RIF (two staff and two supervisory positions) as a result of this consolidation would be $55,000. Estimated savings achieved through attrition would be appreciably less in the short term but comparable over the longer term. In addition, program management should further review the functions, responsibilities and workload related to the Imaging Unit to determine if additional savings could be achieved. FISCAL IMPACT: RECOMMENDATION 4: Reorganize central office by combining the Health Care Policy, Program Evaluation and Analysis and Quality Improvement and Medical Management units and eliminating excessive layers of management. Prorate savings for FY 2002 for six months in order to allow sufficient time to implement changes. FINDINGS: There are CSHCN functions in central office that overlap and could benefit from being combined. There is duplication of effort between the Health Care Policy and the Quality Improvement units, and they should be combined to more effectively use staff. The Health Care Policy unit currently contains a manager who supervises three professional staff, totaling 2.25 FTEs (1.5 FTE funded by the CSHCN program and .75 FTE funded by another program), and two administrative technicians. The Quality Improvement and Medical Management unit contains an administrative technician, three filled and one vacant professional positions, including 1.75 FTEs funding by the CSHCN programs and 2 FTEs funded by another program. These units should be combined under one manager, with two administrative technicians and six professional FTEs. One existing manager position and one administrative technician would be reassigned outside the program for a reduction of two FTEs. The Program Evaluation and Analysis unit is comprised of two staff. These staff and their functions should be moved into the combined Policy, Evaluation and Quality Improvement unit. Moving Program Evaluation and Analysis would improve organizational efficiency, though it would not result in any direct savings. FISCAL IMPACT: There is currently an administrative technician II and an administrative technician IV reporting directly to the division director. Consideration should be given to eliminating one of those positions. FISCAL IMPACT: RECOMMENDATION 5: Adjust the salaries of Medical Doctors in managerial positions to be commensurate with that of a manager unless the position specifically requires an M.D. Prorate savings for FY 2002 for six months in order to allow sufficient time to implement changes. FINDINGS: There are three physicians in the central office of CSHCN. Two are in management positions (the director of the CSHCN program and the manager of the systems development office) and one in a medical consultant position. The two physician FTEs in management positions appear to be performing administrative work but are being paid salaries much higher than comparable non-physician administrators. These positions should be reclassified to make their pay comparable to non-physicians performing similar functions. If managerial continuity considerations prevent those reductions in the near term, at a minimum, when vacancies occur in these positions, they should be reclassified to administrative or management positions, instead of physician classifications. The duties that require a physician to perform could then be reassigned to the medical consultant who reports to the division director. Reclassify the Program Director position from Physician IV (B21) to Director II (B18); reclassify the Systems Development Manager from Physician IV (B21) to Director I (B17). NOTE: It is recognized that throughout TDH there are physicians performing administrative functions, and that this staffing is not unique to the CSHCN. Following this recommendation could have implications for staffing patterns that currently exist agency-wide. FISCAL IMPACT: Table 3: Summary of Central Office Organizational Recommendations
Contracts and GrantsThere is one recommendation concerning the cancellation of nine contracts, redirected funding of two contracts, and the amendment of two contracts resulting in a potential savings of $773,769 in FY02 and $718,152 in FY03. RECOMMENDATION 6: Cancel nine contracts, redirect the funding of two contracts, and amend two service contracts. FINDINGS: CSHCN issues service contracts to supplement the activities of the program. Currently, the program has 31 contracts totaling $3,905,898. Of these, 17 ($2,474,200) are classified as "Case Management and Community/Family Resources" contracts; two ($168,980) are "Safety Net Services (Outreach Clinics)"; six ($719,400) are "Miscellaneous" such as, actuarial services and support for the Genetics Division; and six ($543,318) are new contracts. Of the 31 contracts, 25 are ongoing and considered by the program to be re-occurring. The six new contracts for FY02 are four wellness centers ($324,321), one epilepsy direct services ($75,000), and one family-to-family/case management ($143,997). One contract, issued to The House That Kerry Built, received an increase of 233.3 percent rising from $150,000 in FY01 to $500,000 in FY02. Rider 57 of the General Appropriations Act mandated this increase with no new funding and further directed that any funds not utilized in FY02 would be carried forward to FY03. This contract should be amended to provide the amount of $250,000 in each year of the biennium. This would provide consistent funding to the contractor in each year of the biennium and reduce the funding requirements of CSHCN in FY02. It should be noted that this contract would have been recommended for reduction to the FY01 level of $150,000 if funding had not been mandated by Rider 57. It is recommended that the contract to the Harris County Hospital District also be amended. The FY02 amount for this contract is $218,386 and should be amended to $149,000, a savings of $79,386, because of low activity volume. The Austin/Travis County MHMR assumed a contract upon the withdrawal of the original contractor, the Children's Partnership. The new contractor, however is not performing the contracted services at the required level and central office and regional staff assistance has not led to sufficient improvement. It is recommended that this contract be cancelled. All contracts were reviewed to search for service duplications and the provision of mandated services. Most of the contracts involve case management that is a mandated service. Based upon the regional review, contracted case management contracts do not duplicate staff efforts but rather actively supplement and support the activities of the regional offices, especially in rural areas. Contracts issued for a combination of case management and community/family resources are particularly beneficial in supplementing regional activities. Contracts that address only community/family resources are not as useful because they provide only support services. All of the contracts perform services that are beneficial to the children and their families. There is a general consensus; however, that the provision of direct medical services to program clients is the first and foremost priority, especially in light of the current funding shortfall. Contracts that provide case management services are particularly important while contracts that provide support services are of less importance during periods of funding restrictions. With these elements in mind, the following table summarizes the recommendations concerning the current contracts. Table 4: Summary of Contract Recommendations
The program has the contractual power to terminate contracts because of funding restrictions. In addition, the PKU contracts are a result of TDH allocating funding for the Genetics Division to various agency programs. The CSHCN program should not be burdened with these internal requirements and this responsibility should be funded by other TDH resources. Taking into account the administrative procedures that would be required to implement the recommended cancellations, it is reasonable to assume that one-half of the cancelled contract amounts, with the exception of the amended contracts, could be saved during FY02 and the entire amount saved in FY03. The total amount recommended for cancellation and redirection in FY02 is $888,766 and one-half of this total is $444,383. The savings for FY03 from contract cancellations and redirections would be $888,766. The amendment of the contract to The House That Kerry Built would result in a savings of $250,000 during FY02 and a cost of $250,000 in FY03. The amendment of the contract to the Harris County Hospital District would result in savings of $79,386 in each year of the biennium. FISCAL IMPACT: Medical ServicesThere are four medical services recommendations with potential savings of up to $2,680,500 in FY02 and $5,800,000 in FY03. The recommendations address NHIC overpayment recoupments, the control of medical costs, and the temporary suspension of certain services. One recommendation addresses policy clarification with no fiscal impact determined. RECOMMENDATION 7: Recouped funds realized as a result of overpayment of claims should be credited to the program. FINDINGS: In the spring of 2001, overpayments by NHIC to hospitals for manually paid claims were identified and recoupment was requested. CSHCN staff estimate that NHIC made more than $900,000 in overpayments to hospitals over several years. The amount of $880,500 has been recouped. Those funds are in the trust account at NHIC and are available to pay claims. CSHCN staff should make every effort to recoup any additional outstanding overpayments that can be identified. According to CSHCN staff, the overpayments made by NHIC have not already been included in the budget projections. The amount already recovered, and any outstanding amount to be recovered, should be credited to the program to decrease the shortfall by the amount TDH has recouped. The recovered funds can be applied to the shortfall either as additional revenue or reduced claims. FISCAL IMPACT: RECOMMENDATION 8: Implement a comprehensive medical management process to control medical costs. This initiative is currently under development by CSHCN staff and should be implemented immediately to achieve maximum savings and ensure appropriate use of limited program resources. FINDINGS: The total cost of medical services per client has increased 49 percent from FY1998 to FY2001, with inpatient costs increasing by 63 percent per client who received inpatient care and outpatient costs increasing by 37 percent per client who received outpatient care. (See Appendix E for a detailed breakdown of medical expenditures by category) Table 5: Medical Costs Per Client FY98-FY01
In the past, adequate data to evaluate the service delivery, outcomes, and costs of medical care has been lacking. However, the completion of the new CSHCN Management Information System, scheduled for January 2002, will provide improved data on medical treatment and costs for use by program staff. For example, the program has not collected data on critical indicators, such as inpatient days per 1000 enrollees or average length of stay. This information will be available when the new system is implemented. NHIC plays a significant role in utilization review functions through prior authorization of claims and retrospective review of claims. TDH has responsibility for oversight of NHIC. However, TDH has not had a specific staff member assigned to oversight of the NHIC contract in several years. Additional program responsibilities for managing medical care include defining policy for utilization review, conducting performance reviews of the contractor, assessing overall service expenses, and conducting assessments of specific areas of concern related to utilization of services and cost containment. CSHCN is currently working to implement a medical management process to strengthen these functions. Priorities for initial development include:
One initial policy change recently adopted to improve medical management requires prior authorization for inpatient hospital stays, which account for approximately 40 percent of all medical costs. This policy will strengthen the program's ability to control costs for inpatient care. CSHCN staff indicate that savings of up to 15 percent are possible with implementation of a medical management process that provides greater scrutiny of medical services authorizations. This new initiative can be implemented within existing resources, with the current program staff. Assuming 15 percent savings is achieved in four months, the program could save $1.4 million in FY02. In FY03, assuming the maximum savings of 15 percent, $4.2 million could be saved. Estimated savings for FY02 and FY03 do not assume the continuation of a waiting list. If the waiting list is continued, savings in FY02 decrease by approximately $360,000, and savings in FY03 decrease by approximately $1.1 million. FISCAL IMPACT: RECOMMENDATION 9: Suspend the service expansion authorized by SB 374 and revert to providing services covered prior to July 2001. FINDINGS: Rules to implement SB 374 were adopted in July 2001. At that point the CSHCN program expanded eligibility for services and started covering a wider range of services for CSHCN clients. New services covered include:
Expansion of existing services include:
According to state law, the CSHCN program may discontinue, limit, or restrict services, reimbursement for services or types of services available to all clients to remain within available funding. This action requires adoption of rules by the Board. Program staff estimate the cost of SB 374 implementation to be $1.6 million in FY02. Assuming the service expansion authorized by SB 374 is suspended by the TDH Board with one quarter of the year remaining, $400,000 could be saved in FY02. FISCAL IMPACT: RECOMMENDATION 10:
FINDINGS:
While further legal review may be necessary to specifically determine the scope of the Board's responsibility in this area, the statute is clear that the Board should establish a process to manage services in situations where budgetary limitations exist. In addition to establishing a system of priorities, the Board should work with program staff to modify the current waiting list policy in order to develop a fair method of considering clients' needs when determining who is to be removed from the waiting list. The current policy of "first come first served" removal from the waiting list does not take into account which clients have the most need, or which clients have other coverage, such as CHIP or Medicaid. This policy should be refined in conjunction with the system of priorities established by the Board. FISCAL IMPACT: Undetermined. Financial ManagementThere are five fiscal management recommendations with potential savings of $1.8 million in FY02 and $885,000 in FY03. These recommendations address the allocation of revenue collections and one-time savings. Two additional recommendations review forecasting methodologies and budget allocations to the regional offices with no determination of fiscal impacts. ALLOCATION OF REVENUE COLLECTIONS RECOMMENDATION 11:
FINDINGS: Medicaid Billings CSHCN Drug Rebates In FY01, $473,818 was collected as voluntary rebates in the CSHCN program. Beginning in FY02, the rebates will be directed back to the program. Program staff apparently have not accounted for these rebates in the available revenue for FY02, estimated to be $600,000. Transfer authority may be required to redirect the rebates back to the program. FISCAL IMPACT: ONE-TIME SAVINGS RECOMMENDATION 12: Reduce the CSHCN Trust Account at NHIC to reflect an amount approximately equal to the claims for a period of one month. FINDINGS: Currently, NHIC maintains a CSHCN Trust Account in the amount of approximately $2.7 million (See Appendix F). As claims are processed, NHIC bills CSHCN monthly for the replenishment of the account thereby maintaining the account balance at the $2.7 million level. It is recommended that the contract be amended to change the payment of medical claims to effectively act more like a fiscal agent. NHIC would continue to submit the bills for claims on a monthly basis. A key component to allow for the continued payment of CSHCN medical claims without any delays would be the requirement for program staff to process invoices from NHIC in an expedited manner to replenish the CSHCN trust account. The trust account should be reduced from $2.7 million to $1.5 million, thereby freeing $1.2 million to be directed to the program shortfall. FISCAL IMPACT: RECOMMENDATION 13: Redirect funds saved from the completed development of the CSHCN Management Information System for FY 2003, estimated at $249,000. FINDINGS: FISCAL IMPACT: RECOMMENDATION 14:
FINDINGS: The current program forecasting methodology projects fiscal year expenditures based on historical data. This concentration on expenditures limits the ability to project caseload trends that, in turn, affect expenditures. This practice is "traditional" within the program and it is recommended that this current forecasting methodology be supplemented with the addition of caseload projections. This program has varied greatly in its ability to keep expenditures within appropriated levels over the last decade. The new comprehensive benefit package and expanded eligibility have further complicated the difficulties in forecasting the breadth and cost of needed services. The change in procedure to pay claims from the fiscal year that correlates with the NHIC billing date instead of the medical service date has impacted the program's projected expenditures. Given sufficient revenue, the program should reinstate a procedure to pay claims from the fiscal year of the claims' medical service date. Additionally, forecasting a range of projected expenditures may
provide greater credibility to volatile program expenditures. FISCAL IMPACT: Undetermined. RECOMMENDATION 15: Develop a system of budget allocation to the regions based on regional needs assessments and require associated performance expectations, rather than "historical" or "traditional" allocations. FINDINGS: CSHCN currently budgets and allocates funds to the regions for CSHCN program activities and "core administration" based on previous years' budgets, "tradition" and regional directors' ability to make the case that they need more funding. As one regional director explained it, "I have to fight tooth and nail for every dollar I get." Two regional directors were asked who has final approval of their annual budget, and they were not sure. Central office and regional staff confirm that a budget is not allocated on the basis of population in need, number of clients to be served, or other need indicators or performance expectations for case managers or eligibility workers. Staff have attempted in the past to develop need indicators for the state, but they were not adopted. The U.S. Department of Health and Human Services estimates that nationwide, children with special health care needs constitute approximately 18 percent of all children, and projects that there are about 15 million children with conditions ranging from moderate health problems to severe disabilities. Because of limited funds, in FY 2000 Title V nationwide was able to serve fewer than 1 million (or about 6 percent) of these children. It is recommended that the CSHCN program use the U.S. Department of Health and Human Services need estimates to develop a budget allocation methodology which incorporates the need for each region (based simply on population of children in the target age cohort), and the expected performance level to be achieved by each region (percent and number of children determined eligible, percent and number of children provided case management, and any other performance indicators the program determines appropriate). This formula should be applied to all regions equally. In addition, case management and eligibility staff should be allocated based on a ratio to the general population or the population in need, so each region will have the resources to accomplish similar levels of performance. Performance should be tracked quarterly by central office staff and regions should be held accountable for managing budgets and performance. FISCAL IMPACT: There is no direct fiscal impact for this recommendation. The impact will be improved budget allocation equity and performance accountability. Issues for Further StudyThere are three issues identified for further study. These involve the policies related to residency requirements, undocumented clients, additional policy changes to reduce medical costs, and areas that were not addressed by the review team. RECOMMENDATION 16: Review the policies on residency requirements and the provision of services to undocumented clients. FINDINGS: CSHCN estimates that up to 25 percent of the medical service clients are classified as undocumented, and it is further estimated that these clients account for more than 25 percent of the medical services expenditures. This estimate is based on anecdotal knowledge because evidence of this situation is difficult to establish. Currently, it is only required that a client be a resident of Texas with an intent to reside in the state. It is known, however, that citizens of Mexico travel to Texas for the sole purpose of acquiring medical treatment and, in another case, a Korean citizen traveled to Texas for the purpose of receiving a bone marrow transplant. An intent to reside in the state is usually documented by such things as an apartment lease or a utility bill, usually easy to obtain. Undocumented clients also tend to have the highest costs among program recipients because they tend not have private insurance and cannot qualify for Medicaid or CHIP. CSHCN, then, becomes the total payor rather than the payor of last resort as intended. Policy establishment and/or clarification are needed to assist program personnel in determining true eligibility. FISCAL IMPACT: Undetermined. RECOMMENDATION 17: The CSHCN program should consider additional policy to reduce medical costs, if necessary. FINDINGS: RECOMMENDATION 18: TDH should continue to review the Scope of Work points numbered 9 to 13 (See Appendix B). FINDINGS: TDH presented the review team with a 13-point Scope of Work (See Appendix B) as a guide for the program review. The review team was able to address several of the points in this document. However, time constraints prevented a thorough review of all points. The remaining issues should be studied by TDH in an ongoing analysis of the program. Table 6: Policy Options to Reduce Medical Costs (Dollars in Millions)
Note: Savings are not cumulative. The impact of each option was estimated based on current policy, without estimating the impact of adopting more than one of these policies at the same time. Appendix AHHSC Review Team Members
Appendix BScope of Work for Children with Special Health Care Needs (CSHCN)
Appendix CSummary of Interviews Conducted Texas Department of Health, Austin
CSHCN Central Office
Public Health Regions Region 2/3 - Arlington
Region 6/5 South - Houston
Region 8 - San Antonio
Region 7 - Temple
Contractors
CSHCN Advisory Committee
Legislative Offices
Appendix D
Appendix ECSHCN Medical Expenditures by Service Category FY 1997 - FY 2003
Appendix F
Appendix GAdministrative Staff Appendix HAppendix I
|