PIA10673: Water Hammer Test

Click on graphic to obtain download options
Mission: Phoenix
Product Size: 516 samples x 370 lines
Produced By: Lockheed Martin Space Systems
Full-Res TIFF: PIA10673.tif (573.6 kB)
Full-Res JPEG: PIA10673.jpg (36.07 kB)

Original Caption Released with Image:

Click here for movie of PIA10673
Click on the image for the animation

This video shows the propulsion system on an engineering model of NASA's Phoenix Mars Lander being successfully tested. Instead of fuel, water is run through the propulsion system to make sure that the spacecraft holds up to vibrations caused by pressure oscillations.

The test was performed very early in the development of the mission, in 2005, at Lockheed Martin Space Systems, Denver. Early testing was possible because Phoenix's main structure was already in place from the 2001 Mars Surveyor program.

The Phoenix Mission is led by the University of Arizona, Tucson, on behalf of NASA. Project management of the mission is by NASA's Jet Propulsion Laboratory, Pasadena, Calif. Spacecraft development is by Lockheed Martin Space Systems, Denver.

Image Credit:
NASA/JPL-Caltech

Image Addition Date:
2008-05-24