But...
- Little is known about what various stakeholders mean by "efficiency"
- Considerable lack of common language, conceptual clarity
- Link between content of metrics and proposed applications not always thought through
- Little is known about the consequences (intended and unintended) of applying available metrics at different levels in the system
- Can measures developed for one level (health plan) be applied at a different level (physician)?
Previous Slide Contents Next Slide