KENNEDY SPACE CENTER, FLA. -- Inside the Orbiter Processing Facility, spectators watch as Endeavour is rolled out of the bay on top of a transporter. The orbiter is being moved to the Vehicle Assembly Building for mating to the External Tank/Solid Rocket Boosters atop the Mobile Launcher Platform. Endeavour is targeted to launch May 30, 2002, on mission STS-111 to the International Space Station. Mission goals include delivering and installing the Mobile Base System to complete the Canadian Mobile Service System and carrying the Expedition 5 crew to the Station for rotation with Expedition 4. (Photo Release Date: 04/22/02 )

KSC-02PD-0537 - Raw ASCII Text Caption file
KSC-02PD-0537 - Low (GIF Format, 320x240 pixels x 256 colors, approx 50 Kbytes)
KSC-02PD-0537 - Medium (JPEG format, 1024x768 pixels x 256 colors, approx 250 Kbytes)
KSC-02PD-0537 - High (JPEG, 2040x2640 pixels x 16 million colors, approx 400 Kbytes)

STS-111 KSC Photo IndexNext Image KSC-02PD-0538


DISCLAIMER: No copyright protection is asserted for these photographs.

If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. These photographs are available for preview and download in electronic digital form ONLY. They may not be ordered from NASA in photograph form. (See NASA Copyright Notice)