|
Home | Cold Instr | Thermal Inst | Experiments | BeamTime | SiteMap |
NCNR Operating Schedule
The basic schedule of operations is a 7 week cycle entailing 38 days of operations followed by approximately 10 days of down time for maintenance.
To view the complete operating schedule, please visit the 2009 Schedule
Instrumentation Schedule
Thermal Neutron Instruments
- BT1 - high resolution powder diffractometer
- BT2 - neutron imaging facility
- BT4 - triple-axis/filter analyzer spectrometer
- BT5 - Perfect Crystal SANS
- BT7 - triple-axis spectrometer
- BT8 - residual stress diffractometer
- BT9 - conventional triple-axis spectrometer
Cold Neutron Instruments
- NG1 - Advanced Neutron Diffractometer/Reflectometer (AND/R)
- NG1 - Cold neutron reflectometer
- NG2 - High Flux Backscattering Spectrometer (HFBS)
- NG4 - Disk chopper time-of-flight spectrometer (DCS)
- NG5 - Spin-polarized triple-axis spectrometer (SPINS)
- NG5 - Neutron Spin Echo spectrometer (NSE)
- NG6 - Neutron Physics End Station
- NG6U - Neutron Physics 0.89 nm
- NG6M - Neutron Physics 0.5 nm
- NG7 - Cold neutron reflectometer
- NG7 - Prompt Gamma Neutron Activation Analysis
- NG7 - Neutron Interferometer and Optics Facility
SANS Instruments