skip navigation
Text Size small medium large  

skip navigation
Electric
Annual Charges
Safety and Inspections
Environment
Industry Activities
Smart Grid
Electric Competition
Transmission Investment
Demand Response
Energy Innovations
Electric Reliability
RTO/ISO
Power Blackout
Addressing the 2000-2001 Western Energy Crisis
Generator Interconnection
Joint Boards
Open Access Transmission Tariff (OATT) Reform
Transmission Line Siting
General Information
Hydropower
Gas
Liquefied Natural Gas (LNG)
Oil

Industries

RTO/ISO Regions - CAISO
     

    List of Orders
    Docket No. Date Issued Company Title
    ER08-1178-000 and EL08-88-000 PDF 02/20/09 California Independent System Operator Corporation Order On Section 206 Investigation, Technical Conference, accepting in part and rejecting in Part Tariff Provisions, and implementing transitional measures
    ER08-1178-000 PDF 10/16/08 California Independent System Operator Corporation Order Accepting and Suspending Tariff Filing, Instituting a Section 206 Investigation, and Establishing a Technical Conference
    ER08-556-000 and ER06-615-020 PDF 10/16/08 California Independent System Operator Corporation Order accepting Tariff Filing Subject to Modification
    ER08-1113-000 PDF 09/19/08 California Independent System Operator Corporation Order conditionally accepting tariff changes and directing Compliance Filing
    ER06-615-017, et al. PDF 06/19/08 California Independent System Operator Corporation Order on Compliance
    EL08-13-000 PDF 06/19/08 California Independent System Operator Corporation Order on Section 206 Investigation and denying complaint
    EL06-10-000, et al. PDF 05/15/08 California Independent System Operator Corporation Order on Petitions for review of Arbitration Award
    ER08-140-000 PDF 12/21/07 California Independent System Operator Corporation Order conditionally accepting tariff revisions
    ER06-615-003, et al. PDF 12/20/07 California Independent System Operator Corporation Order Instituting a Section 206 Investigation and Denying Motion for Reconsideration and Clarification
    ER06-615-007, et al. PDF 09/24/07 California Independent System Operator Corporation Order on Rehearing of the Market Redesign and Technology Upgrade
    ER07-33-001 PDF 09/20/07 California Independent System Operator Corporation Rehearing of Declaratory Order on interconnect for renewable resources
    ER06-615-003, et al. PDF 06/25/07 California Independent System Operator Corporation Order on Compliance Filings
    ER06-615-001, et al. PDF 04/20/07 California Independent System Operator Corporation Order on Rehearing of the Market Redesign and Technology Upgrade
    EL07-33-000 PDF 04/19/07 California Independent System Operator Declaratory Order on interconnect for renewable resources
    ER02-1656-024 PDF 09/21/06 California Independent System Operator Corporation Order Accepting Compliance Filing
    ER06-615-000 PDF 09/21/06 California Independent System Operator Corporation Order Conditionally Accepting the California Independent System Operator's Electric Tariff Filing to Reflect Market Redesign and Technology Upgrade
    ER04-445-005, ER04-445-006, ER04-445-007, ER04-445-008, ER04-445-009, ER04-443-004, ER04-443-005, ER04-443-006, ER04-443-007, ER04-441-004, ER04-441-005, ER04-441-006, ER04-441-007, ER04-435-007, ER04-435-008, ER04-435-009 and ER04-435-011 PDF 07/01/05 California Independent System Operator Corporation, Pacific Gas and Electric Company, San Diego Gas and Electric Company, Southern California Edison Company Order accepting in part and rejecting in part Order Nos. 2003, 2003-A, and 2003-B Compliance filings
    EL05-114-000 and EL01-35-002 PDF 07/01/05 California Independent System Operator Corporation, Mirant Delta, LLC and Mirant Potrero, LLC Order on Petition for Declaratory Order and Remand
    ER02-1656-026 PDF 07/01/05 California Independent System Operator Corporation Order on Further Amendments to the California Independent System Operator's Comprehensive Market Redesign Proposal
    ER04-928-000, ER02-1656-021, and ER02-1656-023 PDF 07/01/05 Public Utilities With Existing Contracts in the California Independent System Operator Corporation Region, California Independent System Operator Corporation Order on Scope and Standard of Review of Existing Transmission Contracts
    ER03-1102-009 PDF 07/01/05 California Independent System Operator Corporation Order on Remand
    ER02-1656-021 PDF 02/10/05 California Independent System Operator Corporation Guidance Order on conceptual proposal
    ER02-1656-017, ER02-1656-018, ER04-928-000 and EL04-108-000 PDF 09/20/04 California ISO Order on Rehearing the California ISO's Market Redesign
    ER02-1656-017, ER02-1656-018, ER04-928-000 and EL04-108-000 PDF 06/17/04 California ISO Order On Further Development Of the California ISO's Market Redesign


  Contact Information

Roland Wentworth
Telephone: 202-502-8262
Email: roland.wentworth@ferc.gov
 

  RTO/ISO  
 
RTO/ISO Regions Conferences
  • » May 8, 2007 - Examine the state of competition in wholesale power markets (AD07-7) - Event Details
  • » April 5, 2007 - Review the Commission's general policies regarding market monitoring (AD07-8) - Event Details
  • » February 27, 2007 - Competition In Wholesale Power Markets (AD07-7) - Event Details
Staff Report
 



Updated: February 20, 2009