MISSION: STS-99 -- Shuttle Radar Topography Mission (SRTM)

VEHICLE Endeavour/OV-105
LOCATION On orbit
TARGET KSC LAUNCH DATE/TIME Feb. 11, 2000 at 12:43 p.m. EST
TARGET KSC LANDING DATE/TIME Feb. 22, 2000 at 4:52 p.m. EST
MISSION DURATION 11 days, 4 hours and 8 minutes
CREW Kregel, Gorie, Kavandi, Voss, Mohri, Thiele
ORBITAL ALTITUDE and INCLINATION 126 nautical miles/57 degrees

Work in progress
Orbiter Endeavour's systems continue to perform very well on orbit. Following Friday's liftoff, launch pad and mobile launcher platform inspections revealed no abnormal damage. The solid rocket boosters arrived at Hangar AF Sunday and are currently undergoing in depth inspections. Preliminary checks indicate that both boosters are in good condition. Booster disassembly should conclude next week and rail car shipment to Utah will follow.


MISSION: STS-101 -- 3rd ISS Flight (2A.2) - SPACEHAB DM
VEHICLE Atlantis/OV-104/
LOCATION Orbiter Processing Facility bay 3
TARGET KSC LAUNCH DATE/TIME no earlier than April 13, 2000 at 8:44 p.m. EST
TARGET KSC LANDING DATE/TIME April 24, 2000
LAUNCH WINDOW about 10 minutes
MISSION DURATION 10 days, 19 hours
CREW Halsell, Horowitz, Weber, Lu, Williams, Malenchenko, Morukov
ORBITAL ALTITUDE and INCLINATION 190 nautical miles/51.6 degrees
Work in progress
Orbiter Atlantis' main engines are installed and the orbiter docking system tests are complete. Technicians recently concluded testing on the space-to-space orbiter radio system. Auxiliary power unit leak and functional tests are under way and installation of the transfer tunnel adapter is scheduled this week. Orbiter electrical wiring inspection, repair and protection continue.


MISSION: STS-92 -- 4rd ISS Flight (3A) - Z-1 Truss, PMA-3
VEHICLE Atlantis/OV-103/
LOCATION Orbiter Processing Facility bay 1
TARGET KSC LAUNCH DATE/TIME no earlier than June 14, 2000 at 8:42 p.m. EST
TARGET KSC LANDING DATE/TIME June 24, 2000 at 5:10 p.m. EDT
LAUNCH WINDOW 10 minutes
MISSION DURATION 10 days
CREW Duffy, Melroy, Wakata, Chiao, Wisoff, Lopez-Alegria, McArthur
ORBITAL ALTITUDE and INCLINATION 173 nautical miles/51.6 degrees
Work in progress
Discovery's auxiliary power unit No. 1 was replaced last Friday. Tomorrow, technicians will disconnect the orbiter maneuvering system (OMS) cross feed lines and the right hand OMS pod will be removed on Friday. Preparations for fuel cell voltage tests are also in work.

 

For automatic e-mail subscriptions to these Shuttle status reports or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.

KSC Home Page Site Search FAQ's Site Survey Customer Forum NASA Centers Privacy Statement Headlines

Page Last Revised

Page & Curator Information

01/08/2001

Curator: Kay Grinter (Kay.Grinter-1@ksc.nasa.gov) -- InDyne, Inc./
Web Development: JBOSC Web Development Team
A Service of the NASA/KSC External Relations and Business Development Directorate
JoAnn H. Morgan, Director