The Commission's regulations are found under Title 18 Chapter I of the Code of Federal Regulations (CFR) External Link. If you would like to conduct your own search of the CFR you can access the Governmental Printing Organization/National Archives and Records Administration External Link website. A comprehensive listing of the Commission's rulemaking proceedings can be found at www.regulations.gov External Link.

The tab 'Landmark' contains certain landmark orders that set precedent in establishing the regulations on how FERC will regulate a certain area that we have jurisdiction over. The tab 'General' contains certain major orders that have an effect on all the industries that FERC regulates.

Click on the categories below to view additional information.
Docket No. Date Title
Order No. 719-A PDF
(RM09-17-001)
July 16, 2009 Wholesale Competition in Regions with Organized Electric Markets (Order on Rehearing)
Order No. 697-B PDF
(RM04-7-006)
December 19, 2008 Market-Based Rates for Wholesale Sales of Electric Energy, Services by Public Utilities (Order on Rehearing and Clarification)
Order No. 719 PDF
(RM07-19-000)
October 17, 2008 Wholesale Competition in Regions with Organized Electric Markets (Final Rule)
Order No. 718 PDF
(RM08-8-000)
October 16, 2008 Ex Parte Contacts and Separation of Functions Advisory (Final Rule)
Order No. 717 PDF
(RM07-1-000)
October 16, 2008 Standards of Conduct for Transmission Providers (Final Rule)
RM04-7-005 PDF
July 17, 2008 Market-Based Rates for Wholesale Sales of Electric Energy, Services by Public Utilities (Order on Rehearing and Clarification)
Order No. 890-B PDF
(RM05-17-000 & RM05-25-000)
June 23, 2008 Preventing Undue Discrimination and Preference in Transmission Service
Order No. 711
(RM08-10-000) PDF
May 15, 2008 Submissions to the Commission upon Staff Intention to Seek an Order to Show Cause (Final Rule)
RM08-8-000 PDF May 15, 2008 Ex Parte Contacts and Separation of Functions (NOPR)
PL08-2-000 PDF May 15, 2008 Obtaining Guidance on Regulatory Requirements
Order No. 697-A PDF
(RM04-7-001)
April 21, 2008 Market-Based Rates for Wholesale Sales of Electric Energy, Services by Public Utilities (Order on Rehearing and Clarification)
RM07-1-000 PDF March 21, 2008 Standards of Conduct for Transmission Providers (NOPR)
Order No. 890-A PDF December 28, 2007 Preventing Undue Discrimination and Preference in Transmission Service (Order on Rehearing and Clarification)
Order No. 704 PDF
(RM07-10-000)
December 26, 2007 Transparency Provisions of Section 23 of the Natural Gas Act (Final Rule)
Order No. 697 PDF
(RM04-7-000)
June 21, 2007 Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities (Final Rule)
Order No. 890 PDF
(RM05-17-000 & RM05-25-000)
February 16, 2007 Preventing Undue Discrimination and Preference in Transmission Service (Final Rule)
Order No. 690 PDF
(RM07-6-000)
January 9, 2007 Interim Rule on Standards of Conduct for Transmission Providers (see Standards of Conduct for Transmission Providers section for more detail)
Order No. 2006-B PDF
(RM02-12-002)
July 20, 2006 Standardization of Small Generator Interconnection Agreements and Procedures (Order on Clarification)
Order No. 2006-A PDF
(RM02-12-001)
November 22, 2005 Standardization of Small Generator Interconnection Agreements and Procedures (Order on Rehearing)
Order No. 2003-C June 16, 2005 Standardization of Generator Interconnection Agreements and Procedures, Order on Rehearing (Final Rule)
Order No. 2006 PDF May 12, 2005 Standardization of Small Generator Interconnection Agreements and Procedures (Final Rule)
Order No. 2004-C PDF December 21, 2004 Standards of Conduct for Transmission Providers (see Standards of Conduct for Transmission Providers section for more detail) (Final Rule)
Order No. 2003-B December 20, 2004 Standardization of Generator Interconnection Agreements and Procedures, Order on Rehearing and Directing Compliance (Final Rule)
Order No. 2004-B PDF August 2, 2004 Standards of Conduct for Transmission Providers (see Standards of Conduct for Transmission Providers section for more detail)
Order No. 2004-A PDF April 16, 2004 Standards of Conduct for Transmission Providers (Order on Rehearing) (Final Rule) (see Standards of Conduct for Transmission Providers section for more detail)
Order No. 2003-A March 5, 2004 Standardization of Generator Interconnection Agreements and Procedures (Order on Rehearing) (Final Rule)
Order No. 2004 PDF November 25, 2003 Standards of Conduct (Final Rule) (see Standards of Conduct for Transmission Providers section for more detail)
Order No. 2003 July 24, 2003 Standardization of Generator Interconnection Agreements and Procedures (Final Rule)
Order No. 637-B
July 26, 2000 Order Denying Rehearing Concerning Regulation of Short-Term Natural Gas Transportation Services (Final Rule)
Order No. 637-A May 19, 2000 Order on Rehearing, Rehearing of Short-term Natural Gas Transportation Services, and Regulation of Interstate Natural Gas Transportation Services (Final Rule)
Order No. 637 February 9, 1999 Regulation of Short-term Natural Gas Transportation Services, and Regulation of Interstate Natural Gas Transportation Services (Final Rule)
Order No. 888-C January 20, 1998 Order on Rehearing, Denying Otter Power Co. Rehearing Request
Order No. 889-B November 25, 1997 Final Order: Order Denying Rehearing of Order 889-A in Regards to Open Access Same-Time Information System & Standards of Conduct (OASIS)
Order No. 888-B November 25, 1997 Order Affirming, With Certain Clarifications, The Fundamental Calls Made in Order 888-A in Regard To Promoting Wholesale Competition Through Open Access Non-discriminatory Services etc
Order No. 888-A March 4, 1997 Reaffirming & clarifying terms of Order 888 in regards to Open Access Transmission Services & Recovery of Stranded Costs
Order No. 889-A March 4, 1997 Order Revising Rules Governing Transmission Information Networks, Standards of Conduct and Policy on Posting Discounts consistant with changes under Order 888-A
Order No. 889 April 24, 1996 OASIS: Open Access Same-Time Information System (formerly Real- Time Information Networks) and Standards of Conduct (Final Rule)
Order No. 888 April 24, 1996 Transmission Open Access. Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities (Final Rule)
Order No. 636-C November 27, 1992 Order Denying Rehearing and Clarifying Orders 636 and 636-A (Final Rule)

Order No. 636-B November 27, 1992 Order Denying Rehearing and Clarifying Orders 636 and 636-A (Final Rule)

Order No. 636-A August 3, 1992 Denying Rehearing in Part, Granting Rehearing in Part and Clarifying Order 636 (Final Rule)
Order No. 636 April 9, 1992 Restructuring of Interstate Natural Gas Pipeline Services (Final Rule)
 
Docket No. Date Title
RM05-35-000 PDF
December 18, 2008 Standard of Review for Modifications to Jurisdictional Agreements (Termination of NOPR)
Order No. 714 PDF
(RM01-5-000)
September 19, 2008 Electronic Tariff Filings (Final Rule)
RM01-5-000 PDF April 17, 2008 Electronic Tariff Filings (NOPR)
Order No. 703 PDF
(RM07-16-000)
November 15, 2007 Filing Via the Internet (Final Rule)
Order No. 702 PDF
(RM06-23-000)
October 30, 2007

Critical Energy Infrastructure Information  (Final Rule)

RM07-16-000 PDF July 23, 2007 Filing Via the Internet (NOPR)
Order No. 694 PDF
(RM07-2-000)
April 19, 2007 Accounting and Reporting Requirements for Nonoperating Public Utilities and Licensees (Final Rule)
Order No. 683-A PDF
(RM06-24-001)
April 9, 2007 Critical Energy Infrastructure Information (Final Rule)
Order No. 690-A PDF
(RM07-6-001)
March 21, 2007 Order on Clarification and Rehearing on Standards of Conduct for Transmission Providers
PL05-10-000 PDF February 15, 2007 Criteria for Reassertion of Jurisdiction Over the Gathering Services of Natural Gas Company Affiliates (Clarifying Policy)
AD07-4-000 PDF December 21, 2006 Statement of Administrative Policy Regarding the Process for Assessing Civil Penalties
Order No. 683
(RM06-24-000)
September 21, 2006 Critical Energy Infrastructure Information (Final Rule)
RM06-23-000 PDF
September 21, 2006 Critical Energy Infrastructure Information (NOPR)
Order No. 680 PDF
(RM06-19-000)
July 20, 2006 Commission Procedures During Periods of Emergency Requiring Activation of Continuity of Operations Plan (Final Rule)
Order No. 677 PDF
(RM06-14-000)
May 19, 2006 Revisions to Record Retention Requirements for Unbundled Sales Service, Persons Holding Blanket Marketing Certificates, and Public Utility Market-Based Rate Authorization Holders (Final Rule)
Order No. 675-A PDF
(RM06-2-001)
May 18, 2006 Procedures for Disposition of Contested Audit Matters (Order on Rehearing and Clarification) (Final Rule)
Order No. 663-A PDF March 17, 2006 Revision of Rules of Practice and Procedure Regarding Issue Identification (Final Rule)
Order No. 675 PDF February 17, 2006 Procedures for Disposition of Contested Audit Matters (Final Rule)
Order No. 670 PDF January 19, 2006 Prohibition of Energy Market Manipulation (Final Rule) (see Prohibition of Energy Market Manipulation section for more detail)
RM05-35-000 PDF December 27, 2005 Standard of Review for Modifications to Jurisdictional Agreements
RM06-5-000 PDF November 21, 2005 Amendments to Codes of Conduct for Unbundled Sales Service and for Persons Holding Blanket Marketing Certificates
PL06-1-000 PDF October 20, 2005 Policy Statement on Enforcement
RM05-6-000 PDF September 16, 2005 Commission Authorization to Hold Interlocking Positions
Order No. 662 June 21, 2005 Critical Energy Infrastructure Information (Final Rule)
Order No. 649 August 3, 2004 Critical Energy Infrastructure Information (Final Rule)
RM01-5-000 PDF July 8, 2004 Electronic Tariff Filings (NOPR)
Order No. 647 PDF June 3, 2004 Notice Format and Technical Corrections (Final Rule)
Order No. 646 PDF
» Appendix B PDF
February 11, 2004 Quarterly Financial Reporting and Revisions to the Annual Reports (Final Rule)
PA02-2-000 PDF October 16, 2003 Fact-Finding Investigation of Potential Market Manipulation of Electric and Natural Gas Prices
EL01-118-000 PDF July 25, 2003 Investigation of Terms and Conditions of Public Utility Market-Based Rate Authorization
Order No. 630-A July 23, 2003 Critical Energy Infrastructure Information (Final Rule)
RT03-1-001 May 8, 2003 Order Denying Rehearing; Communications with Commission-Approved Market Monitors
Order No. 630 February 21, 2003 Critical Energy Infrastructure Information (Final Rule)
RT03-1-000 PDF January 16, 2003 Communications with Commission-Approved Market Monitors
PL02-5-000 PDF December 20, 2002 Statement of Administrative Policy on Separation of Functions
Order No. 623 PDF December 21, 2001 Amendment to Rules Governing Off-the-Record Communications (Final Rule)
RM98-1-002 November 9, 2001 State-Federal Regional Panels and Clarifying Order 607
Order No. 607-A November 21, 2000 Regulations Governing Off-the-Record Communications (Order on Rehearing and Clarification)
Order No. 607 September 15, 1999 Regulations Governing Off-the-Record Communications (Final Rule)
Order No. 604
May 26, 1999 Electronic Service of Documents (Final Rule)
Order No. 602
March 31, 1999 Complaint Procedures (Final Rule)
Order No. 589 August 16, 1996 Supplemental Standards of Ethical Conduct for Employees (Final Rule)
Order No. 578 April 12, 1995 Alternative Dispute Resolution (Final Rule)
Docket No. Date Title
RM09-8-000 PDF
June 18, 2009 Revised Mandatory Reliability Standards for Interchange Scheduling and Coordination (NOPR)
RM08-13-000 PDF
May 21, 2009 Transmission Relay Loadability Reliability Standard (Notice of Proposed Rulemaking)
Order No. 723 PDF
(RM08-12-000)
May 21, 2009 Western Electricity Coordinating Council regional Reliability Standard regarding automatic time error correction (Final Rule)
Order No. 708-B PDF
(RM07-21-001)
May 21, 2009 Blanket Authorization Under FPA Section 203 (Order on Rehearing)
Order 724 PDF
(RM08-16-000)
May 21, 2009 Electric Reliability Organization Interpretations of Specific Requirements of Frequency Response and Bias and Voltage and Reactive Control Reliability Standards (Final Rule)
Order No. 722 PDF
(RM08-11-000)
March 20, 2009 Version Two Facilities Design, Connections and Maintenance Reliability Standards (Final Rule)
RM08-19-000, RM09-5-000 and RM06-16-005 PDF March 19, 2009 Mandatory Reliability Standards for the Calculation of Available Transfer Capability, Capacity Benefit Margins, Transmission Reliability Margins, Total Transfer Capability, and Existing Transmission Commitments and Mandatory Reliability Standards for the Bulk-Power System (Notice of Proposed Rulemaking)
RM05-5-013 PDF March 19, 2009 Standards for Business Practices and Communication Protocols for Public Utilities (Notice of Proposed Rulemaking)
Order No. 890-C PDF
(RM05-17-004 and RM05-25-004)
March 19, 2009 Preventing Undue Discrimination and Preference in Transmission Service (Order on Rehearing and Clarification)
Order No. 706-B PDF
(RM06-22-000)
March 19, 2009 Mandatory Reliability Standards for Critical Infrastructure Protection Advisory (Order on Clarification)
Order No. 697-B PDF
(RM04-7-005)
December 19, 2008 Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities (Order on Rehearing)
RM08-16-000 PDF November 20, 2008 Electric Reliability Organization Interpretations of Frequency Response and Bias and Voltage and Reactive Control Reliability Standards (NOPR)
RM08-12-000 PDF November 20, 2008 Western Electricity Coordinating Council Regional Reliability Standard Regarding Automatic Time Error Correction (NOPR)
RM08-11-000 PDF October 16, 2008 Version Two Facilities Design, Connections and Maintenance Reliability Standards (NOPR)
Order No. 716 PDF
(RM08-3-000)
October 16, 2008 Mandatory Reliability Standard for Nuclear Plant Interface Coordination (Final Rule)
Order No. 715 PDF
(RM08-5-000)
September 19, 2008 Revisions to Forms, Statements and Reporting Requirements for Electric Utilities and Licensees (Final Rule)
RM06-22-000 PDF
September 18, 2008 Mandatory Reliability Standards for Critical Infrastructure Protection - Order on Proposed Clarification
Order No. 713 PDF
(RM08-7-000)
July 21, 2008 Modification of Interchange and Transmission Loading Relief Reliability Standards; and Electric Reliability Organization Interpretation of Specific Requirements of Four Reliability Standards (Final Rule)
Order No. 707-A PDF
(RM07-15-001)
July 17, 2008 Cross-Subsidization Restrictions on Affiliate Transactions (Order on Rehearing)
Order No. 708-A PDF
(RM07-21-001)
July 17, 2008 Blanket Authorization Under FPA Section 203 (Order on Rehearing)
Order No. 706-C PDF
(RM06-22-006)
June 18, 2009 Mandatory Reliability Standards for Critical Infrastructure Protection (Order Denying Request for Clarification)
Order No. 697-C PDF
(RM04-7-006)
June 18, 2009 Market-Based Rates for Wholesale Sales of Electric Energy, Services by Public Utilities (Order on Rehearing and Clarification)
Order No. 706-A PDF
(RM06-22-000)
May 16, 2008 Mandatory Reliability Standards for Critical Infrastructure Protection (Order on Rehearing)
RM08-7-000 PDF
April 21, 2008 Modification of Interchange and Transmission Loading Relief Reliability Standards; and Electric Reliability Organization Interpretation of Specific Requirements of Four Reliability Standards (NOPR)
AD08-7-000 PDF April 21, 2008 Annual Charges Assessments for Public Utilities (NOI)
RM08-3-000 PDF March 20, 2008 Mandatory Reliability Standard for Nuclear Plant Interface Coordination (NOPR)
Order No. 709 PDF March 11, 2008 Elimination of FERC Form No. 423 (Final Rule)
RM07-19-000 and AD07-7-000 PDF February 22, 2008 Wholesale Competition in Regions with Organized Electric Markets (NOPR)
Order No. 707 PDF
(RM07-15-000)
February 21, 2008 Cross-Subsidization Restrictions on Affiliate Transactions (Final Rule)
Order No. 708 PDF
(RM07-21-000)
February 21, 2008 Blanket Authorization Under FPA Section 203 (Final Rule)
Order No. 706 PDF
(RM06-22-000)
January 18, 2008 Mandatory Reliability Standards for Critical Infrastructure Protection (Final Rule)
RM08-5-000 PDF January 18, 2008 Revisions to Forms, Statements, and Reporting Requirements for Electric Utilities and Licensees (NOPR)
Order No. 705 PDF December 27, 2007 Facilities Design, Connections and Maintenance Reliability Standards (Final Rule)
RM04-7-003 PDF

December 14, 2007

Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities (Clarification)

RM07-15-000 PDF
July 20, 2007 Cross-Subsidization Restrictions on Affiliate Transactions (NOPR)
RM07-21-000 PDF
July 20, 2007 Blanket Authorization Under FPA Section 203 (NOPR)
Order No. 693-A PDF
(RM06-10-001)
July 19, 2007 Mandatory Reliability Standards for the Bulk-Power System (Order on Rehearing)
Order No. 688-A PDF
(RM06-10-001)
June 22, 2007 New PURPA Section 210(m) Regulations Applicable to Small Power Production and Cogeneration Facilities (Order on Rehearing)
Order No. 697 PDF
(RM04-7-000)
June 21, 2007 Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities (Final Rule)
Order No. 696 PDF
(RM07-11-000)
May 18, 2007 Applicability of Federal Power Act Section 215 to Qualifying Small Power Production and Cogeneration Facilities (Final Rule)
Order No. 689-A PDF
(RM06-12-000)
May 17, 2007 Regulations for Filing Applications for Permits to Site Interstate Electric Transmission Facilities (Order on Rehearing)
Order No. 679-B
(RM06-4-002)
April 19, 2007 Promoting Transmission Investment through Pricing Reform (Order on Rehearing)
RM07-11-000 PDF March 16, 2007 Applicability of Federal Power Act Section 215 to Qualifying Small Power Production and Cogeneration Facilities (NOPR)
Order No. 693 PDF
(RM06-16-000)
March 16, 2007 Mandatory Reliability Standards for the Bulk-Power System (Final Rule)
Order No. 667-C PDF
(RM05-32-003)
February 20, 2007 Repeal of the Public Utility Holding Company Act of 1935 and Enactment of the Public Utility Holding Company Act of 2005 (Final Order; Order Denying Rehearing)
Order No. 890 PDF
(RM05-17-000 & RM05-25-000)
February 16, 2007 Preventing Undue Discrimination and Preference in Transmission Service (Final Rule)
Order No. 679-A PDF
(RM06-4-001)
December 22, 2006 Promoting Transmission Investment through Pricing Reform (Order on Rehearing)
Order No. 689 PDF
(RM06-12-000)
November 16, 2006 Regulations for Filing Applications for Permits to Site Interstate Electric Transmission Facilities (Final Rule)
Order No. 681-A PDF
(RM06-8-001)
November 16, 2006 Long-Term Firm Transmission Rights in Organized Electricity Markets (Order on Rehearing)
RM96-1-027 and RM05-5-001 PDF October 25, 2006 Standards for Business Practices for Interstate Natural Gas Pipelines and Public Utilities (NOPR)
RR06-3-000 PDF October 24, 2006 Order conditionally accepting 2007 Business Plan and Budget of the North American Electric Reliability Corporation approving assessments to fund budgets and ordering compliance filings
RM06-16-000 PDF October 20, 2006 Mandatory Reliability Standards for the Bulk-Power System (NOPR)
Order No. 688 PDF
(RM06-10-000)
October 20, 2006 New PURPA Section 210(m) Regulations Applicable to Small Power Production and Cogeneration Facilities (Final Rule)
Order No. 669-B PDF (RM05-34-002) July 20, 2006 Transactions Subject to FPA Section 203 (Order on Rehearing of Order No. 669-A)
Order No. 2006-B PDF
(RM02-12-002)
July 20, 2006 Standardization of Small Generator Interconnection Agreements and Procedures (Order on Clarification)
Order No. 679 PDF
(RM06-4-000)
July 20, 2006 Promoting Transmission Investment through Pricing Reform (Final Rule)
Order No. 681 PDF
(RM06-8-000)
July 20, 2006 Long-Term Firm Transmission Rights in Organized Electricity Markets (Final Rule)
RM06-12-000 PDF June 16, 2006 Regulations for Filing Applications for Permits to Site Interstate Electric Transmission Corridors (NOPR)
Order No. 671-A PDF (RM05-36-001) May 22, 2006 Revised Regulations Governing Small Power Production and Cogeneration Facilities (Final Rule)
RM04-7-000 PDF May 19, 2006 Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities (NOPR)
RM05-25-000 and RM05-17-000 PDF May 19, 2006 Preventing Undue Discrimination and Preference in Transmission Service (OATT Reform) (NOPR)
RM01-10-005 PDF May 18, 2006 Standards of Conduct for Transmission Providers
Order No. 676 PDF (RM05-5-000) April 25, 2006 Standards for Business Practices and Communication Protocols for Public Utilities (Final Rule)
RM06-11-000 PDF April 24, 2006 Financial Accounting, Reporting and Records Retention Requirements Under the Public Utility Holding Company Act of 2005 (NOPR)
Order No. 667-A PDF (RM05-32-001) April 24, 2006 Repeal of the Public Utility Holding Company Act of 1935 and Enactment of the Public Utility Holding Company Act of 2005 (Final Rule)
Order No. 669-A PDF (RM05-34-001) April 24, 2006 Transactions Subject to FPA Section 203 (Final Rule)
Order No. 672-A PDF March 30, 2006 Rules Concerning Certification of the Electric Reliability Organization; and Procedures for the Establishment, Approval, and Enforcement of Electric Reliability Standards (Final Rule)
RM06-14-000 PDF February 16, 2006 Revisions to Record Retention Requirements for Unbundled Sale Service, Person Holding Blanket Marketing Certificates, and Public Utility Market-Based Rate Authorization Holders (NOPR)
Order No. 674 PDF (RM06-13-000) February 16, 2006 Conditions for Public Utility Market-Based Rate Authorization Holders (Final Rule)
EL06-16-000 PDF February 16, 2006 Order Revising Market-Based Rate Tariffs and Authorizations
RM01-10-005 PDF February 16, 2006 Interpretive Order Relating to the Standards of Conduct
Order No. 672 PDF (RM05-30-000) February 3, 2006 Rules Concerning Certification of the Electric Reliability Organization; and Procedures for the Establishment, Approval, and Enforcement of Electric Reliability Standards (Final Rule)
Order No. 671 PDF (RM05-36-000) February 2, 2006 Revised Regulations Governing Small Power Production and Cogeneration Facilities (Final Rule)
RM06-8-000 PDF February 2, 2006 Long-Term Transmission Rights in Markets Operated by Regional Transmission Organizations and Independent System Operators
RM06-10-000 PDF January 19, 2006 New PURPA Section 210(m) Regulations Applicable to Small Power Production and Cogeneration Facilities (NOPR)
Order No. 669 PDF (RM05-34-000) December 23, 2005

Transactions Subject to FPA Section 203 (Final Rule)

Order No. 668 PDF (RM04-12-000) December 16, 2005 Accounting and Financial Reporting for Public Utilities Including RTOs (Final Rule)
Order No. 661-A PDF
(RM05-4-001)
December 12, 2005 Clarification on Interconnection for Wind Energy rule (Order on Rehearing)
Order No. 667 PDF
(RM05-32-000)
December 8, 2005 Repeal of the Public Utility Holding Company Act of 1935 and Enactment of the Public Utility Holding Company Act of 2005  (Final Rule)
Order No. 2006-A PDF
(RM02-12-001)
November 22, 2005 Standardization of Small Generator Interconnection Agreements and Procedures (Order on Rehearing)
RM05-25-000 PDF September 16, 2005 Preventing Undue Discrimination and Preference in Transmission Services
RM01-12-000 PDF July 19, 2005 Order Terminating Standard Market Design (SMD) Proceeding
PL03-3-006 and AD03-7-006 PDF July 6, 2005 Order Further Clarifying Policy Statement on Natural Gas and Electric Price Indices
Order No. 2003-C June 16, 2005 Standardization of Generator Interconnection Agreements and Procedures, Order on Rehearing (Final Rule)
RM04-14-001 PDF June 16, 2005 Reporting Requirement for Changes in Status For Public Utilities With Market-Based Rate Authority
Order No. 661 PDF June 2, 2005 Interconnection for Wind Energy (Final Rule)
Order No. 658 PDF May 27, 2005 Modification of Nuclear Plant Decommissioning Trust Fund Guidelines (Final Rule)
Order No. 657 PDF May 27, 2005 Electronic Filing of the Application for Authorization for the Issuance of Securities or the Assumption of Liabilities (Final Rule)
RM05-17-000 PDF May 27, 2005 Information Requirements for Available Transfer Capability
RM05-16-000 PDF May 27, 2005 Generator Run Status Information
Order No. 2006 PDF May 12, 2005 Standardization of Small Generator Interconnection Agreements and Procedures (Final Rule)
RM05-5-000 PDF May 9, 2005 Standards for Business Practices and Communication Protocols for Public Utilities (NOPR)
Order No. 652 PDF
(RM04-14-000)
February 10, 2005 Reporting Requirement for Changes in Status For Public Utilities With Market-Based Rate Authority (Final Rule)
Order No. 2003-B December 20, 2004 Standardization of Generator Interconnection Agreements and Procedures, Order on Rehearing and Directing Compliance (Final Rule) (see Standards of Conduct for Transmission Providers section for more detail)
EL01-18-000 PDF May 19, 2004 Order Clarifying Market Behavior Rules
Order No. 2003-A March 5, 2004 Standardization of Generator Interconnection Agreements and Procedures (Order on Rehearing) (Final Rule)
EL01-118-000, EL01-118-001 PDF November 17, 2003 Market Behavior Rules
ER03-854-000, ER03-854-001 PDF July 25, 2003 Order Accepting Scarcity Pricing Proposal
Order No. 2003 July 24, 2003 Standardization of Generator Interconnection Agreements and Procedures (Final Rule)
RM02-12-000 PDF July 24, 2003 Standardization of Small Generator Interconnection Agreements and Procedures
PL03-3-000 PDF July 24, 2003 Policy Statement on Natural Gas and Electric Price Indices
RT01-87-001 PDF December 19, 2001 Commission paves way for optimally sized Midwest RTO
RT01-67-000 TXT March 28, 2001 Order Provisionally Granting RTO Status to GridFlorida
Order Directing Staff Investigation [eLibrary] July 26, 2000 Investigation of Electric Bulk Power Markets
Order No. 638 [TIF] March 9, 2000 Errata Notice, Open Access Same Time Information System and Standards of Conduct (Final Rule)
Order No. 638 [TIF] February 25, 2000 Standards of Conduct (Final Rule)
Order No. 2000A [TIF]
Bookmarked version PDF
February 25, 2000 Regional Transmission Organization (RTO) (Order on
Rehearing) (Final Rule)
Order No. 2000 (Complete Version) PDF
» Part 1 of 4 PDF
» Part 2 of 4 PDF
» Part 3 of 4 PDF
» Part 4 of 4 PDF
December 20, 1999 Regional Transmission Organization (RTO). The final rule requires all public utilities that own, operate or control interstate electric transmission to file by October 15, 2000, a proposal for a Regional Transmission Organization (RTO), or, alternatively, a description of any efforts made by the utility to participate in an RTO, the reasons for not participating and any obstacles to participation, and any plans for further work toward participation. The RTOs will be operational by December 15, 2001 (Final Rule)
ER98-1438-000 [TIF] September 16, 1998 Commission Approves Application of Ten Transmission-owning Public Utilities To Transfer Operational Control Of Their Jurisdictional Transmission Facilities To The Midwest Independent Transmission Operators
Order No. 888-C January 20, 1998 Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities (Order on Rehearing)
Order No. 889-B November 25, 1997 Open Access Same-Time Information System & Standards of Conduct (OASIS) (Order on Rehearing)
Order No. 888-B November 25, 1997 Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities (Order on Rehearing)
Order No. 888-A March 4, 1997 Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities (Order on Rehearing)
Order No. 889-A March 4, 1997 Open Access Same-Time Information System & Standards of Conduct (OASIS) (Order on Rehearing)
Order No. 889 April 24, 1996 OASIS: Open Access Same-Time Information System (formerly Real- Time Information Networks) and Standards of Conduct (Final Rule)
Order No. 888 April 24, 1996 Transmission Open Access. Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities (Final Rule)
ER93-465-006 PDF February 10, 1995 Order on Rehearing of Policy Issues, Florida Power and Light
RM93-19-000 PDF November 3, 1994 Inquiry Concerning the Commission's Pricing Policy for Transmission Services Provided by Public Utilities Under the Federal Power Act
ER93-465-000 PDF February 24, 1994 Order on Policy Issues, Florida Power and Light
Docket No. Date Title
RM09-2-000 PDF
July 16, 2009 Revision of contract reporting requirements of Intrastate Natural Gas Companies (Notice of Proposed Rulemaking)
Order No. 712-B PDF
(RM08-1-002, RM07-4-000 and RM06-21-000)
April 16, 2009 Promotion of a more efficient capacity release Market (Order on rehearing and clarification)
Order No. 704-B PDF
(RM07-10-002)
December 18, 2008 Transparency Provisions of Section 23 of the Natural Gas Act (Order on Rehearing and Clarification)
Order No. 712-A PDF
(RM08-1-001)
November 21, 2008 Promotion of a More Efficient Capacity Release Market (Order on Rehearing)
RM09-2-000 PDF November 20, 2008 Contract Reporting Requirements of Intrastate Natural Gas Companies (Notice of Inquiry)
Order No. 720 PDF
(RM08-2-000)
November 20, 2008 Pipeline Posting Requirements under Section 23 under Natural Gas Act (Final Rule)
RM96-1-029 PDF
September 18, 2008 Standards for Business Practices of Interstate Natural Gas Pipelines (NOPR)
Order No. 704-A PDF
(RM07-10-001)
September 18,2008 Transparency Provisions of Section 23 of the Natural Gas Act (Order on Rehearing and Clarification)
Order No. 710-A PDF
(RM07-9-001)
June 20, 2008 Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines
Order No. 712 PDF
(RM08-1-000)
June 19, 2008 Promotion of a More Efficient Capacity Release Market (Final Rule)
Order No. 710 PDF
(RM07-9-000)
March 21, 2008 Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines (Final Rule)
Order No. 686-C PDF
(RM06-7-003)
January 17, 2008 Revisions to the Blanket Certificate Regulations and Clarification Regarding Rates (Order Denying Rehearing)
RM08-2-000 PDF December 21, 2007 Pipeline Posting Requirements under Section 23 under Natural Gas Act (NOPR)
RM08-1-000 PDF November 15, 2007 Promotion of a More Efficient Capacity Release Market (NOPR)
Order No. 700 PDF
(RM07-17-000)
October 18, 2007 Revisions to Landowner Notification and Blanket Certificate Regulations (Final Rule)
RM07-9-000 PDF September 20, 2007 Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines  (NOPR)
Order No. 686-B PDF
(RM06-7-002)
September 20, 2007 Revisions to the Blanket Certificate Regulations and Clarification Regarding Rates (Order on Rehearing)
Order No. 698 PDF
(RM96-1-027)
June 25, 2007 Standards for Business Practices for Interstate Natural Gas Pipelines; Standards for Business Practices for Public Utilities (Final Rule)
Order No. 686-A PDF
(RM06-7-001)
June 22, 2007 Revisions to the Blanket Certificate Regulations and Clarification Regarding Rates (Order on Rehearing)
RM07-17 PDF June 22, 2007 Revisions to Landowner Notification and Blanket Certificate Regulations (NOPR)
RM07-10-000 PDF April 19, 2007 Transparency Provisions of Section 23 of the Natural Gas Act; Transparency Provisions of the Energy Policy Act (NOPR)
RM07-1-000 PDF
January 18, 2007 Standards of Conduct for Transmission Providers (NOPR)
Order 678-A PDF
(RM05-23-001 and AD04-11-001)
November 16, 2006 Rate Regulation of Certain Natural Gas Storage Facilities (Order on Clarification and Rehearing)
RM96-1-027 and RM05-5-001 PDF October 25, 2006 Standards for Business Practices for Interstate Natural Gas Pipelines and Public Utilities (NOPR)
Order No. 687 PDF
(RM06-1-000)
October 19, 2006 Regulations Implementing the Energy Policy Act of 2005; Coordinating the Processing of Federal Authorizations for Applications under Sections 3 and 7 of the Natural Gas Act and Maintaining a Complete Consolidated Record (Final Rule)
Order No. 686 PDF
(RM06-7-000)
October 19, 2006 Revisions to the Blanket Certificate Regulations and Clarification Regarding Rates (Final Rule)
Order No. 682 PDF
(RM06-18-000)
August 23, 2006 Revision of Regulations to Require Reporting of Damage to Natural Gas Pipeline Facilities (Final Rule)
Order No. 678 PDF (RM05-23-000 & AD04-11-000) June 19, 2006 Rate Regulation of Certain Natural Gas Storage Facilities (Final Rule)
RM06-7-000 PDF June 16, 2006 Revisions to the Blanket Certificate Regulations and Clarification Regarding Rates (NOPR)
RM06-1-000 PDF May 18, 2006 Regulations Implementing the Energy Policy Act of 2005: Coordinating the Processing of Federal Authorizations for Applications under Sections 3 and 7 of the Natural Gas Act and Maintaining a Complete Consolidated Record (NOPR)
RM06-14-000 PDF February 16, 2006 Revisions to Record Retention Requirements for Unbundled Sale Service, Person Holding Blanket Marketing Certificates, and Public Utility Market-Based Rate Authorization Holders (NOPR)
Order No. 673 PDF (RM06-5-000) February 16, 2006 Amendments to Codes of Conduct for Unbundled Sales Service and for Persons Holding Blanket Marketing Certificates (Final Rule)
RM05-23-000 and AD04-11-000 PDF December 22, 2005 Rate Regulation of Certain Underground Storage Facilities (NOPR)
Order No. 2005-A PDF
(RM05-1-001)
June 1, 2005 Regulations Governing the Conduct of Open Seasons for Alaska Natural Gas Transportation Projects (Order on Rehearing)
RM05-12-000 PDF May 27, 2005 Modification of Natural Gas Reporting Regulations (NOPR)
Order No. 587-S PDF
(RM96-1-026)
May 9, 2005 Standards for Business Practices of Interstate Natural Gas Pipelines, as corrected by errata notice issued June 14, 2005 (Final Rule)
Order No. 2005 PDF
(RM05-1-000)
February 9, 2005 Regulations Governing the Conduct of Open Seasons for Alaska Natural Gas Transportation Projects
Order No. 644 PDF
(RM03-10-001)
May 19, 2004 Order on Clarification of Code of Conduct to Jurisdictional Sellers (Final Rule)
Order No. 644 PDF
(RM03-10-000)
November 17, 2003 Code of Conduct to Jurisdictional Sellers (Final Rule)
Order No. 637-B
July 26, 2000 Order Denying Rehearing Concerning Regulation of Short-Term Natural Gas Transportation Services (Final Rule)
Order No. 637-A May 19, 2000 Order on Rehearing, Rehearing of Short-term Natural Gas Transportation Services, and Regulation of Interstate Natural Gas Transportation Services (Final Rule)
Order No. 637 February 9, 1999 Regulation of Short-term Natural Gas Transportation Services, and Regulation of Interstate Natural Gas Transportation Services (Final Rule)
Order No. 636-C November 27, 1992 Order Denying Rehearing and Clarifying Orders 636 and 636-A (Order on Rehearing)

Order No. 636-B November 27, 1992 Order Denying Rehearing and Clarifying Orders 636 and 636-A (Order on Rehearing)

Order No. 636-A August 3, 1992 Denying Rehearing in Part, Granting Rehearing in Part and Clarifying Order 636 (Order on Rehearing)
Order No. 636 April 9, 1992 Restructuring of Interstate Natural Gas Pipeline Services (Final Rule)
Docket No. Date Title
RM07-8-000 PDF February 15, 2007 Preliminary Permits for Wave, Current, and Instream New Technology Hydropower Projects (Interim Statement of Policy)
PL06-5-000 PDF September 21, 2006 Policy statement on hydropower licensing settlements
Order No. 655 PDF May 27, 2005 Modification of Hydropower Procedural Regulations, Including the Deletion of Certain Outdated or Non-essential Regulations (Final Rule)
Order No. 2002 PDF July 23, 2003 Hydroelectric Licensing (Final Rule)
Order No. 635 PDF July 23, 2003 Policy Statement on Consultation with Indian Tribes in Commission Proceedings (Final Rule)
Order No. 596 [TIF] October 29, 1997 Alternative Hydropower Licensing Process (Final Rule)
Docket No. Date Title
RM05-22-000 PDF March 21, 2006 Five-Year Review of Oil Pipeline Pricing Index
Order No. 656 PDF May 27, 2005 Revision of FERC Form No. 73, Oil Pipeline Data Filing Instructions (Final Rule)
Order No. 650 PDF August 27, 2004 Revisions to Oil Pipeline Regulations Pursuant to the Energy Policy Act of 1992 (Final Rule)
Order No. 634-A PDF October 23, 2003 Final Rule Regarding Regulation of Cash Management Practices
Order No. 634 PDF June 26, 2003 Interim Rule Regarding Regulation of Cash Management Practices
RM00-11-000 and RM00-11-001 PDF February 24, 2003 Five-Year Review of Oil Pipeline Pricing Index
Order No. 588 TXT July 19, 1996 Oil Pipeline Cost-of-Service Filing Requirements (Final Rule)
Order No. 572 TXT October 28, 1994 Market-based Ratemaking for Oil Pipelines (Final Rule)
Order No. 572-A TXT December 28, 1994 Market-based Ratemaking for Oil Pipelines (Final Rule) (Order denying rehearing)
Order No. 571 TXT October 28, 1994 Cost-of-Service Filing Requirements for Oil Pipelines (Final Rule)
Order No. 571-A TXT October 28, 1994 Cost-of-Service Filing Requirements for Oil Pipelines (Final Rule)
Order No. 561-A PDF July 28, 1994 Pipeline Regulations Pursuant to the Energy Policy Act of 1992 (Rehearing)
Order No. 561 PDF October 22, 1993 Pipeline Regulations Pursuant to the Energy Policy Act of 1992 (Final Rule)
Order No. 154-C PDF December 5, 1985 Order Denying Rehearing in Part, Modifying Opinion 154-B in Part, Clarifying That Opinion, and Denying Stay
Order No. 154-B PDF June 28, 1985 Trended Original Cost Model (TOC)





Updated: July 20, 2009