Prineville Reservoir Resource Management Plan |
|
Overview |
Launched in early 2001, the project consisted of a detailed planning process that culminated in the preparation of the RMP and State Park Master Plan in May 2003. The RMP is Reclamation's blueprint for the future use, management, and site development of the reservoir over the next ten years. For a hard copy of the document email Vicki Kellerman at vkellerman@pn.usbr.gov or call (208) 378-5326. |
Instructions for File Download | In order to view these PDF files, you must have Adobe Acrobat Reader software loaded on your computer. Download software from www.adobe.com. All text files provided are formatted for double sided printing. The figure files are listed individually to ensure print quality while minimizing download size. These files, both text and figures, are supplied at print-level quality. |
Environmental Assessment |
Table of Contents (428 kb) Figures (print-quality) |
Resource Management Plan | Cover
2,695 kb Figures |
Last Update: February 2, 2007 8:45 AM |