|
Analysis and Concepts
to Address Electric Infrastructure Needs, August 3, 2001
Workshop
Agenda [7K
PDF file]
Workshop Attendees
[8K
PDF file]
Papers
- Analytical
Needs for Transmission Modernization Understanding the Problem —
Paul Grant, Electric Power Research Institute (EPRI) [11.8MB
PDF file]
- An
Electric Utility's Power Transmission Modernization Needs — Syed
Ahmed and Richard Krause, Southern California Edison (SCE)
[346K
PDF file]
- HTS
2001 Peer Review Workshop: Analysis and Concepts to Address Electric
Infrastructure Needs — Rich Silberglitt, RAND [321K
PDF file]
- Factors
Influencing US Market Viability for HTS Applications — Fred Roach
and Alan Berscheid, Los Alamos National Laboratory (LANL)
[439K
PDF file]
- DOE
Transmission Reliability Program Overview — Phil Overholt, Transmission
Reliability Program, DOE [613K
PDF file]
- New
(Investment) Concepts for the Transmission Grid — Ray Coxe, TransEnergieUS,
Ltd [77K
PDF file]
- DOE
Electric Infrastructure Workshop — Robb Turner, ArcLight Capital
Holdings [43K
PDF file]
- Break
the Gridlock: New Technologies and New Policies to Promote True Power
Grid Competition — John Howe, American Superconductor Corp. (ASC)
[751K
PDF file]
- New
Concepts for the Transmission Grid — Steinar Dale, ABB
[660K
PDF file]
|