skip navigation
Text Size small medium large  


Legal Resources Arrow Court Cases Arrow Pending Cases - Listed Alphabetically

 
Pending Cases - Listed Alphabetically


    A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

    Albany Engineering Corp. v. FERC, No. 07-1162 (D.C. Cir. filed 5/25/2007)

      Complaint concerning assessment under New York law of headwater benefits that Fourth Branch's Mechanicville Project receives from operation of District's upstream Great Sacandaga Lake Project. Fourth Branch Assocs. (Mechanicville) v. Hudson River - Black River Regulating District, 117 FERC ¶ 61,321 PDF (2006), order on reh'g, 119 FERC ¶ 61,141 PDF (2007).
      FERC Docket No. EL06-91, et al.
      Assigned to: Judith Albert, Lona Perry
      Status: remanded 10/28/2008

    Alcoa Inc. v. FERC, No. 06-1426 (D.C. Cir. filed 12/29/2006)

      Certification of North American Electric Reliability Corp. as the Electric Reliability Organization for the United States under section 215 of the Federal Power Act, added by the Energy Policy Act of 2005. North American Electric Reliability Corp., 116 FERC ¶ 61,062PDF (2006), order on reh'g & compl., 117 FERC ¶ 61,126 PDF (2006).
      FERC Docket No. RR06-1
      Assigned to: Samuel Soopper
      Status: oral argument 3/20/2009

    Amaranth Advisors L.L.C., et al. v. FERC, Nos. 07-1491, et al. (D.C. Cir. filed 12/6/2007)

      Initiation of investigative and enforcement proceeding, directing various entities to show cause whey they have not engaged in unlawful manipulative trading of natural gas futures contracts. Amaranth Advisors L.L.C., et al., 120 FERC ¶ 61,085 PDF (2007), reh'g denied, 121 FERC ¶ 61,224 PDF (2007).
      FERC Docket No. IN07-26
      Assigned to: Robert Solomon
      Status: motions

    American Electric Power Service Corp. v. FERC, No. 09-1397 (7th Cir. filed 2/17/2009)

      Denial of complaint by AEP challenging the justness and reasonableness of the current rate designs under FERC-approved open access transmission tariffs administered by the Midwest ISO and PJM. American Electric Power Service Corp. v. Midwest Independent Transmission System Operator, Inc. and PJM Interconnection, L.L.C., 122 FERC ¶ 61,083 PDF (2008), order on reh’g, 125 FERC ¶ 61,341 PDF (2008).
      FERC Docket No. EL07-101, et al.
      Assigned to: Jennifer Amerkhail
      Status: in abeyance

    American Electric Power Service Corp. v. FERC, No. 08-1305 (D.C. Cir. filed 9/19/2008)

      Rates for reactive power service by Calpine, which owns a generating facility in Tulsa, OK interconnected with AEP, to Southwest Power Pool. Calpine Oneta Power, L.P., 116 FERC ¶ 61,282 PDF (2006), order on reh'g and compl., 119 FERC ¶ 61,177 PDF (2007), order on reh'g, 121 FERC ¶ 61,189 PDF (2007), reh'g denied, 124 FERC ¶ 61,193 PDF (2008).
      FERC Docket No. ER03-765
      Assigned to: Carol Banta
      Status: consolidated with D.C. Cir. No. 07-1275; briefing

    American Electric Power Service Corp. v. FERC, No. 07-1275 (D.C. Cir. filed 7/19/2007)

      Rates for reactive power service by Calpine, which owns a generating facility in Tulsa, Oklahoma interconnected with AEP, to Southwest Power Pool. Calpine Oneta Power, L.P., 116 FERC ¶ 61,282 PDF (2006), order on reh’g and compliance, 119 FERC ¶ 61,177 PDF (2007).
      FERC Docket No. ER03-765
      Assigned to: Carol Banta
      Status: briefing

    American Electric Power Service Corp., et al. v. FERC, Nos. 03-1223, et al. (D.C. Cir., filed Aug. 1, 2003).

      Conditional acceptance of proposals by the various Alliance Companies to join either the Midwest ISO or PJM. Alliance Cos., et al., 100 FERC ¶ 61,137 PDF (2002), order on reh'g, 103 FERC ¶ 61,274 PDF (2003).
      FERC Docket No. ER03-765
      Assigned to: Beth Pacella
      Status: in abeyance

    American Electric Power Service Corp., et al. v. FERC, Nos. 04-1017, et al. (D.C. Cir., filed Jan. 14, 2004 and later)

      Rates for regional “through and out” service between Midwest ISO and PJM. Midwest Independent Transmission System Operator, et al., 104 FERC ¶ 61,105 PDF (2003), order on reh'g, 105 FERC ¶ 61,212 PDF (2003).
      FERC Docket Nos. EL02-111, et al.
      Assigned to: Beth Pacella
      Status: abeyance

    American Gas Ass'n v. FERC, No. 08-1266 (D.C. Cir. filed 8/15/2008)

      Revisions to financial forms, statements and reports for natural gas companies, contained in FERC Form Nos. 2, 2-A, and 3-Q, to enhance their usefulness by updating market and cost information. Revisions to Forms, Statements and Reporting Requirements for Natural Gas Pipelines, Order No. 710, FERC Stats. & Regs. ¶ 31,267 PDF (2008), order on reh'g & clar., 123 FERC ¶ 61,278 PDF (2008).
      FERC Docket No. RM07-9
      Assigned to: Kathrine Henry
      Status: briefing


    American Public Power Ass’n, et al. v. FERC, Nos. 08-1382, et al. (D.C. Cir. filed 12/8/2008 and later)

      Denial of intervention in investigative proceeding resolved by settlement, concerning behavior of Edison Mission affiliates in PJM markets. In re Edison Mission, 123 FERC ¶ 61,170 PDF (2008), intervention denied & reh’g dismissed, 125 FERC ¶ 61,020 PDF (2008), reh’g denied by operation of law, 125 FERC ¶ 61,278 PDF (2008).
      FERC Docket No. IN08-3
      Assigned to: Samuel Soopper
      Status: motions


    Arkansas Public Service Comm'n, et al. v. FERC, Nos. 08-1330, et al. (D.C. Cir. filed 10/14/2008 and later)

      Order on remand from Louisiana Public Service Comm'n v. FERC, 482 F.3d 510 (D.C. Cir. 2007), on exclusion of interruptible load from the computation of peak load responsibility under Entergy System Agreement, and on refunds to Entergy's Louisiana customers. Louisiana Public Service Comm'n, et al. v. Entergy Corp., 120 FERC ¶ 61,241 PDF (2007), reh'g denied, 124 FERC ¶ 61,275 PDF (2008).
      FERC Docket No. EL00-66, et al.
      Assigned to: Carol Banta
      Status: motions


    B   Top of Page

    Black Oak Energy, L.L.C., et al. v. FERC, Nos. 08-1386, et al. (D.C. Cir. filed 12/12/2008)

      Complaint concerning allocation of transmission line losses to financial arbitrage transactions via a marginal methodology. Black Oak Energy, L.L.C., et al. v. PJM Interconnection, 122 FERC ¶ 61,208 PDF (2008), order on reh'g, 125 FERC ¶ 61,042 PDF (2008).
      FERC Docket No. EL08-14
      Assigned to: Samuel Soopper
      Status: in abeyance


    BP Pipelines (Alaska) Inc., et al. v. FERC and United States of America, Nos. 09-1025, et al. (D.C. Cir. filed 1/16/2009)

      Order affirming ALJ after hearing, concerning the Trans Alaska Pipeline System (TAPS) Carriers’ 2005 and 2006 interstate rate filings; finding that proposed rates are not just and reasonable, and ordering refunds. BP Pipelines (Alaska) Inc., et al., Opinion No. 502, 123 FERC ¶ 61,287 PDF (2008), order on reh’g & comp., 125 FERC ¶ 61,215 PDF (2008).
      FERC Docket No. IS05-82, et al.
      Assigned to: Beth Pacella
      Status: consolidated with D.C. Cir. 08-1270, et al.; in abeyance


    BP Pipelines (Alaska) Inc., et al. v. FERC and United States of America, Nos. 08-1269 to 08-1275 (D.C. Cir. filed 8/19/2008)

      Order affirming ALJ after hearing, concerning the Trans Alaska Pipeline System (TAPS) Carriers' 2005 and 2006 interstate rate filings; finding that proposed rates are not just and reasonable, and ordering refunds. BP Pipelines (Alaska) Inc., et al., Opinion No. 502, 123 FERC ¶ 61,287 PDF (2008), reh'g pending.
      FERC Docket No. IS05-82, et al.
      Assigned to: Beth Pacella
      Status: in abeyance

    BP West Coast Products LLC v. FERC, and United States of America No. 08-1237 (D.C. Cir. filed 7/3/2008)

      Dismissal of complaint alleging that SFPP's indexed rate increases for 2007 substantially exceeded its actual cost increases. BP West Coast Products LLC v. SFPP, L.P., 121 FERC ¶ 61,243 PDF (2007), order on reh'g, 123 FERC ¶ 61,121 PDF (2008).
      FERC Docket No. OR07-20
      Assigned to: Carol Banta
      Status: briefing

    BP West Coast Products LLC v. FERC and United States of America No. 08-1022 (D.C. Cir. filed 1/18/2008)

      Dismissal of complaint alleging that SFPP’s indexed rate increases for 2005 and 2006 substantially exceeded its actual cost increases.  BP West Coast Products, LLC, et al. v. SFPP, L.P., et al., 118 FERC ¶ 61,261 PDF (2007), order on reh’g, 121 FERC ¶ 61,195 PDF (2007). 
      FERC Docket No. OR07-3, et al.
      Assigned to: Carol Banta
      Status: consolidated with D.C. Cir. No. 07-1163; briefing

    C   Top of Page

    California Electricity Oversight Board, et al. v. FERC, Nos. 05-72328, et al. (9th Cir. filed 4/22/2005 and later)

      Approval of contested settlement between Avista and Trial Staff, resolving investigation of Avista’s trading activities. Avista Corp., et al., 107 FERC ¶ 61,055 PDF (2004), reh’g denied, 111 FERC ¶ 61,089 PDF (2005).
      FERC Docket No. EL02-115
      Assigned to: Robert Solomon
      Status: motions

    California Independent System Operator Corp. v. FERC, No. 06-1002 (D.C. Cir. filed 1/3/2006)

      Review of arbitrator's award granting PG&E's claim for reimbursement of $14.17 million paid to the ISO for ancillary services between 4/98 and 4/99. California Independent System Operator Corp., 107 FERC ¶ 61,152 PDF (2004), reh'g denied, 111 FERC ¶ 61,078 PDF (2005) clarification denied, 113 FERC ¶ 61,133 PDF (2005),
      FERC Docket No. EL02-45
      Assigned to: Beth Pacella
      Status: in abeyance

    California Trout, et al. v. FERC, Nos. 07-73664, et al. (9th Cir. filed 9/13/2007 and later)

      Denial of late intervention, after issuance of Environmental Assessment on proposed amendment, revising minimum flow and fishery requirements, to license for the California Aqueduct Project. California Dept. of Water Resources and the City of Los Angeles, 120 FERC ¶ 61,057 PDF (2007) (reh'g of notice denying late intervention), reh'g rejected, 120 FERC ¶ 61,248 PDF (2007); order on reh'g, 122 FERC ¶ 61,150 PDF (2008).
      FERC Docket No. P-2426
      Assigned to: Carol Banta, Holly Cafer, Kathrine Henry
      Status: oral argument 2/12/2009

    Calpine Energy Services, L.P. v. FERC, No. 09-1091 (D.C. Cir. filed 3/4/2009)

      Revised tariff sheets proposing new tariff provisions regarding gas quality and interchangeability. Maritime & Northeast Pipeline, L.L.C., 125 FERC ¶ 61,159 PDF (2008), order on reh'g, 126 FERC ¶ 61,119 PDF (2009).
      FERC Docket No. RP08-374
      Assigned to: Jennifer Amerkhail
      Status: motions

    Chehalis Power Generating, L.L.C. v. FERC, No. 08-1201 (D.C. Cir. filed 5/23/2008)

      Proposed rates for reactive power and voltage control service; treatment of filing as a rate change subject to suspension and refund. Chehalis Power Generating L.P., 112 FERC ¶ 61,144 PDF (2005), reh'g denied, 113 FERC ¶ 61,259 PDF (2005).
      FERC Docket No. ER05-1056
      Assigned to: Samuel Soopper
      Status: briefing

    Chevron-Texaco Products Co. v. FERC, No. 03-1183 (D.C. Cir., filed July 1, 2003)

      Dismissal of complaint alleging that SFPP charges unjust and unreasonable rates for the transportation of petroleum products on its East and West Lines. Chevron Products Co. v. SFPP, L.P., 99 FERC ¶ 61,196 PDF (2002), reh'g denied, PDF 100 FERC ¶ 61,329 PDF (2002) and 103 FERC ¶ 61,231 PDF (2003).
      FERC Docket No. OR02-4
      Assigned to: Lona Perry
      Status: in abeyance; 03-1420 dismissed 12/10/2004

    Cities of Anaheim, Azusa, Banning, Colton, Pasadena and Riverside, California v. FERC No. 07-1222 (D.C. Cir. filed 6/20/2007 and later)

      Must-offer and reliability service obligations in California; settlement and tariff filings to implement. Independent Energy Producers Ass’n v. California Independent System Operator, et al., 116 FERC ¶ 61,069 PDF (2006), 116 FERC ¶ 61,297 PDF (2006), and 118 FERC ¶ 61,097 PDF (2007) order on reh’g and compliance, 119 FERC ¶ 61,266 PDF (2007).
      FERC Docket No. EL05-146, et al.
      Assigned to: Beth Pacella
      Status: petition granted 2/27/2009

    Cities of Anaheim, Azusa, Banning, Colton, Pasadena and Riverside, Cal. v. FERC D.C. Cir. No. 08-1021 (D.C. Cir. filed 1/18/2008)

    City and County of San Francisco, Cal. v. FERC, No. 07-1513 (D.C. Cir. filed 12/14/2007)

      Tariff and compliance filings by California ISO to implement Market Redesign and Technology Upgrade (MRTU) proposal, to: ensure sufficient resources; fix flawed market rules; increase price transparency; improve transmission congestion management; and enhance market power mitigation. California Independent System Operator Corp., 116 FERC ¶ 61,274 PDF (2006), order on reh'g and clar., 119 FERC ¶ 61,076 PDF (2007), order on reh'g and tariff revisions, 120 FERC ¶ 61,023 PDF (2007), order on reh'g, 121 FERC ¶ 61,030 PDF (2007).
      FERC Docket No. ER06-615, et al.
      Assigned to: Beth Pacella
      Status: briefing

    In re: City of Idaho Falls, Idaho, et al., No. 09-1120 (D.C. Cir. filed 4/14/2009)

      Emergency Motion for Stay of updated list of charges hydropower licensees must pay for their use of federal lands. Update of the FERC’s Fee Schedule for Annual Charges for the Use of Government Lands, 74 Fed. Reg. 8184 PDF (Feb. 17, 2009).
      FERC Docket No. RM09-6
      Assigned to: Judith Albert
      Status: motions

    City of Palo Alto, et al. v. FERC, Nos. 04-1036, et al. (D.C. Cir. filed Jan 29, 2004 and later)

      Termination of Enron’s authority to trade electricity and natural gas at negotiated, market-based rates; denial of requests to participate as party-intervenors in an investigative/enforcement proceeding. Enron Power Marketing, Inc. and Enron Energy Services, Inc., et al., 102 FERC ¶ 61,316 PDF (2003) and 103 FERC ¶ 61,343 PDF (2003), reh’g denied, 106 FERC ¶ 61,024 PDF (2004); Fact-Finding Investigation of Potential Market Manipulation of Electric and Natural Gas Prices, et al., 105 FERC ¶ 61,063 PDF (2003), reh’g denied, 105 FERC ¶ 61,281 PDF (2003).
      FERC Docket Nos. EL03-77, et al.
      Assigned to: Robert Solomon
      Status: in abeyance pending resolution of 9th Cir. Nos. 03-72874, et al.

    Coalition of Midwest Transmission Customers v. FERC, No. 08-2893 (7th Cir. filed 7/30/2008 and later)

      Tariff revisions implementing ancillary services market and market-based pricing, and guidance on certain major design elements. Midwest Independent Transmission System Operator, Inc., 119 FERC ¶ 61,311 PDF (2007), reh'g denied, 120 FERC ¶ 61,202 PDF (2007), order on ancillary services filing, 122 FERC ¶ 61,172 PDF (2008), order on reh'g, 123 FERC ¶ 61,297 PDF (2008).
      FERC Docket No. ER07-550, et al.
      Assigned to: Robert Kennedy
      Status: record filed

    Colorado Interstate Gas Co. v. FERC, No. 08-1243 (D.C. Cir. filed 7/14/2008)

      Removal of certain costs associated with gas lost at CIG's Fort Morgan storage field from its lost and unaccounted-for and other fuel gas reimbursement percentage. Colorado Interstate Gas Co., 121 FERC ¶ 61,161 PDF (2007), order on reh'g, 123 FERC ¶ 61,183 PDF (2008).
      FERC Docket No. RP07-320
      Assigned to: Robert Kennedy
      Status: briefing


    Connecticut Dept. of Public Utility Control, et al. v. FERC, No. 09-1039, et al. (D.C. Cir. filed 1/28/2009)

      Transmission rate incentives in connection with transmission line construction projects. Northeast Utilities Service Co., 124 FERC ¶ 61,044 PDF (2008), reh’g denied, 126 FERC ¶ 61,052 PDF (2009); United Illuminating Co., 119 FERC ¶ 61,182 PDF (2007), reh’g denied, 126 FERC ¶ 61,043 PDF (2009).
      FERC Docket No. ER07-653, et al.
      Assigned to: Lona Perry
      Status: in abeyance


    Connecticut Dept. of Public Utility Control, et al. v. FERC, No. 08-1199 (D.C. Cir. filed 5/23/2008)

      Return on equity rate component sought by Transmission Owners in conjunction with establishment of ISO New England as a Regional Transmission Organization; ROE adjustments and incentives. Bangor Hydro-Electric Co., et al., Op. No. 489, 117 FERC ¶ 61,129 PDF (2006), reh'g denied, 122 FERC ¶ 61,265 PDF (2008).
      FERC Docket No. ER04-157, et al.
      Assigned to: Lona Perry
      Status: briefing

    Connecticut Dept. of Public Utility Control v. FERC, No. 08-1175 (D.C. Cir. filed 5/2/2008)

      Order on remand from Conn. Dept. v. FERC, 484 F.3d 558 (D.C. Cir. 2007); FERC jurisdiction over ISO-NE's proposed Installed Capacity Requirements for the 2005/2006 power year. ISO New England, Inc., 122 FERC ¶ 61,144 PDF (2008), reh'g denied, 123 FERC ¶ 61,036 PDF (2008).
      FERC Docket No. ER05-715
      Assigned to: Samuel Soopper
      Status: consolidated with D.C. Cir. No. 07-1375, et al., oral argument 5/12/2009

    Connecticut Dept. of Public Utility Control v. FERC, No. 07-1375 (D.C. Cir. filed 9/19/2007 and later)

      Revision of ISO-NE Market Rule 1, regarding determination of Installed Capacity Requirements for the New England Control Area; question of FERC jurisdiction to address. ISO New England, Inc., et al., 118 FERC ¶ 61,157 PDF (2007), reh'g denied, 120 FERC ¶ 61,234 PDF (2007); Jurisdiction to consider ISO-NE 2007/2008 Installed Capacity Requirements. ISO New England, Inc., et al., 119 FERC ¶ 61,161 PDF (2007), reh'g denied, 121 FERC ¶ 61,125 PDF (2007).
      FERC Docket No. ER07-365, et al.
      Assigned to: Samuel Soopper
      Status: oral argument 5/12/2009

    County of Suffolk, New York, et al. v. FERC, Nos. 08-5087, et al. (2nd Cir. filed 10/17/2008 and later)

      Certification of Broadwater liquefied natural gas terminal in Long Island Sound and related pipeline facilities. Broadwater Energy LLC & Broadwater Pipeline LLC, 122 FERC ¶ 61,255 PDF (2008), reh'g denied, 124 FERC ¶ 61,225 PDF (2008).
      FERC Docket No. CP06-54 through CP06-56 et al.
      Assigned to: Beth Pacella
      Status: briefing


    Cross Hudson, LLC v. FERC No. 08-1120 (D.C. Cir. filed 3/17/2008)

      Placement in interconnection queue for competing transmission projects to serve New York City. Hudson Transmission Partners v. New York ISO, 120 FERC ¶ 61,179 PDF (2007), reh'g denied, 122 FERC ¶ 61,024 PDF (2008).
      FERC Docket No. EL07-70
      Assigned to: Beth Pacella
      Status: in abeyance

    Crown Hydro, LLC v. FERC, No. 05-3079 (8th Cir. filed 7/28/2005)

      Denial of application to amend license to relocate project powerhouse in city park requiring condemnation. Crown Hydro, LLC, 110 FERC ¶ 62,121 PDF (2005), reh'g denied, 111 FERC ¶ 61,315 PDF (2005).
      FERC Docket No. P-11175
      Assigned to: Samuel Soopper
      Status: in abeyance

    D   Top of Page

    DC Energy Midwest, LLC v. FERC, No. 06-1423 (D.C. Cir. filed 12/22/2007)

      Order on proposed revisions to Midwest ISO Tariff (TEMT) to amend and clarify provisions of its real-time revenue sufficiency guarantee. Midwest Independent Transmission System Operator, Inc., 115 FERC ¶ 61,108 PDF (2006), order on reh'g, 117 FERC ¶ 61,113 PDF (2006).
      FERC Docket No. ER04-691
      Assigned to: Judith Albert
      Status: in abeyance

    Delaware Dept. of Natural Resources and Environmental Control v. FERC, No. 07-1007 (D.C. Cir. filed 1/12/2007)

      Conditional approval, pending necessary state approvals, of Crown Landing's application to construct and operate a liquefied natural gas terminal in Logan Township, Gloucester County, New Jersey. Crown Landing LLC, 115 FERC ¶ 61,348 PDF (2006), reh'g denied, 117 FERC ¶ 61,209 PDF (2006).
      FERC Docket No. CP04-411
      Assigned to: Samuel Soopper
      Status: petition dismissed for lack of jurisdiction

    Duquesne Light Co. v. FERC, No. 08-1350 (D.C. Cir. filed 11/3/2008)

      Conditional withdrawal of Duquesne from PJM RTO and transfer of membership to Midwest ISO RTO. Midwest Independent Transmission System Operator, Inc., and Duquesne Light Co., 122 FERC ¶ 61,039 PDF (2008), order on reh'g & compl., 124 FERC ¶ 61,219 PDF (2008).
      FERC Docket No. ER08-1235, et al.
      Assigned to: Kathrine Henry
      Status: voluntary dismissal granted 2/6/2009


    E   Top of Page

    Eastern Niagara Public Power Alliance, et al. v. FERC, No. 07-1472 (D.C. Cir. filed 11/19/2007)

      Issuance of new license to NYPA, for continued operation of the 2755 MW Niagara Project; denial of various objections to relicensing raised by various public power entities. New York Power Authority, 118 FERC ¶ 61,206 PDF (2007), order on reh'g and clar., 120 FERC ¶ 61,266 PDF (2007).
      FERC Docket No. P-2216
      Assigned to: Robert Kennedy
      Status: petition denied 3/13/2009

    E.ON U.S. LLC v. FERC, No. 07-1486 (D.C. Cir. filed 12/3/2007)

      Affirmance of ALJ Initial Decision accepting proposed pricing of reactive power services. Bluegrass Generation Co., L.L.C., 118 FERC ¶ 61,214 PDF (2007), reh'g denied, 121 FERC ¶ 61,018 PDF (2007).
      FERC Docket No. ER05-522, et al.
      Asssigned to: Beth Pacella
      Status: in abeyance; related to D.C. Cir. No. 07-1143

    E.ON U.S. LLC v. FERC, No. 07-1143 (D.C. Cir. filed 5/15/2007)

      Filing by Bluegrass to specify cost-based revenue requirement for providing reactive power service; directive to LG&E to modify Schedule 2 of its open access transmission tariff to compensate all generators on a comparable basis. Bluegrass Generation Co., L.L.C., 117 FERC ¶ 61,052 PDF (2006), order on reh'g, 119 FERC ¶ 61,215 PDF (2007).
      FERC Docket No. ER06-1382
      Assigned to: Beth Pacella
      Status: in abeyance

    E.O.N. U.S. LLC, et al. v. FERC, Nos. 07-1138, et al. (D.C. Cir. filed 5/14/2007)

      Order on proposed revisions to Midwest ISO Tariff (TEMT) to amend and clarify provisions of its real-time revenue sufficiency guarantee. Midwest Independent Transmission System Operator, Inc., 115 FERC ¶ 61,108 PDF (2006), order on reh'g, 117 FERC ¶ 61,113 PDF (2006). order on reh'g, 118 FERC ¶ 61,212 PDF (2007).
      FERC Docket No. ER04-691
      Assigned to: Judith Albert
      Status: related to D.C. Cir. No. 06-1423; in abeyance


    Edison Mission Energy, Inc., et al. v. FERC, Nos. 09-1006, et al. (D.C. Cir. filed 1/8/2009)

      Complaints regarding allocation of Revenue Sufficiency Guarantee charges to market participants under Midwest ISO tariff. Ameren Services Co., et al. v. Midwest Independent Transmission System Operator, 121 FERC ¶ 61,205 PDF (2007), order on reh'g, 125 FERC ¶ 61,162 PDF (2008).
      FERC Docket No. EL07-86, et al.
      Assigned to: Judith Albert
      Status: related to D.C. Cir. Nos. 06-1423, et al., in abeyance


    Electric Plant Board of the City of Paducah, Kentucky v. FERC, Nos. 07-1518, et al. (D.C. Cir. filed 12/17/2007 and later)

      Denial of request to use the traditional licensing process and for other relief with respect to Paducah's effort to file an application for a license for the Robert Byrd Project on the Ohio River in West Virginia and Ohio. Electric Plant Board of the City of Paducah, Kentucky, 121 FERC ¶ 61,051 PDF (2007) (denying reh'g of 8/16/07 staff letter order), reh'g denied, 122 FERC ¶ 61,026 PDF (2008); 122 FERC ¶ 61,149 PDF (2008) (denying reh'g of 12/20/07 staff letter order).
      FERC Docket No. P-12911
      Assigned to: Holly Cafer
      Status: voluntarily dismissed 12/19/2008

    El Paso E&P Co., L.P. v. FERC, No. 07-1403 (D.C. Cir. filed 10/5/2007)

      Market-based rate sales between Deseret and its member cooperatives. Deseret Generation & Transmission Cooperative, Inc., 115 FERC ¶ 61,306 PDF (2006), order on reh'g, 120 FERC ¶ 61,139 PDF (2007).
      FERC Docket No. ER06-861
      Assigned to: Beth Pacella
      Status: in abeyance


    Energy Transfer Partners, L.P., et al. v. FERC, No. 08-60730, et al. (5th Cir. filed 8/11/2008 and later)

      Direction to show cause, and subsequent decision to set for hearing, why ETP entities did not manipulate wholesale natural gas markets, or otherwise did not provide discriminatory services or charge excessive rates, in violation of the NGA, NGPA, and implementing regulations; whether/when ETP entities are entitled to de novo district court review. Energy Transfer Partners, L.P., et al., 123 FERC ¶ 61,168 PDF (2008), reh'g denied, 124 FERC ¶ 61,149 PDF (2008).
      FERC Docket No. IN06-3
      Assigned to: Carol Banta, Robert Kennedy
      Status: oral argument 3/2/2009

    Entergy Services, Inc. v. FERC, No. 07-1343 (D.C. Cir. filed 8/24/2007)

      Opinion, reversing ALJ initial decision, that certain general billing provisions and principles in the 1977 agreement between Entergy Arkansas and Arkansas Electric Cooperative do not permit Entergy to take transmission system operating constraints into account in determining availability of Arkansas Electric's generating units for purposes of billing. Arkansas Electric Coop. Corp. v. Entergy Arkansas, Inc., Opinion No. 488, 117 FERC ¶ 61,099 PDF (2006), order on reh'g, 119 FERC ¶ 61,314 PDF (2007).
      FERC Docket No. EL05-15
      Assigned to: Samuel Soopper
      Status: oral argument 10/7/2008


    EPIC Merchant Energy, L.P., et al. v. FERC, No. 08-1395 (D.C. Cir. filed 12/23/2008)

      Order on compliance filing regarding allocation of real-time Revenue Sufficiency Guarantee costs. Midwest Independent Transmission System Operator, Inc., 121 FERC ¶ 61,132 PDF (2007), order on reh’g, 125 FERC ¶ 61,156 PDF (2008).
      FERC Docket No. ER04-691
      Assigned to: Judith Albert
      Status: in abeyance; consolidated with D.C. Cir. No. 06-1423


    Exxon Mobil Corp. v. FERC, No. 08-1158 (D.C. Cir. filed 4/21/2008)
      Order on compliance, concerning classification of facilities and availability of transmission credits. Exxon Mobil Corp. v. Entergy Services, Inc., 120 FERC ¶ 61,051 PDF (2007), reh'g denied, 122 FERC ¶ 61,168 PDF (2008).
      FERC Docket No. EL03-230
      Assigned to: Jeffery Dennis, Beth Pacella
      Status: in abeyance

    Exxon Mobil Corp., et al. v. FERC, Nos. 07-1306, et al. (D.C. Cir. filed 8/6/2007 and later)

      Order on complaint concerning classification of facilities and availability of transmission credits. Exxon Mobil Corp. v. Entergy Services, Inc., 118 FERC ¶ 61,032 PDF (2007), reh'g denied, 119 FERC ¶ 61,261 PDF (2007); Union Power Partners, L.P. v. Entergy Services, Inc., et al., 118 FERC ¶ 61,134 PDF (2007), reh'g denied, 119 FERC ¶ 61,328 PDF (2007); and related orders.
      FERC Docket No. EL03-230, et al.
      Assigned to: Beth Pacella, Samuel Soopper
      Status: oral argument 11/14/2008

    ExxonMobil Oil Corp., et al. v. FERC and United States of America, Nos. 07-1163, et al. (D.C. Cir. filed 5/25/2007)

      Dismissal of complaint alleging that SFPP's indexed rate increases for 2005 and 2006 substantially exceeded its actual cost increases. BP West Coast Products, LLC, et al. v. SFPP, L.P., et al., 118 FERC ¶ 61,261 PDF (2007).
      FERC Docket No. OR07-3, et al.
      Assigned to: Carol Banta
      Status: briefing

    ExxonMobil Oil Corp., et al. v. FERC and United States of America, Nos. 06-1008, et al. (D.C. Cir. filed 1/5/2006 and later)

      Order on ALJ's initial decision and on certain remanded issues, concerning rates for SFPP's East and West Lines. SFPP, L.P., et al., 113 FERC ¶ 61,277 PDF (2005).
      FERC Docket No. OR92-8, et al.
      Assigned to: Lona Perry
      Status: in abeyance

    F   Top of Page

    Flint Hills Resources Alaska, LLC v. FERC and United States of America, No. 06-1361 (D.C. Cir. filed 10/27/2006)

      Acceptance of tariff sheets filed to comply with Opinion No. 481 series of orders (concerning TAPS “Quality Bank”). BP Pipelines (Alaska) Inc., et al., 116 FERC ¶ 61,208 PDF (2006).
      FERC Docket No. IS06-466, et al.
      Assigned to: Beth Pacella
      Status: motion for voluntary remand granted and case held in abeyance 1/22/2008

    Florida Gas Transmission Co., et al. v. FERC, Nos. 07-1533, et al. (D.C. Cir. filed 12/32/2007 and later)

      Various issues, after hearing and ALJ Initial Decision, concerning gas quality and interchangeability tariff standards to accommodate the introduction of re-gasified liquefied natural gas into the Market Area of Florida Gas. AES Ocean Express LLC v. Florida Gas Transmission Co., et al., 119 FERC ¶ 61,075 PDF (2007) (Op. 495), order on reh'g, 121 FERC ¶ 61,267 PDF (2007), and related letter orders.
      FERC Docket No. RP04-249, et al.
      Assigned to: Judith Albert
      Status: record filed 1/27/2009


    Florida Municipal Power Agency v. FERC, No. 09-1060 (D.C. Cir. filed 2/12/2009)

      Holding that Florida Power employed comparable standards to analyze the integration of Florida Municipal’s Fort Pierce-Vero Beach facilities in 1994 and Florida Power’s looped transmission facilities. Florida Power & Light Co., 122 FERC ¶ 61,159 PDF (2008), reh’g denied, 125 FERC ¶ 61,344 PDF (2008).
      FERC Docket No. ER93-465, et al.
      Assigned to: Judith Albert
      Status: briefing


    Freeport-McMoran Corp., et al. v. FERC, Nos. 08-1349, et al. (D.C. Cir. filed 11/3/2008 and later)

      Continued applicability of Article 11.2 of El Paso's 1996 Settlement, placing certain limitations on the rates that El Paso can charge in future rate cases to shippers that were parties to the 1996 Settlement. El Paso Natural Gas Co., 114 FERC ¶ 61,290 PDF (2006), order on reh'g & compl, 124 FERC ¶ 61,227 PDF (2008).
      FERC Docket No. RP05-422 et al.
      Assigned to: Beth Pacella
      Status: in abeyance


    Friends of the River v. FERC, No. 08-71593 (9th Cir. filed 4/16/2008)
      Denials of late intervention, after issuance of Environmental Assessment on proposed amendment, revising minimum flow and fishery requirements, to license for the California Aqueduct Project. California Dept. of Water Resources and the City of Los Angeles, 122 FERC ¶ 61,150 PDF (2008) (reh'g of notice denying late intervention).
      FERC Docket No. P-2426
      Assigned to: Holly Cafer
      Status: consolidated with 9th Cir. No. 07-73664, et al.; oral argument 2/12/2009

    G   Top of Page

    Great Lakes Utilities, et al. v. FERC, No. 08-1389 (D.C. Cir. filed 12/19/2008)

      Revisions to Midwest ISO tariff to address long-term resource adequacy requirements. Midwest Independent Transmission System Operator, Inc., 122 FERC ¶ 61,283 PDF (2008), order on reh’g, 125 FERC ¶ 61,061 PDF (2008).
      FERC Docket No. ER08-394
      Assigned to: Holly Cafer
      Status: dismissed 2/26/2009


    Green Island Power Authority and Adirondack Hydro Development Corp. v. FERC, Nos. 07-1737, et al. (2d Cir. filed 4/26/2007 and later)

      Relicensing of School Street Project on the Mohawk River in New York; efforts to develop and construct competing Cohoes Falls Project. Erie Boulevard Hydropower, L.P., 117 FERC ¶ 61,189 PDF (2006), reh'g rejected, 118 FERC ¶ 61,196 PDF (2007), order on reh'g, 118 FERC ¶ 61,101 PDF (2007), and various notices rejecting pleadings.
      FERC Docket No. P-2539
      Assigned to: Holly Cafer
      Status: oral argument 12/19/2008


    Gulf South Pipeline Co., LP v. FERC, No. 09-1022 (D.C. Cir. filed 1/16/2009)

      Authorization to Gulf South to construct and operate 111 miles of pipeline (Southeast Expansion Project); rejection of Gulf South proposal to charge incremental plus pricing. Gulf South Pipeline Co., LP, 120 FERC ¶ 61,291 PDF (2007), 122 FERC ¶ 61,162 PDF (2008), 123 FERC ¶ 61,322 PDF (2008), and 125 FERC ¶ 61,199 PDF (2008).
      FERC Docket No. CP07-32
      Assigned to: Jennifer Amerkhail
      Status: briefing


    H   Top of Page

    Homestead Energy Resources, LLC v. FERC, No. 08-11986 (11th Cir. filed 4/21/2008)
      Termination of hydroelectric license for failure to commence construction of project by statutory deadline. Homestead Energy Resources, LLC, 121 FERC ¶ 61,153 PDF (2007), reh'g denied, 122 FERC ¶ 61,148 PDF (2008).
      FERC Docket No. P-7115
      Assigned to: Carol Banta
      Status: motions

    Honeywell International Inc. v. FERC, No. 08-1313 (D.C. Cir. filed 9/25/2008)

      Revision of Columbia Gas's tariff sheets to implement daily delivery point scheduling penalties to coincide with anticipated launch date of new Electronic Bulletin Board and gas management system. Columbia Gas Transmission Corp., 119 FERC ¶ 61,267 PDF (2007), order on reh'g & compl., 124 FERC ¶ 61,122 PDF (2008).
      FERC Docket No. RP07-340
      Assigned to: Samuel Soopper
      Status: dismissed 2/24/2009

    H.Q. Energy Services (U.S.), Inc., et al. v. FERC, Nos. 07-1379, et al. (D.C. Cir. filed 9/21/2007)

      Market rules proposed by ISO New England to implement New England Forward Capacity Market. ISO New England, Inc., 119 FERC ¶ 61,045 PDF (2007), order on reh'g & clar., 120 FERC ¶ 61,087 PDF (2007).
      FERC Docket No. ER07-546
      Assigned to: Kathrine Henry
      Status: in abeyance

    I   Top of Page

    Iberdrola Renewables Inc. v. FERC, No. 08-1195 (D.C. Cir. filed 5/16/2008)

      Order accepting increase in Alliance's negotiated rates to reflect increase in Alliance's costs. Alliance Pipeline L.P., 121 FERC ¶ 61,309 PDF (2007), reh'g denied, 122 FERC ¶ 61,250 PDF (2008).
      FERC Docket No. RP00-445
      Assigned to: Judith Albert
      Status: waiting for argument date

    Illinois Commerce Commission v. FERC, No. 08-2124 (7th Cir. filed 5/6/2008)
      Order addressing baseline transmission expansion projects submitted pursuant to PJM Regional Transmission Expansion Plan. PJM Interconnection, L.L.C., 119 FERC ¶ 61,067 PDF (2007), order on reh'g & compl., 122 FERC ¶ 61,217 PDF (2008).
      FERC Docket No. ER06-456, et al.
      Assigned to: Jennifer Amerkhail, Carol Banta
      Status: consolidated with 7th Cir. No. 08-1306, oral argument 4/13/2009

    Illinois Commerce Commission, et al. v. FERC Nos. 08-1306, et al. (7th Cir. filed 2/8/2008 and later)

      Order, after hearing and ALJ Initial Decision, on transmission rate design in PJM for recovery of costs of existing, new, and high-voltage facilities. PJM Interconnection, L.L.C., Op. No. 494, 119 FERC ¶ 61,063 PDF (2007), order on reh'g & compl., Op. No. 494-A, 122 FERC ¶ 61,082 PDF (2008).
      FERC Docket No. EL05-121
      Assigned to: Jennifer Amerkhail, Carol Banta
      Status: oral argument 4/13/2009

    Imperial Irrigation District v. FERC, No. 07-1470 (D.C. Cir. filed 11/19/2007)

      Order granting California ISO's petition for a declaratory order regarding its proposed financing mechanism for the construction of interconnection facilities to connect location-constrained resources to the ISO-controlled grid. California Independent System Operator Corp., 119 FERC ¶ 61,061 PDF (2007), order on reh'g and clar., 120 FERC ¶ 61,244 PDF (2007).
      FERC Docket No. EL07-33
      Assigned to: Jennifer Amerkhail
      Status: in abeyance

    Integrys Energy Group, Inc. v. FERC, D.C. Cir. No. 08-1032 (D.C. Cir. filed 1/25/2008)

      Allocation of marginal loss surplus refund with the Midwest ISO and calculation of refunds for over-collected marginal losses. Midwest Independent Transmission System Operator, Inc., 119 FERC ¶ 61,207 PDF & ¶ 61,216 PDF (2007), order on reh'g, 121 FERC ¶ 61,208 PDF (2007).
      FERC Docket No. ER04-691, et al.
      Assigned to: Judith Albert
      Status: petition denied 2/4/2009, petition for rehearing denied 4/6/2009


    Interstate Natural Gas Ass’n of America, et al. v. FERC, Nos. 09-1016, et al. (D.C. Cir. filed 1/15/2009)

      Revisions to the Commission’s Part 284 regulations concerning the release of firm capacity by shippers on interstate natural gas pipelines in order to enhance the efficiency and effectiveness of the secondary capacity release market. Promotion of a More Efficient Capacity Release Market, Order No. 712, 73 Fed. Reg. 37058, FERC Stats. & Regs. ¶ 31,271, 123 FERC ¶ 61,286 PDF (2008), order on reh'g & compl., Order No. 712-A, 125 FERC ¶ 61,216 PDF (2008).
      FERC Docket No. RM08-1
      Assigned to: Lona Perry
      Status: motions


    J   Top of Page

    Jackson County, North Carolina, et al. v. FERC, No. 08-1224 (D.C. Cir. filed 6/20/2008)

      Surrender of license for 225 kW Dillsboro Project on Tuckasegee River in Jackson County, North Carolina, and dismissal of application for subsequent license; removal of project dam and powerhouse. Duke Energy Carolinas, LLC, 120 FERC ¶ 61,054 PDF (2007), order on reh'g & clar., 123 FERC ¶ 61,069 PDF (2008).
      FERC Docket No. P-2602
      Assigned to: Jennifer Amerkhail
      Status: briefing

    James Lichoulas, Jr. v. FERC, No. 08-1373 (D.C. Cir. filed 11/26/2008)

      Termination by implied surrender of license for the Appleton Trust Project in Lowell, Massachusetts. James Lichoulas, Jr., 124 FERC ¶ 61,255 PDF (2008), reh'g denied, 125 FERC ¶ 61,195 PDF (2008).
      FERC Docket No. P-9300
      Assigned to: Carol Banta
      Status: motions


    Joseph M. Keating v. FERC No. 08-1005 (D.C. Cir. filed 1/7/2008)

      Lifting of 1996 stay of construction deadlines, for failure to obtain necessary approvals and to commence construction, for proposed Tungstar Project. Joseph M. Keating, 120 FERC ¶ 61,246 PDF (2007), reh'g dismissed, 121 FERC ¶ 61,192 PDF (2007), stay denied, 122 FERC ¶ 61,027 PDF (2008).
      FERC Docket No. P-7267
      Assigned to: Holly Cafer, Robert Kennedy
      Status: oral argument 4/14/2009

    K   Top of Page

    KeySpan-Ravenswood, LLC v. FERC, Nos. 07-1278, et al. (D.C. Cir. filed 7/26/2007 and later)

      Denial of complaint seeking compensation from the New York ISO for incremental costs incurred by KeySpan during summer 2006 when burning fuel oil, rather than less expensive natural gas, under a local reliability rule. KeySpan Ravenswood LLC v. New York Independent System Operator, 119 FERC ¶ 61,089 PDF (2007), reh'g denied, 119 FERC ¶ 61,319 PDF (2007); Acceptance of NYISO filing to provide recovery to dual-fuel generators of the variable costs of burning alternative fuels pursuant to local reliability rule (Minimum Oil Burn Rule). New York ISO, Inc., 119 FERC ¶ 61,130 PDF (2007), reh'g denied, 121 FERC ¶ 61,039 PDF (2007).
      FERC Docket No. EL07-35, et al.
      Assigned to: Kathrine Henry
      Status: waiting decision on the briefs

    L   Top of Page

    Latha Anderson, et al. v. FERC Nos. 08-1131, et al. (D.C. Cir. filed 3/24/2008 and later)

      Certificate authorization to construct and operate a new interstate natural gas pipeline in Georgia and South Carolina to transport new volumes of vaporized liquefied natural gas from Elba Island LNG terminal. Southern LNG, Inc., et al., 120 FERC ¶ 61,258 PDF (2007), reh'g denied, 122 FERC ¶ 61,137 PDF (2008).
      FERC Docket No. CP06-470 to 474
      Assigned to: Carol Banta
      Status: oral argument 5/14/2009

    Louisiana Public Service Commission v. FERC, Nos. 07-1228 (D.C. Cir. filed 6/25/2007)

      Compliance and timing issues concerning Opinion No. 480 orders and amendment to Entergy System Agreement to maintain rough equalization of production costs among the Entergy System operating companies. Louisiana Public Service Comm’n v. Entergy Services, Inc., 117 FERC ¶ 61,203 PDF (2006), order on reh’g and compliance, 119 FERC ¶ 61,095 PDF (2007).
      FERC Docket No. EL01-88
      Assigned to: Beth Pacella
      Status: oral argument 5/8/2009

    M   Top of Page

    Madison Gas and Electric Co., et al. v. FERC, No. 08-1249 (D.C. Cir. filed 7/15/2008)

      Acceptance of Midwest ISO proposal to offer long-term firm transmission rights. Midwest Independent Transmission System Operator, Inc., 121 FERC ¶ 61,062 PDF (2007), order on reh'g, 123 FERC ¶ 61,178 PDF (2008).
      FERC Docket No. ER07-478
      Assigned to: Judith Albert
      Status: in abeyance

    Metro Hydroelectric Co., LLC v. FERC, No. 07-1514 (D.C. Cir. filed 12/17/2007)

      Termination of Integrated Licensing Process for the Metro Project in Summit County, Ohio, because Metro was unable to conduct certain pre-license application studies. Metro Hydroelectric Co., 121 FERC ¶ 61,049 PDF (2007), and earlier delegated letter orders.
      FERC Docket No. P-12484
      Assigned to: Carol Banta
      Status: in abeyance

    In re: Minnesota Municipal Power Agency, No. 09-1069 (D.C. Cir. filed 2/20/2009)

      Petition for a writ of prohibition, to prevent FERC in its Nov. 7, 2008 order from retroactively altering rates and terms established in earlier order, on allocation of revenue sufficiency guarantee (RSG) costs. Midwest Independent Transmission System Operator, Inc., 125 FERC ¶ 61,156 PDF (2008), and earlier orders.
      FERC Docket No. ER04-691, et al.
      Assigned to: Judith Albert
      Status: motions

    Montana Consumer Counsel v. FERC, No. 08-71827 (9th Cir. filed 5/1/2008)
      Rulemaking codifying and, in certain respects, modifying FERC standards for obtaining and retaining market-based rates for public utilities, at 18 CFR, Part 35, Subpart H. Market-Based Rates for Wholesale Sales of Electric Energy by Public Utilities, Order 697, 119 FERC ¶ 61,295 PDF (2007), order on reh'g and clar., 123 FERC ¶ 61,055 PDF (2008).
      FERC Docket No. RM04-7
      Assigned to: Carol Banta
      Status: in abeyance

    Montana Consumer Counsel, et al. v. FERC, Nos. 07-73256, et al. (9th Cir. filed 8/16/2007 and later)

      Finding that PPL Companies had rebutted the presumption of market power in the control area operated by NorthWestern Corp. and had satisfied the standards for the grant of market-based rate authority. PPL Montana, LLC, et al., 115 FERC ¶ 61,204 PDF (2006), reh'g denied, 120 FERC ¶ 61,096 PDF (2007).
      FERC Docket No. ER99-3491, et al.
      Assigned to: Carol Banta
      Status: oral argument 10/22/2008

    Morgan Stanley Capital Group, Inc., et al. v. FERC, Nos. 06-71502, et al. (9th Cir. filed 3/23/2006)

      Order on cost filings concerning calculation of refunds in California Refund Proceeding. San Diego Gas & Electric Co., et al., 114 FERC ¶ 61,070 PDF (2006),(rehearing pending), and earlier orders.
      FERC Docket No. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: motions

    Morgan Stanley Capital Group, Inc., et al. v. Public Utility District No. 1 of Snohomish County, Washington, et al., Nos. 06-1457, et al. (S.Ct. filed May 3, 2007)

      Application of Mobile-Sierra doctrine to long-term contracts for the wholesale sale of electricity at market-based rates. On petition for cert.; Public Utility Dist. No. 1 v. FERC, 471 F.3d 1053 (9th Cir. 2006), remanding Nevada Power Co., 103 FERC ¶ 61,353 PDF, order on reh’g, 105 FERC ¶ 61,185 PDF (2003)
      FERC Docket No. EL02-28, et al.
      Assigned to: Lona Perry
      Status: S.Ct. decision issued 6/28/2008

    N   Top of Page

    National Rural Electric Cooperative Ass'n, et al. v. FERC, No. 08-1278 (D.C. Cir. filed 8/22/2008)

      Order No. 890 rulemaking, revising pro forma open-access transmission tariff adopted in Order No. 888 to ensure that transmission services are provided on a basis that is just and reasonable, and not unduly discriminatory. Preventing Undue Discrimination and Preference in Transmission Service, Order 890, 118 FERC ¶ 61,119 PDF (2007), order on reh'g & clar., Order 890-A, 121 FERC ¶ 61,297 PDF (2007), order on reh'g & clar., Order 890-B, FERC Stats. & Regs. ¶ 61,299 PDF (June 23, 2008).
      FERC Docket No. RM05-17, et al.
      Assigned to: Jennifer Amerkhail
      Status: in abeyance pending FERC action

    Navajo Refining Co., L.P., et al. v. FERC and United States of America, Nos. 06-1116, et al. (D.C. Cir. filed 3/30/2006 and later)

      Order on ALJ's initial decision and on certain remanded issues, concerning rates for SFPP's East and West Lines. SFPP, L.P., et al., 113 FERC ¶ 61,277 PDF (2005), order on reh'g, 114 FERC ¶ 61,136 PDF (2006). [related to earlier appeals]
      FERC Docket No. OR92-8, et al.
      Assigned to: Lona Perry
      Status: consent motion to hold in abeyance granted 7/31/2006

    North Star Steel Co., LLC v. FERC, No. 07-73550 (9th Cir. filed 9/5/2007)

      Denial of complaint, finding that FERC lacks jurisdiction over request for refunds to a retail customer of Arizona Electric Power Cooperative during 2000-2001 energy crisis. North Star Steel Co. v. Arizona Public Service Co., et al., 116 FERC ¶ 61,022 PDF (2006), reh'g denied, 120 FERC ¶ 61,146 PDF (2007).
      FERC Docket No. EL06-68
      Assigned to: Carol Banta
      Status: oral argument 3/11/2009


    Norwalk Power LLC v. FERC No. 08-1184 (D.C. Cir. filed 5/9/2008)

      Conditional acceptance and suspension, subject to settlement and hearing procedures, of Reliability Must Run Agreement between Norwalk and ISO New England. Norwalk Power LLC, 120 FERC ¶ 61,048 PDF (2007), reh'g denied, 122 FERC ¶ 61,273 PDF (2008).
      FERC Docket No. ER07-799, et al.
      Assigned to: Samuel Soopper
      Status: in abeyance pending settlement discussions

    O   Top of Page

    OptiSolar, Inc. v. FERC, No. 08-1367 (D.C. Cir. filed 11/24/2008)

      Waiver of certain provisions of ISO tariff governing large generator interconnection procedures and studies; claim by OptiSolar that FERC/ISO unjustly allowed a competing generation project to jump ahead in the interconnection queue and claim scarce transmission capacity. California Independent System Operator Corp., 124 FERC ¶ 61,031 PDF (2008), reh'g denied, 125 FERC ¶ 61,293 PDF (2008).
      FERC Docket No. ER08-960
      Assigned to: Lona Perry
      Status: motions


    Otter Tail Corp., et al. v. FERC Nos. 08-1002, et al. (D.C. Cir. filed 1/4/2008)

      Order on proposed revisions to Midwest ISO Tariff (TEMT) to amend and clarify provisions of its real-time revenue sufficiency guarantee. Midwest Independent Transmission System Operator, Inc., 115 FERC ¶ 61,108 PDF (2006), order on reh'g, 117 FERC ¶ 61,113 PDF (2006), order on reh'g, 118 FERC ¶ 61,212 PDF (2007), order on reh'g, 121 FERC ¶ 61,131 PDF (2007).
      FERC Docket No. ER04-691
      Assigned to: Judith Albert
      Status: in abeyance; consolidated with D.C. Cir. No. 06-1423

    P   Top of Page

    Pacific Gas and Electric Co., et al. v. FERC, Nos. 06-71888, et al. (9th Cir. filed 4/6/2006 and later)

      Order denying rehearing and granting clarification on treatment of emissions costs of LADWP during 10/2/00-6/20/01 refund period. San Diego Gas & Electric Co., et al., 112 FERC ¶ 61,323 PDF (2005), rorder on reh'g, 114 FERC ¶ 61,313 PDF (2006).
      FERC Docket No. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: in abeyance

    Pacific Gas and Electric Co. v. FERC, No. 06-71320 (9th Cir. filed 3/14/2006)

      Order on submission of fuel cost allowance claims. San Diego Gas & Electric Co., et al., 114 FERC ¶ 61,223 PDF (2006), and earlier fuel cost allowance cases.
      Docket No. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: motions

    Pacific Gas and Electric Co., et al. v. FERC, Nos. 05-71831, et al. (9th Cir. filed 4/1/2005 and later)

      Order on rehearing of refund calculation issues. San Diego Gas & Electric Co., et al., 109 FERC ¶ 61,218 PDF (2004), order on reh’g, 110 FERC ¶ 61,336 PDF (2005).
      FERC Docket Nos. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: in abeyance

    Pacific Gas and Electric Co., et al. v. FERC, Nos. 05-71761, et al. (9th Cir. filed 3/29/2005 and later)

      Order on rehearing on submission of fuel cost allowance claims. San Diego Gas & Electric Co., et al., 109 FERC ¶ 61,297 PDF (2004), order on reh’g, 110 FERC ¶ 61,293 PDF (2005).
      FERC Docket Nos. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: in abeyance

    Pacific Gas and Electric Co., et al. v. FERC, Nos. 05-71436, et al. (9th Cir. filed 3/14/2005 and later)


      Termination of investigations into anomalous bidding behavior by suppliers into Western energy markets. Investigation of Anomalous Bidding Behavior and Practices in the Western Markets, 110 FERC ¶ 61,369 PDF (2005), dismissing rehearing of termination letters, dated May 12, 2004, sent by Director of OMOI to 30 suppliers.
      FERC Docket Nos. IN03-10, et al.
      Assigned to: Robert Solomon
      Status: in abeyance

    Pacific Gas and Electric Company, et al. v. FERC, Nos. 04-75609, et al. (9th Cir. filed 11/4/2004)


      Review of fuel cost allowance claims by independent auditors. San Diego Gas & Electric Co., et al., 108 FERC ¶ 61,219 PDF (2004), order on reh’g, 109 FERC ¶ 61,074 PDF (2004).
      FERC Docket Nos. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: briefing stayed

    Pacific Gas and Electric Co., et al. v. FERC, Nos. 04-74984, et al. (9th Cir. filed 9/29/2004 and later)

      Clarification of fuel cost allowance issues in calculation of MMCP refund methodology. San Diego Gas & Electric Co., et al., 107 FERC ¶ 61,166 PDF (2004), reh'g denied, 108 FERC ¶ 61,311 PDF (2004).
      FERC Docket Nos. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: briefing stayed

    Pacific Gas and Electric Co., et al. v. FERC, Nos. 04-72539, et al. (9th Cir. filed 5/21/2004 and later)

      Order clarifying methodology for calculating fuel cost allowances and requiring verification by an independent auditor. San Diego Gas & Electric Co., et al., 107 102 FERC ¶ 61,317 PDF (2003) order on clarification, 103 FERC ¶ 61,078 PDF (2003), order on reh’g, 107 FERC ¶ 61,166 TXT (May 12, 2004).
      FERC Docket Nos. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: briefing stayed

    Pacific Gas and Electric Co., et al. v. FERC, Nos. 04-71019, et al. (9th Cir. filed March 4, 2004)

      Order granting interlocutory appeal and clarifying scope of discovery in partnership gaming show cause proceeding. Enron Power Marketing, Inc., et al., 105 FERC ¶ 61,362 PDF (2003), reh’g denied, 106 FERC ¶ 61,182 PDF (2004).
      FERC Docket Nos. EL03-180, et al.
      Attorney: Robert Solomon
      Status: briefing stayed

    Pacific Gas and Electric Co., et al. v. FERC, Nos. 04-72381, et al. (9th Cir. filed 5/12/2004)

      Public release of most, but not all, documents relating to investigation of possible manipulation of energy prices in the West during 2000-2001. Fact-Finding Investigation of Potential Manipulation of Electric and Natural Gas Prices, 107 FERC ¶ 61,108 PDF (2004) [and earlier orders].
      FERC Docket Nos. PA02-2, et al.
      Assigned to: Robert Solomon
      Status: appeals stayed 8/26/2004

    Pacific Gas and Electric Co., et al. v. FERC, Nos. 05-71008, et al. (9th Cir.)

      Initiation of evidentiary show cause proceedings as to whether power trading companies engaged in gaming and/or anomalous market behavior, in violation of applicable tariffs, in western energy markets in 2000-2001. American Electric Power Service Corp., et al., 103 FERC ¶ 61,345 PDF (2003), and Enron Power Marketing, Inc., et al., 103 FERC ¶ 61,346 PDF (2003), reh’g denied, 106 FERC ¶ 61,020 PDF (2004).
      FERC Docket Nos. EL03-137, et al.
      Assigned to: Robert Solomon
      Status: appeals consolidated and briefing stayed 4/5/2005

    Pacific Gas and Electric Co., et al. v. FERC, Nos. 03-72874, et al. (9th Cir., filed Aug. 7, 2003 and later).

      Approval of Settlement Agreements with Reliant and Duke; denial of late intervention and party status to California Parties and other movants. Fact Finding Investigation into Possible Manipulation of Electric and Natural Gas Prices, 102 ¶ FERC 61,108 PDF (2003), interventions denied, 103 ¶ FERC 61,019 PDF (2003), reh'g dismissed, 104 ¶ FERC 61,146 PDF (2003); Reliant Energy Services, Inc., et al., 105 FERC ¶ 61,008 PDF (2003), reh'g dismissed, 105 FERC ¶ 61,253 PDF (2003).
      FERC Docket Nos. PA02-2, EL03-59, et al.
      Assigned to: Robert Solomon
      Status: briefing; oral argument 12/8/2004; Duke appeals withdrawn

    People of the State of California, et al. v. FERC, No. 08-74306 (9th Cir. filed 10/14/2008)

      Order on remand from State of California ex rel. Lockyer v. FERC, 383 F.3d 1006 (9th Cir. 2004), setting for hearing violations of market-based rate quarterly reporting requirements during 2000-2001 and whether improper or untimely quarterly reporting masked an accumulation of market power, thus causing market-based rates to be unjust and unreasonable. State of California, ex rel. Bill Lockyer, Attorney General v. British Columbia Power Exchange Corp., et al., 122 FERC ¶ 61,260 PDF (2008), order on reh'g & clar., 125 FERC ¶ 61,016 PDF (2008).
      FERC Docket No. EL02-71
      Assigned to: Robert Solomon
      Status: in abeyance

    People of the State of California ex rel. Bill Lockyer, Attorney General, et al. v. FERC, Nos. 05-75487 (9th Cir. filed 9/16/2005 and later)

      Clarification of scope of proceeding as to Enron's market behavior in violation of tariffs. El Paso Electric Co., et al., 111 FERC ¶ 61,221 PDF (2005), reh'g denied, 112 FERC ¶ 61,256 PDF (2005).
      FERC Docket Nos. EL02-113, et al.
      Assigned to: Patrick Lee; Robert Solomon
      Status: in abeyance

    People of the State of California ex rel. Bill Lockyer, et al. v. FERC, Nos. 04-76229, et al. (9th Cir. filed 12/12/2004 and later)

      Order on rehearing of refund calculation issues. San Diego Gas & Electric Co., et al., 107 FERC ¶ 61,165 PDF (2004), order on reh’g, 109 FERC ¶ 61,218 PDF (2004).
      FERC Docket Nos. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: in abeyance

    People of the State of California, ex rel. Bill Lockyer, Attorney General, et al. v. FERC, Nos. 04-75295, et al. (9th Cir. filed 10/18/04 and later)

      Denial of California Parties’ request for consolidation of refund and investigative proceedings. San Diego Gas & Electric Co., et al., 103 FERC ¶ 61,359 PDF (2003), reh’g denied, 109 FERC ¶ 61,024 PDF (2004).
      FERC Docket Nos. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: transferred to D.C. Circuit 4/13/2005

    People of the State of New York, et al. v. FERC, Nos. 08-1366, et al. (D.C. Cir. filed 11/21/2008 and later)

      Conditional approval of NY ISO proposals to strengthen market mitigation in New York City (in-city) installed capacity market. New York Independent System Operator, Inc., 122 FERC ¶ 61,211 PDF (2008), order on reh'g & compl., 124 FERC ¶ 61,301 PDF (2008).
      FERC Docket No. EL07-39, et al.
      Assigned to: Jennifer Amerkhail
      Status: in abeyance

    Petro Star, et al. v. FERC and United States of America, No. 07-1034 (D.C. Cir. filed 2/8/2007)

      Acceptance of tariff sheets filed to comply with Opinion No. 481 series of orders (concerning TAPS "Quality Bank"). BP Pipelines (Alaska) Inc., et al., 116 FERC ¶ 61,208 PDF (2006), reh'g denied, 118 FERC ¶ 61,056 PDF (2007).
      FERC Docket No. IS06-466, et al.
      Assigned to: Beth Pacella
      Status: consolidated with D.C. Cir. No. 06-1361; motion for voluntary remand granted 1/14/2008

    Petro Star Inc. v. FERC and United States of America, No. 08-1192 (D.C. Cir. filed 5/15/2008)

      Order affirming ALJ initial decision on valuation (specifically, processing cost adjustment) of West Coast Heavy Distillate cut of Trans Alaska Pipeline System crude oil; compliance with Opinion No. 481. BP Pipelines (Alaska) Inc., et al., 122 FERC ¶ 61,236 PDF (2008).
      FERC Docket No. OR06-10
      Assigned to: Beth Pacella
      Status: in abeyance

    Piedmont Environmental Council, et al. v. FERC, Nos. 07-1651, et al. (4th Cir. filed 7/10/2007 and later)
      Regulations implementing section 1221 of Energy Policy Act, adding new FPA section 216, providing for federal siting of electric transmission facilities when state has “withheld approval for more than 1 year”. Regulations for Filing Applications for Permits to Site Interstate Electric Transmission Facilities, Order No. 689, 117 FERC ¶ 61,202 PDF (2006), 71 Fed. Reg. 69,440, reh’g denied, 119 FERC ¶ 61,154 PDF (2007).
      FERC Docket No. RM06-12
      Assigned to: Lona Perry
      Status: reversed in part and affirmed in part 2/18/2009

    PNGTS Shippers’ Group, et al. v. FERC, No. 09-1029 (D.C. Cir. filed 1/16/2009

      Declaratory order that certificated capacity of PNGTS system is 168,000 Mcf per day, once expansion facilities placed in service; rate issues reserved for next PNGTS rate proceeding. Portland Natural Gas Transmission System, 123 FERC ¶ 61,275 PDF (2008), reh'g denied, 125 FERC ¶ 61,198 PDF (2008).
      FERC Docket No. CP08-70
      Assigned to: Kathrine Henry
      Status: briefing


    Port of Seattle, Washington, et al. v. FERC, Nos. 06-75708, et al. (9th Cir. filed 12/18/2006 and later)

      Approval of contested settlements between Enron, FERC Staff, Valley Electric Ass'n, and City of Santa Clara, California. Enron Power Marketing, Inc., et al., 115 FERC 61,376 PDF (2006), reh'g denied, 117 FERC 61,257 PDF (2006).
      FERC Docket Nos. EL03-180, et al.
      Assigned to: Robert Solomon
      Status: motions

    Port of Seattle v. FERC, No. 06-74383 (9th Cir. filed 8/31/2006)

      Approval of contested settlements between Enron, FERC Staff, Valley Electric Ass'n, and City of Santa Clara, California. Enron Power Marketing, Inc., et al., 115 FERC ¶ 61,376 PDF (2006).
      FERC Docket No. EL03-180, et al.
      Assigned to: Robert Solomon
      Status: motions

    Port of Seattle, Washington v. FERC, No. 06-72957 (9th Cir. filed 6/7/2006)

      Approval of global settlement of disputes between Reliant, California Parties and FERC Staff. San Diego Gas & Electric Co. v. Sellers of Energy and Ancillary Services, et al., 113 FERC ¶ 61,308 PDF (2005), reh'g denied, 115 FERC ¶ 61,271 PDF (2006).
      FERC Docket No. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: in abeyance

    Port of Seattle, Washington v. FERC, Nos. 06-75039, et al. (9th Cir. filed 10/25/2006 and later)

      Approval of contested settlement of disputes between energy suppliers and FERC Staff.  Mirant Energy Marketing, L.P., et al.,111 FERC 61,488 PDF (2005), reh'g denied,117 FERC ¶ 61,040 PDF (2006), and related settlement approval orders.
      FERC Docket No. EL03-158, et al.
      Assigned to: Robert Solomon
      Status: in abeyance

    Port of Seattle, Washington v. FERC, No. 06-72649 (9th Cir. filed 5/23/2006)

      Approval of contested settlement between Enron, California Parties and FERC Staff. San Diego Gas & Electric Co. v. Sellers of Energy and Ancillary Services, et al., 113 FERC ¶ 61,171 PDF (2005), reh'g denied, 115 FERC ¶ 61,032 PDF (2006).
      FERC Docket No. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: in abeyance

    Potter Township Hydroelectric Auth. v. FERC, No. 00-1333 (D.C. Cir., filed Jul. 27, 2000).

      Petitioner challenges Commission orders denying its request for an extension of time to commence construction of the Emsworth Lock and Dam Hydroelectric Project, in order to avoid termination of is license. Potter Township Hydroelectric Auth., 90 FERC ¶ 61,312 [TIF] (2000), reh'g denied by operation of law, 91 FERC ¶ 61,190 [TIF] (2000).
      FERC Docket No. P-7041
      Assigned to: Lona Perry
      Status: in abeyance

    Powerex Corp. v. FERC, No. 05-1094 (D.C. Cir. filed 3/24/2005)

      Use of chargebacks by the California PX in response to alleged defaults by PG&E and Edison in early 2001; decision to allow PX to retain chargeback funds until the completion of the California Refund Proceeding. Coral Power, L.L.C., et al., 109 FERC ¶ 61,027 PDF (2004), order on reh'g, 110 FERC ¶ 61,288 PDF (2005).
      FERC Docket No. EL01-36
      Assigned to: Lona Perry
      Status: record filed 5/19/2005; consolidated with 02-1367, et al.

    Public Service Elec. & Gas Co., et al. v. FERC, Nos. 07-1336, et al. (D.C. Cir. filed 8/23/2007 and later)

      Approval, with modifications, of settlement between PJM and PJM market participants concerning Reliability Pricing Model to manage resource adequacy and ensure reliable energy supplies within PJM. PJM Interconn., L.L.C., 115 FERC ¶ 61,079 PDF (2006), order on reh'g, 117 FERC ¶ 61,331 PDF (2006), order on reh'g, 119 FERC ¶ 61,318 PDF (2007), reh'g denied, 121 FERC ¶ 61,173 PDF (2007).
      FERC Docket No. ER05-1410, et al.
      Assigned to: Samuel Soopper, Jennifer Amerkhail
      Status: oral argument 3/6/2009

    Public Service Elec. and Gas Co., et al. v. FERC, Nos. 07-1210, et al. (D.C. Cir. filed 6/18/2007 and later)

      Complaint proceeding concerning two 1970s-era contracts providing for PSE&G to receive up to 1000 MW of power from ConEd in upstate New York and to redeliver same amount of power to ConEd in New York City; protocols governing each party's responsibilities in performing contractual wheeling. Consolidated Edison Co. of New York v. Public Service Electric and Gas Co., Op. 476, 108 FERC ¶ 61,120 PDF (2004), order on reh'g and inform. reports, 119 FERC ¶ 61,070 PDF and 61,071 PDF (2007), reh'g denied, 120 FERC ¶ 61,161 PDF (2007).
      FERC Docket No. EL02-23
      Assigned to: Lona Perry
      Status: in abeyance

    Public Utilities Comm'n of California v. FERC, No. 08-1261 (D.C. Cir. filed 8/8/2008)

      Declaratory order approving incentive rate treatments for certain transmission projects, consistent with Order 679. Southern California Edison Co., 121 FERC ¶ 61,168 121 FERC ¶ 61,168 PDF (2007), reh'g denied, 123 FERC ¶ 61,293 PDF (2008).
      FERC Docket No. EL07-62
      Assigned to: Samuel Soopper
      Status: in abeyance

    Public Utilities Commission of California, et al. v. FERC, Nos. 03-74207, et al. (9th Cir. filed November 17, 2003 and later)

      Denial of complaints seeking modification of long-term contracts, executed in early 2001 at height of California energy crisis between the California Department of Water Resources and five wholesale energy suppliers. Public Utilities Commission of the State of California v. Sellers of Long Term Contracts to the California Department of Water Resources, et al., 103 FERC ¶ 61,354 PDF (2003), order on reh'g, 105 FERC ¶ 61,182, PDF (2003) [and earlier orders].
      FERC Docket Nos. EL02-60, et al.
      Assigned to: Lona Perry
      Status: briefing; oral argument 12/8/2004

    Public Utilities Commission of the State of California, et al. v. FERC, Nos. 01-71051, et al. (9th Cir., filed June 29, 2001 and later)

      Numerous petitioners challenge various aspects of the Commission's market mitigation and monitoring plan for the California and Western wholesale electricity markets. San Diego Gas & Elec. Co., et al., 93 FERC ¶ 61,294 [TIF] (2000); 95 FERC ¶ 61,115 PDF (2001); 95 FERC ¶ 61,418 [TIF] (2001); 96 FERC ¶ 61,120 [TIF] (2001); 97 FERC ¶ 61,275 PDF (2001); 99 FERC ¶ 61,160 PDF (2002).
      FERC Docket Nos. EL00-95, et al.
      Assigned to: Dennis Lane, Robert Solomon, Beth Pacella
      Status: Case management conferences 9/21/2004 and 11/9/2004; briefing on Phase One “scope” issues; oral argument 4/12-13/2005

    Public Utility District No. 1 of Pend Oreille County, Washington, et al. v. FERC, Nos. 06-1387, et al. (D.C. Cir. filed 11/21/2006)

      Issuance of new license for continued operation of the Box Canyon Hydroelectric Project, located on the Pend Oreille River in Northeast Washington and Northwest Idaho; reasonableness of certain mandatory conditions submitted by the Department of Interior. Public Utility Dist. No. 1 of Pend Oreille County, Washington, 112 FERC ¶61,055 Word Document, Appendix A (2005), order on reh'g, 117 FERC ¶ 61,205 PDF (2006).
      FERC Docket No. P-2042
      Assigned to: Holly Cafer
      Status: stay pending appeal granted 1/16/2007; motion to hold in abeyance pending mediation granted 7/26/2007

    Q   Top of Page

    R   Top of Page

    Resolute Natural Resources Co. and Resolute Aneth, LLC v. FERC, No. 08-1268 (D.C. Cir. filed 8/15/2008)

      Acceptance of Western's tariffs establishing rates and rules governing interstate movement of crude petroleum from points in New Mexico and Texas to certain points in New Mexico, effective 3/10/08. Western Refining Pipeline Co., 122 FERC ¶ 61,210 PDF (2008), reh'g denied, 123 FERC ¶ 61,271 PDF (2008).
      FERC Docket No. IS08-131
      Assigned to: Robert Kennedy
      Status: briefing suspended

    Richard Blumenthal, Attorney General for the State of Connecticut v. FERC, No. 07-1501 (D.C. Cir. filed 12/7/2007)

      Approval in part, and rejection in part, of settlements concerning ratemaking treatment of Reliability Must Run generating units. Milford Power Co., 110 FERC ¶ 61,299 PDF (2005), order on reh'g and clar., 112 FERC ¶ 61,154 PDF (2005), order on sett., 119 FERC ¶ 61,167 PDF (2007), reh'g denied, 121 FERC ¶ 61,042 PDF (2007).
      FERC Docket No. ER05-163
      Assigned to: Jennifer Amerkhail
      Status: in abeyance; related to D.C. Cir. No. 07-1130

    Richard Blumenthal, Attorney General for the State of Connecticut v. FERC, No. 07-1130 (D.C. Cir. filed 5/9/2007)

      Denial of complaint seeking to require all electric generation facilities in Connecticut to be compensated on a cost-of-service basis through RMR agreements. Richard Blumenthal, Attorney General of Conn., et al. v. ISO New England, 117 FERC ¶ 61,038 PDF (2006), reh'g denied, 118 FERC ¶ 61,205 PDF (2007).
      FERC Docket No. EL05-150
      Assigned to: Jennifer Amerkhail
      Status: petition denied 1/23/2009

    S   Top of Page

    Sacramento Municipal Utility District, et al. v. FERC, Nos. 08-1298, et al. (D.C. Cir. filed 9/12/2008 and later)
      California ISO market redesign; implementation of short-term congestion revenue rights and long-term firm transmission rights. California ISO Corp., 120 FERC ¶ 61,023 PDF (2007), reh'g & clar. denied, 124 FERC ¶ 61,094 PDF (2008).
      FERC Docket No. ER06-615, et al.
      Assigned to: Beth Pacella
      Status: consolidated with D.C. Cir. No. 07-1208, et al.; briefing

    Sacramento Municipal Utility District, et al. v. FERC, Nos. 07-1208, et al. (D.C. Cir. filed 6/15/2007 and later)

      Tariff filing by California ISO to implement Market Redesign and Technology Upgrade (MRTU) proposal, to: ensure sufficient resources; fix flawed market rules; increase price transparency; improve transmission congestion management; and enhance market power mitigation. California Independent System Operator Corp., 116 FERC ¶ 61,274 PDF (2006), order on reh’g and clarification, 119 FERC ¶ 61,076 PDF (2007).
      FERC Docket No. ER06-615, et al.
      Assigned to: Beth Pacella
      Status: briefing

    Sempra Generation v. FERC, No. 08-1351 (D.C. Cir. filed 11/3/2008)

      Declaratory order that the Commission does not have exclusive jurisdiction, and will not exercise concurrent jurisdiction, to decide contract dispute pending in arbitration. California Dept. of Water Resources, 121 FERC ¶ 61,191 PDF (2007), reh'g denied, 124 FERC ¶ 61,216 PDF (2008).
      FERC Docket No. EL07-103 et al.
      Assigned to: Robert Kennedy
      Status: voluntarily dismissed 3/31/2009


    SFPP, L.P., et al. v. FERC and United States of America, Nos. 02-1112, et al. (D.C. Cir., filed Apr. 8, 2002 and later).


    SFPP, L.P. v. FERC and United States of America No. 08-1110 (D.C. Cir. filed 3/10/2008)

      Order on ALJ's initial decision on 2 issues reserved by settlement, concerning reparations to shippers. SFPP, L.P., 122 FERC ¶ 61,126 PDF (2008).
      FERC Docket No. OR92-8
      Assigned to: Jennifer Amerkhail
      Status: briefing

    South Coast Air Quality Management District v. FERC, No. 08-72265 (9th Cir. filed 5/29/2008)

      Authorization to allow North Baja to construct facilities to increase pipeline capacity and to allow for importation from Mexico of regasified liquefied natural gas; impact on air quality of consumption of regasified LNG. North Baja Pipeline, LLC, 121 FERC ¶ 61,010 PDF (2007), order denying reh'g and stay, 123 FERC ¶ 61,073 PDF (2008).
      FERC Docket No. CP06-61, et al.
      Assigned to: Holly Cafer
      Status: briefing

    Southern California Edison Co. v. FERC, No. 08-1384 (D.C. Cir. filed 12/12/2008)

      Order on self-supply by merchant generators of station power requirements, and appropriate netting period, under California ISO station power protocol. California Independent System Operator Corp., 111 FERC ¶ 61,452 PDF (2005), order on reh'g, compl. & clar., 125 FERC ¶ 61,072 PDF (2008).
      FERC Docket No. ER05-849
      Assigned to: Robert Kennedy
      Status: related to D.C. Cir. 05-1327; in abeyance


    Southern California Edison Co., et al. v. FERC, Nos. 05-1327, et al. (D.C. Cir. filed 8/17/2005)

      Order granting, in part, complaint and directing California ISO to revise its open access transmission tariff to conform to FERC station power policies. Duke Energy Moss Landing v. California ISO, 109 FERC ¶ 61,170 PDF (2004), reh'g denied, 111 FERC ¶ 61,451 PDF (2005).
      FERC Docket No. EL04-130
      Assigned to: Robert Kennedy
      Status: in abeyance


    State of Oregon v. FERC, No. 09-70269 (9th Cir. filed 1/27/2009)

      Authorization to Bradwood Landing to site, construct and operate a liquefied natural gas terminal on the Columbia River in Clatsop County, Oregon, and to construct, own and operate approximately 36.3 miles of pipeline from the LNG terminal to an interconnection with Northwest Pipeline Corp. in Cowlitz County, Washington. Bradwood Landing LLC and NorthernStar Energy LLC, 124 FERC ¶ 61,257 PDF (2008), reh’g denied 126 FERC ¶ 61,035 PDF (2009).
      FERC Docket No. CP06-365, et al.
      Assigned to: Robert Kennedy
      Status: in abeyance


    State of Washington Dept. of Ecology v. FERC No. 08-1191 (D.C. Cir. filed 5/15/2008)

      Conditional license for 1 MW Makah Bay Offshore Wave Pilot Project; issuance of license prior to obtaining necessary state CZMA consistency concurrence and CWA certification. Finavera Renewables Ocean Energy, Ltd., 121 FERC ¶ 61,288 PDF (2007), order on reh'g, 122 FERC ¶ 61,248 PDF (2008).
      FERC Docket No. P-12751
      Assigned to: Holly Cafer
      Status: motions

    St. Regis Mohawk Tribe, et al. v. FERC, No. 04-4231 (2nd Cir. filed 8/13/2004)

      New license for NYPA's continued operation of the St. Lawrence-FDR Project; allocation of project power to neighboring states. New York Power Authority, et al., 105 FERC ¶ 61,102 PDF (2003), order on reh'g, 107 FERC ¶ 61,259 PDF (2004).
      FERC Docket Nos. P-2000 and EL03-224
      Assigned to: Robert Solomon
      Status: in abeyance

    T   Top of Page

    Tesoro Refining and Marketing Co. v. FERC, and United States of America No. 07-1461 (D.C. Cir. filed 11/13/2007)

      Dismissal of complaint challenging index-based rate increases for Calnev for 2005-2007. Tesoro Refining and Marketing Co. v. Calnev Pipe Line, L.L.C., 121 FERC ¶ 61,142 PDF (2007).
      FERC Docket No. OR07-16
      Assigned to: Carol Banta
      Status: petition dismissed 1/23/2009

    Town of Buckeye, Arizona, et al. v. FERC Nos. 08-1126, et al. (D.C. Cir. filed 3/24/2008)

      Certification of Phoenix Expansion Project, authorizing expansion of Transwestern to serve suburbs of Phoenix, Arizona. Transwestern Pipeline Co., et al., 121 FERC ¶ 61,175 PDF (2007), reh'g & stay denied, 122 FERC ¶ 61,165 PDF (2008).
      FERC Docket No. CP06-459, et al.
      Assigned to: Jennifer Amerkhail
      Status: motions

    U   Top of Page

    Union Power Partners, L.P. v. FERC, No. 08-1252 (D.C. Cir. filed 7/18/2008)

      Affirmance of ALJ that Union does not have a contractual right under its interconnection agreement with Entergy to compensation for reactive power. Union Power Partners, L.P., 120 FERC ¶ 61,284PDF (2007), reh'g denied, 123 FERC ¶ 61,191 PDF (2008).
      FERC Docket No. ER05-977
      Assigned to: Robert Kennedy
      Status: briefing


    V   Top of Page

    W   Top of Page

    Washington Gas Light Co. v. FERC, No. 09-1100 (D.C. Cir. filed 3/13/2009)
      Order on remand from Washington Gas Light Co. v. FERC, 532 F.3d 928 (D.C. Cir. 2008), reauthorizing expansion of Cove Point LNG’s existing LNG import terminal and construction of Dominion’s new downstream pipeline and storage facilities; effect on gas leaks on WGL’s system. Dominion Cove Point LNG, LP, et al., 125 FERC ¶ 61,018 PDF (2008), order on reh’g and clar., 126 FERC ¶ 61,036 PDF (2009).
      FERC Docket No. CP05-130, et al.
      Assigned to: Judith Albert
      Status: motions


    Washington Gas Light Co. v. FERC, No. 08-1157 (D.C. Cir. filed 4/18/2008)
      Order on technical conference, concerning natural gas quality standards on Columbia's pipeline system. Norstar Operating, LLC v. Columbia Gas Transmission Corp., et al., 118 FERC ¶ 61,221 PDF (2007), order on reh'g & compl., 122 FERC ¶ 61,163 PDF (2008).
      FERC Docket No. RP06-231, et al.
      Assigned to: Judith Albert
      Status: in abeyance

    Westar Energy, Inc., et al. v. FERC, No. 08-1196, et al. (D.C. Cir. filed 5/19/2008 and later)


    Williams Alaska Petroleum, Inc., et al. v. FERC, No. 09-1078, et al. (D. C. Cir. filed 2/26/2009 and later)

      Order concerning the Trans Alaska Pipeline System (TAPS) Carriers’ 2007 and 2008 interstate rate filings; directing compliance filing conforming with ratemaking principles established for TAPS in Opinion No. 502 for 2005 and 2006. BP Pipelines (Alaska) Inc., et al., 125 FERC ¶ 61,367 PDF (2008).
      FERC Docket No. IS07-75, et al.
      Assigned to: Beth Pacella
      Status: motions

    Williams Alaska Petroleum Inc. v. FERC, and United States of America No. 07-1421 (D.C. Cir. filed 10/18/2007)

      Motion for ruling on retroactive calculations concerning TAPS Quality Bank. Trans Alaska Pipeline System, 119 FERC ¶ 61,254 PDF (2007), reh'g denied, 120 FERC ¶ 61,279 PDF (2007)
      FERC Docket No. OR89-2
      Assigned to: Beth Pacella
      Status: in abeyance

    X   Top of Page

    Y   Top of Page

    Z   Top of Page



  Related Topics

 



Updated: May 1, 2009