MISSION: STS-99  -- Shuttle Radar Topography Mission (SRTM)

VEHICLE Endeavour/OV-105
LOCATION Pad 39A
TARGET KSC LAUNCH DATE/TIME No earlier than Jan. 31, 2000 at 12:47 p.m. EST
TARGET KSC LANDING DATE/TIME Feb. 11, 2000 at 4:52 p.m. EST
LAUNCH WINDOW 2 hours and 2 minutes
MISSION DURATION 11 days and 4 hours
CREW Kregel, Gorie, Kavandi, Voss, Mohri, Thiele
ORBITAL ALTITUDE and INCLINATION 126 nautical miles/57 degrees
Work in progress
At Launch Pad 39A, preparations for Endeavour's upcoming launch continue on schedule. Orbiter aft compartment close-outs are going well and the aft doors are slated for installation on Wednesday. Shuttle ordnance installation begins today and flight crew equipment stowage continues through next week.

Engineering evaluation of Endeavour's thermal tiles continues. The analysis will determine if any additional tile work is required on Endeavour prior to launch, and if so, what schedule impacts may exist. To date, only two tiles have been removed from the orbiter's nose and will be replaced in parallel with standard work.

Engineers are also considering a strengthening modification for four camera mounts located in the orbiter's payload bay. If the modifications are needed, the payload bay doors must be opened to allow work on the forward and aft bulkhead cameras early next week, with no impact to the current schedule.

Processing Milestones
Ordnance installation complete Jan. 24
Orbiter aft comparment close-outs Jan. 26
Flight crew equipment stowage complete Jan. 26
Flight crew arrives at KSC Jan. 27 at noon
Launch Countdown begins Jan. 28 at 5:30 p.m.
 

MISSION: STS-101 -- 3rd ISS Flight (2A.2) - SPACEHAB DM

VEHICLE Atlantis/OV-104
LOCATION Orbiter Processing Facility bay 3
TARGET KSC LAUNCH DATE/TIME No earlier than April 13, 2000 at about 9:30 p.m.
TARGET KSC LANDING DATE/TIME April 24, 2000
LAUNCH WINDOW about 10 minutes
MISSION DURATION 10 days and 19 hours
CREW Halsell, Horowitz, Weber, Lu, Williams, Malenchenko and Morukov
ORBITAL ALTITUDE and INCLINATION 173 nautical miles/51.6 degrees
Work in progress
Orbiter maneuvering system functional tests were completed earlier this week. Servicing of Atlantis' freon coolant loop No. 2 concluded Wednesday. Wiring inspections and repairs continue in the orbiter's aft and midbody compartments. Checks on the Ku-band antenna and TACAN system are also under way.

MISSION: STS-92 -- 4th ISS Flight (3A) - Z-1 Truss, PMA-3
VEHICLE Discovery/OV-103
LOCATION OPF bay 1
TARGET KSC LAUNCH DATE/TIME No earlier than June 14, 2000 at 8:42 p.m. EDT
TARGET KSC LANDING DATE/TIME June 24, 2000 at 5:10 p.m. EDT
LAUNCH WINDOW 10 minutes
MISSION DURATION 10 days
CREW Duffy, Melroy, Wakata, Chiao, Wisoff, Lopez-Alegria and McArthur
ORBITAL ALTITUDE and INCLINATION 173 nautical miles/51.6 degrees
Work in progress
Functional tests on Discovery's orbiter maneuvering system are under way. Orbiter main landing gear inspections are in work this week and thermal protection system waterproofing efforts are ongoing.

For automatic e-mail subscriptions to these Shuttle status reports or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.

KSC Home Page Site Search FAQ's Site Survey Customer Forum NASA Centers Privacy Statement Headlines

Page Last Revised

Page & Curator Information

09/21/2000

Curator: Kay Grinter (Kay.Grinter-1@ksc.nasa.gov) -- InDyne, Inc./
Web Development: JBOSC Web Development Team
A Service of the NASA/KSC External Relations and Business Development Directorate
JoAnn H. Morgan, Director