Camera icon.This link bypasses navigation taking you directly to the contents of this page.

How to Use the Images

 

Inquiry Question

Historical Context

Map

Readings

Drawing 1
Photo 1
Photo 2 &
Drawing 2
Photo 3

Activities

Table of
Contents




Visual Evidence


Photo 4: The Moravian Chapel.
[Graphic] Photo 4 with link to higher quality photo.

(Photo by Diane LaBelle)

After 1743, 90 percent of all buildings were constructed of stone removed from a quarry on the south side of the Lehigh River. The Gemeinhaus contained a chapel, but a larger building was needed as the community grew. This building was constructed in 1751 and attached to the Gemeinhaus. A third church replaced this one in 1806.

Questions for Photo 4

1. Are there obvious indications of the purpose served by the building? If so, what are they?

2. How does the exterior of the chapel differ from other stone buildings in Bethlehem?

* The photo on this screen has a resolution of 72 dots per inch (dpi), and therefore will print poorly. You can obtain a high quality version of Photo 4, but be aware that the file will take as much as 30 seconds to load with a 28.8K modem.

 

Continue

Comments or Questions

TCP
National Park Service arrowhead with link to NPS website.