skip navigation
Text Size small medium large  

skip navigation
Electric
Hydropower
Annual Charges
Safety and Inspections
Environment
Industry Activities
General Information
Licensing
Compliance and Administration
Handbooks
Guidelines
Workshops
Regulation
Gas
Liquefied Natural Gas (LNG)
Oil

Industries

Hydropower - Compliance and Administration
    Jurisdiction Determination

    Section 23(b)(1) of the Federal Power Act requires an entity to either file a hydropower license application for a proposed project or file a Declaration of Intention with the Commission to determine if the proposed project requires licensing. If the hydropower project is operating, the operator should file a Petition for Declaratory Order.

    The following guide and regulation are provided below to assist you in filing your Declaration of Intention or Petition for Declaratory Order.


    Please submit an original and 8 copies of your Declaration of Intention or Petition for Declaratory Order with the:

      Secretary
      Federal Energy Regulatory Commission
      888 First Street, N.E.
      Washington, DC 20426

  Contact Information

Henry Ecton
Telephone: 202-502-8768
Email: henry.ecton@ferc.gov
 

  Additional Information

 



Updated: May 2, 2005