GOES 13 Spacecraft Status Summary
Spacecraft Letter: |
N |
Spacecraft Location: |
105 West |
AOCS Mode: |
ON-ORBIT |
Launch Date: |
05/24/2006 |
Operational Date: |
|
Operational Status: |
Standby |
Notes: |
GOES-13 resumed standby status on 1/06/2009 at 15:00z |
Subsystem Status:
Subsystem |
Description |
Status |
IMAGER | Imager | GREEN |
SEM | Space Environment Monitor | ORANGE |
SOUNDER | Sounder | GREEN |
SXI | Solar X-Ray Imager | ORANGE |
ACS | Attitude Control System | GREEN |
COMM | Communication Subsystem | GREEN |
INR | Image Navigation and Registration | GREEN |
PAYLOAD | PAYLOAD | GREEN |
POWER | Electrical Power Subsystem | GREEN |
PROP | Propulsion | GREEN |
TANDC | Telemetry & Command | GREEN |
THERMAL | Thermal Control Subsystem | GREEN |
Click on the subsystem name to get detailed status for that
subsystem.
Status Key
Status Color |
|
Meaning |
GREEN |
= |
Operational (or capable of) |
YELLOW |
= |
Operational with limitations (or Standby) |
ORANGE |
= |
Operational with Degraded Performance |
RED |
= |
Not Operational |
BLANK |
= |
No Status Reported |
|