Bonneville Power Administration

http://www.bpa.gov

Link to BPA Home Page Skip Primary Navigation
EFW Home Page
BPA Home Triangle Bullet Point EFW Home Triangle Bullet Point Environmental Services Triangle Bullet Point DOCUMENT LIBRARY: Environmental Planning and Review Documents Triangle Bullet Point Arlington PPM Wind Project Interconnection
This is a spacer graphic
This is a spacer graphicTriangle bullet pointEnvironmental Policies and Planning

This is a spacer graphicTriangle bullet pointProtecting and Recovering Endangered Species

This is a spacer graphicTriangle bullet pointProtecting and Preserving Cultural Resources

This is a spacer graphicTriangle bullet pointReducing Pollution and Managing Environmental Hazards

This is a spacer graphicTriangle bullet pointEnvironmental Management System

This is a spacer graphicTriangle bullet pointDOCUMENT LIBRARY: Environmental Planning and Review Documents


Adjust your View!
Link to Firstgov


Arlington PPM (Leaning Juniper) Wind Project Interconnection
Gilliam County, Oregon



  • PROJECT DESCRIPTION:


    PPM Energy, Inc. (PPM) has requested an interconnection of 200-MW to the Federal Columbia River Transmission grid. PPM would construct and own a collector substation adjacent to BPA's proposed Jones Canyon Switching Station and connect to that facility. The McNary-Santiam #2 230-kV line would be looped through the Jones Canyon Switching station. The existing McNary-Santiam #2 230-kV line would be upgraded in four locations, mostly through the installation of intermediate wood poles to increase ground clearance. One location is on the Warm Spring Indian Reservation. See map.

  • CURRENT STATUS:


    PPM has received a Gilliam County Conditional Use Permit to construct a wind project of up to 103.5 MW. BPA sought public comment on the interconnection of this facility. Comments were due by February 20, 2005. Transmission line upgrades have been evaluated in the field. Jones Canyon Substation was evaluated as part of the Arlington CEP Wind Project Interconnection. A Tiered Record of Decision was signed on March 11, 2005.
  • CONTACT:


    For further information on this project, please contact Don Rose, BPA Environmental Lead.

  • DOCUMENTS:


    Record of Decision (65Kb pdf) (03/11/05)
    Letter to Public (55Kb doc) (02/08/05)
    Map (3.2MB pdf) (02/08/05)


If you believe information on this site is missing or in error, please Submit that comment here.
NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy

     
 Page last reviewed on 1/19/2005 1:48:59 PM