KENNEDY SPACE CENTER, FLA. -- Kristin Rumpf, with United Space Alliance - Main Propulsion System Engineering, looks over part of Endeavour before welding of the flow liner begins. Endeavour is scheduled to fly on mission STS-113 in November. The mission payload is the P1 Integrated Truss Structure, the first portside truss to go to the International Space Station, and will be attached to the central truss segment, S0, on the Station. Also additional cooling radiators will be delivered but will remain stowed until flight 12A.1. (Photo Release Date: 08/22/2002 )

KSC-02PD-1203 - Raw ASCII Text Caption file
KSC-02PD-1203 - Low (GIF Format, 320x240 pixels x 256 colors, approx 50 Kbytes)
KSC-02PD-1203 - Medium (JPEG format, 1024x768 pixels x 256 colors, approx 250 Kbytes)
KSC-02PD-1203 - High (JPEG, 2040x2640 pixels x 16 million colors, approx 400 Kbytes)

STS-113 KSC Photo IndexNext Image KSC-02PD-1204


DISCLAIMER: No copyright protection is asserted for these photographs.

If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. These photographs are available for preview and download in electronic digital form ONLY. They may not be ordered from NASA in photograph form. (See NASA Copyright Notice)