Listing of Statistics for Run2-2009 (Created Fri Aug 14 02:05:53 CDT 2009)
User periods in this interval
05/27/2009 08:00 To 06/02/2009 08:00 144.00 Hours, Delivered Beam: 135.21 Hours, 2 Fault(s), 67.61 MTBF, 93.90% of Sched. Time
06/03/2009 08:00 To 06/09/2009 08:00 144.00 Hours, Delivered Beam: 137.30 Hours, 4 Fault(s), 34.33 MTBF, 95.35% of Sched. Time
06/10/2009 08:00 To 06/16/2009 08:00 144.00 Hours, Delivered Beam: 136.71 Hours, 6 Fault(s), 22.79 MTBF, 94.94% of Sched. Time
06/17/2009 08:00 To 06/22/2009 08:00 120.00 Hours, Delivered Beam: 113.32 Hours, 1 Fault(s),113.32 MTBF, 94.43% of Sched. Time
06/24/2009 08:00 To 07/02/2009 08:00 192.00 Hours, Delivered Beam: 181.94 Hours, 4 Fault(s), 45.49 MTBF, 94.76% of Sched. Time
07/06/2009 08:00 To 07/14/2009 08:00 192.00 Hours, Delivered Beam: 192.00 Hours, 0 Fault(s),192.00 MTBF,100.00% of Sched. Time
07/15/2009 08:00 To 07/20/2009 08:00 120.00 Hours, Delivered Beam: 117.23 Hours, 2 Fault(s), 58.62 MTBF, 97.69% of Sched. Time
07/22/2009 08:00 To 07/28/2009 08:00 144.00 Hours, Delivered Beam: 144.00 Hours, 0 Fault(s),144.00 MTBF,100.00% of Sched. Time
07/29/2009 08:00 To 08/04/2009 08:00 144.00 Hours, Delivered Beam: 143.99 Hours, 0 Fault(s),143.99 MTBF,100.00% of Sched. Time
08/05/2009 08:00 To 08/11/2009 08:00 144.00 Hours, Delivered Beam: 144.00 Hours, 0 Fault(s),144.00 MTBF,100.00% of Sched. Time
08/12/2009 08:00 To 08/14/2009 02:01 42.02 Hours, Delivered Beam: 42.01 Hours, 0 Fault(s), 42.01 MTBF, 99.99% of Sched. Time
Total Amount of User Time in this interval | 1529.97 HoursDelivered Beam | 1487.72 Hours |
Percentage of Scheduled Time (*) | 97.24 % |
Mean Time Between Faults (MTBF) | 78.30 Hours |
Downtime During Period | 42.25 Hours |
Total integrated Current During This Period | 150.08 A-hr |
Mean Fill Duration in Period | 74.39 Hours |
Faults per Day of Delivered Beam | 0.31 |
Total Number of Faults | 19 |
Valid fills Beginning in this Time Interval |   |   |   | Fill # | Start |   | End | Duration (min: 1.0) | Reason for Fill Termination | Length of Downtime | Downtime is associated with the end of a fill. The first fill of a period will have any downtime before the fill on the line above.
|
|   | 0.00 |
| # 1 | 05/27 08:00 | To | 05/29 03:53 | 43.89    | RF1 HV problem [Rf] | 8.29 | Multiple trips, repair
| # 6 | 05/29 12:11 | To | 05/30 19:00 | 30.82    | RF1 Cathode Voltage [RF] | 0.49 | Investiation, refill
| # 7 | 05/30 19:29 | To | 06/02 07:59 | 60.50    | Int Dump: End of Period | 0.00 | |
|
|   | 0.00 |
| # 8 | 06/03 08:00 | To | 06/03 15:23 | 7.38    | RF Pwr Monitor trip[RF] | 0.37 | Investigation, refill
| # 9 | 06/03 15:45 | To | 06/03 23:01 | 7.27    | Under investigation | 0.22 | Investigation, refill
| # 10 | 06/03 23:14 | To | 06/04 21:00 | 21.77    | S38A:S2:PS problem [PS] | 5.69 | Two more P.S. swapped, conditioning, refill
| # 11 | 06/05 02:42 | To | 06/06 09:06 | 30.41    | RF2 HVPS trip [RF] | 0.42 | Investigation, refill
| # 12 | 06/06 09:31 | To | 06/09 08:00 | 70.47    | Int Dump: End of Period | 0.00 | |
|
|   | 0.00 |
| # 13 | 06/10 08:00 | To | 06/10 17:14 | 9.25    | SR RF4 Mod Anode [RF] | 0.45 | Reset & refill
| # 14 | 06/10 17:41 | To | 06/10 19:42 | 2.01    | RF4 Mod Anode [RF] | 0.63 | Kystron heater temp raised, reset and refilled
| # 15 | 06/10 20:20 | To | 06/10 23:13 | 2.89    | Human error [AOP] | 2.95 | Switch to RF1 providing, AOP 1.15 hrs, RF 1.8 hour
| # 16 | 06/11 02:10 | To | 06/13 23:18 | 69.13    | RF2 Arcs, Crowbar [RF] | 0.40 | Investigation, refill
| # 17 | 06/13 23:42 | To | 06/14 09:13 | 9.51    | S6A:P1 noise [DIAG] | 0.51 | Under investigation
| # 18 | 06/14 09:43 | To | 06/14 23:38 | 13.91    | RF2 Arcs, Crowbar [RF] | 2.35 | Second trip, waveguide switch
| # 20 | 06/15 01:59 | To | 06/16 07:59 | 30.00    | Int Dump: End of Period | 0.00 | |
|
|   | 0.00 |
| # 21 | 06/17 08:00 | To | 06/17 20:28 | 12.48    | S40 RF Cav. Vacuum [RF] | 6.67 | Blanked off waveguide to cav, RF3 trip [RF]
| # 23 | 06/18 03:09 | To | 06/22 07:59 | 100.84    | Int Dump: End of Period | 0.00 | |
|
|   | 0.00 |
| # 24 | 06/24 08:00 | To | 06/26 08:02 | 48.04    | 19BM PSS trip [SI] | 0.66 | Standardized, refilled
| # 25 | 06/26 08:42 | To | 06/29 11:56 | 75.24    | RF3 Heater trip [RF] | 1.22 | Waveguide switch, refill
| # 26 | 06/29 13:09 | To | 06/30 01:18 | 12.15    | S9BPLD mod.failure[DIAG] | 6.34 | 2nd trip, LMPS module swap, validation
| # 28 | 06/30 07:39 | To | 06/30 15:49 | 8.16    | S9BPLD mod.failure[DIAG] | 1.83 | Swapped BPLD module, validation, refill
| # 29 | 06/30 17:38 | To | 07/02 07:59 | 38.35    | Int Dump: End of Period | 0.00 | |
|
|   | 0.00 |
| # 30 | 07/06 08:00 | To | 07/14 07:59 | 192.00    | Int Dump: End of Period | 0.00 |
|
|   | 0.00 |
| # 31 | 07/15 08:00 | To | 07/15 10:42 | 2.70    | Human Error [UES] | 0.28 | Reset EPS trip, stored beam
| # 32 | 07/15 10:59 | To | 07/19 20:32 | 105.56    | S37 Sextupole trip[PS] | 2.48 | Swapped supply, PS group call-in, cable repair [PS]
| # 33 | 07/19 23:01 | To | 07/20 07:59 | 8.97    | Int Dump: End of Period | 0.00 | |
|
|   | 0.00 |
| # 34 | 07/22 08:00 | To | 07/28 07:59 | 144.00    | Int Dump: End of Period | 0.00 |
|
|   | 0.00 |
| # 35 | 07/29 08:00 | To | 08/04 07:59 | 143.99    | Int Dump: End of Period | 0.00 |
|
|   | 0.00 |
| # 36 | 08/05 08:00 | To | 08/11 07:59 | 144.00    | Int Dump: End of Period | 0.00 |
|
|   | 0.00 |
| # 37 | 08/12 08:00 | To | 08/14 02:00 | 42.01    | Fill Ongoing | 0.00 |
|
Top-Up Mode Statistics
Target Current Range +/- 2.0, Minimum Injector Downtime = 8.0 minutes
Total
Current in Range during Scheduled Topup Time | 97.08 % | Current in Range during Delivered Beam Time | 99.55 % | Injector Availability | 99.52 % |
Period Beginning 05/27/2009 08:00 | Current in Range | 96.68 % | Injector Availability | 96.63 % |
Out of Range at: | 05/30/2009 13:06:32 | to | 05/30/2009 17:36:00 : | 269.47 minutes |
Injector downtime: | 05/30/2009 13:01:36 | to | 05/30/2009 17:34:56 : | 273.33 minutes |
Period Beginning 06/03/2009 08:00 | Current in Range | 99.80 % | Injector Availability | 99.74 % |
Out of Range at: | 06/07/2009 07:58:56 | to | 06/07/2009 08:15:44 : | 16.80 minutes |
Injector downtime: | 06/07/2009 07:54:00 | to | 06/07/2009 08:15:40 : | 21.67 minutes |
Period Beginning 06/10/2009 08:00 | Current in Range | 99.36 % | Injector Availability | 99.17 % |
Out of Range at: | 06/10/2009 19:37:44 | to | 06/10/2009 19:42:32 : | 4.80 minutes |
Injector downtime: | 06/10/2009 19:29:44 | to | 06/10/2009 19:37:44 : | ~ 8.00 minutes |
Out of Range at: | 06/10/2009 23:12:48 | to | 06/10/2009 23:13:36 : | 0.80 minutes |
Injector downtime: | 06/10/2009 23:04:48 | to | 06/10/2009 23:12:48 : | ~ 8.00 minutes |
Out of Range at: | 06/14/2009 05:09:12 | to | 06/14/2009 05:56:24 : | 47.20 minutes |
Injector downtime: | 06/14/2009 05:04:16 | to | 06/14/2009 05:56:20 : | 52.07 minutes |
Period Beginning 06/17/2009 08:00 | Current in Range | 100.00 % | Injector Availability | 100.00 % |
Period Beginning 07/06/2009 08:00 | Current in Range | 100.00 % | Injector Availability | 100.00 % |
Period Beginning 07/15/2009 08:00 | Current in Range | 100.00 % | Injector Availability | 100.00 % |
Period Beginning 07/22/2009 08:00 | Current in Range | 100.00 % | Injector Availability | 100.00 % |
Period Beginning 07/29/2009 08:00 | Current in Range | 100.00 % | Injector Availability | 100.00 % |
Period Beginning 08/05/2009 08:00 | Current in Range | 100.00 % | Injector Availability | 100.00 % |
The information on this page is automatically generated and may contain errors.
An official operations statistics page will be posted at the end of each user period.
|