Listing of Statistics for Run2-2009 (Created Fri Aug 14 02:05:53 CDT 2009)
User periods in this interval
05/27/2009 08:00 To 06/02/2009 08:00 144.00 Hours, Delivered Beam: 135.21 Hours, 2 Fault(s), 67.61 MTBF, 93.90% of Sched. Time 06/03/2009 08:00 To 06/09/2009 08:00 144.00 Hours, Delivered Beam: 137.30 Hours, 4 Fault(s), 34.33 MTBF, 95.35% of Sched. Time 06/10/2009 08:00 To 06/16/2009 08:00 144.00 Hours, Delivered Beam: 136.71 Hours, 6 Fault(s), 22.79 MTBF, 94.94% of Sched. Time 06/17/2009 08:00 To 06/22/2009 08:00 120.00 Hours, Delivered Beam: 113.32 Hours, 1 Fault(s),113.32 MTBF, 94.43% of Sched. Time 06/24/2009 08:00 To 07/02/2009 08:00 192.00 Hours, Delivered Beam: 181.94 Hours, 4 Fault(s), 45.49 MTBF, 94.76% of Sched. Time 07/06/2009 08:00 To 07/14/2009 08:00 192.00 Hours, Delivered Beam: 192.00 Hours, 0 Fault(s),192.00 MTBF,100.00% of Sched. Time 07/15/2009 08:00 To 07/20/2009 08:00 120.00 Hours, Delivered Beam: 117.23 Hours, 2 Fault(s), 58.62 MTBF, 97.69% of Sched. Time 07/22/2009 08:00 To 07/28/2009 08:00 144.00 Hours, Delivered Beam: 144.00 Hours, 0 Fault(s),144.00 MTBF,100.00% of Sched. Time 07/29/2009 08:00 To 08/04/2009 08:00 144.00 Hours, Delivered Beam: 143.99 Hours, 0 Fault(s),143.99 MTBF,100.00% of Sched. Time 08/05/2009 08:00 To 08/11/2009 08:00 144.00 Hours, Delivered Beam: 144.00 Hours, 0 Fault(s),144.00 MTBF,100.00% of Sched. Time 08/12/2009 08:00 To 08/14/2009 02:01 42.02 Hours, Delivered Beam: 42.01 Hours, 0 Fault(s), 42.01 MTBF, 99.99% of Sched. Time
Total Amount of User Time in this interval 1529.97 Hours
Delivered Beam 1487.72 Hours
Percentage of Scheduled Time (*) 97.24 %
Mean Time Between Faults (MTBF) 78.30 Hours
Downtime During Period 42.25 Hours
Total integrated Current During This Period 150.08 A-hr
Mean Fill Duration in Period 74.39 Hours
Faults per Day of Delivered Beam 0.31
Total Number of Faults 19
Valid fills Beginning in this Time Interval      
Fill # Start  End Duration
(min: 1.0)
Reason for Fill Termination Length of Downtime Downtime is associated with the end of a fill. The first fill of a period will have any downtime before the fill on the line above.

  0.00
# 1 05/27 08:00 To 05/29 03:53 43.89    RF1 HV problem [Rf] 8.29 Multiple trips, repair
# 6 05/29 12:11 To 05/30 19:00 30.82    RF1 Cathode Voltage [RF] 0.49 Investiation, refill
# 7 05/30 19:29 To 06/02 07:59 60.50    Int Dump: End of Period 0.00

  0.00
# 8 06/03 08:00 To 06/03 15:23 7.38    RF Pwr Monitor trip[RF] 0.37 Investigation, refill
# 9 06/03 15:45 To 06/03 23:01 7.27    Under investigation 0.22 Investigation, refill
# 10 06/03 23:14 To 06/04 21:00 21.77    S38A:S2:PS problem [PS] 5.69 Two more P.S. swapped, conditioning, refill
# 11 06/05 02:42 To 06/06 09:06 30.41    RF2 HVPS trip [RF] 0.42 Investigation, refill
# 12 06/06 09:31 To 06/09 08:00 70.47    Int Dump: End of Period 0.00

  0.00
# 13 06/10 08:00 To 06/10 17:14 9.25    SR RF4 Mod Anode [RF] 0.45 Reset & refill
# 14 06/10 17:41 To 06/10 19:42 2.01    RF4 Mod Anode [RF] 0.63 Kystron heater temp raised, reset and refilled
# 15 06/10 20:20 To 06/10 23:13 2.89    Human error [AOP] 2.95 Switch to RF1 providing, AOP 1.15 hrs, RF 1.8 hour
# 16 06/11 02:10 To 06/13 23:18 69.13    RF2 Arcs, Crowbar [RF] 0.40 Investigation, refill
# 17 06/13 23:42 To 06/14 09:13 9.51    S6A:P1 noise [DIAG] 0.51 Under investigation
# 18 06/14 09:43 To 06/14 23:38 13.91    RF2 Arcs, Crowbar [RF] 2.35 Second trip, waveguide switch
# 20 06/15 01:59 To 06/16 07:59 30.00    Int Dump: End of Period 0.00

  0.00
# 21 06/17 08:00 To 06/17 20:28 12.48    S40 RF Cav. Vacuum [RF] 6.67 Blanked off waveguide to cav, RF3 trip [RF]
# 23 06/18 03:09 To 06/22 07:59 100.84    Int Dump: End of Period 0.00

  0.00
# 24 06/24 08:00 To 06/26 08:02 48.04    19BM PSS trip [SI] 0.66 Standardized, refilled
# 25 06/26 08:42 To 06/29 11:56 75.24    RF3 Heater trip [RF] 1.22 Waveguide switch, refill
# 26 06/29 13:09 To 06/30 01:18 12.15    S9BPLD mod.failure[DIAG] 6.34 2nd trip, LMPS module swap, validation
# 28 06/30 07:39 To 06/30 15:49 8.16    S9BPLD mod.failure[DIAG] 1.83 Swapped BPLD module, validation, refill
# 29 06/30 17:38 To 07/02 07:59 38.35    Int Dump: End of Period 0.00

  0.00
# 30 07/06 08:00 To 07/14 07:59 192.00    Int Dump: End of Period 0.00

  0.00
# 31 07/15 08:00 To 07/15 10:42 2.70    Human Error [UES] 0.28 Reset EPS trip, stored beam
# 32 07/15 10:59 To 07/19 20:32 105.56    S37 Sextupole trip[PS] 2.48 Swapped supply, PS group call-in, cable repair [PS]
# 33 07/19 23:01 To 07/20 07:59 8.97    Int Dump: End of Period 0.00

  0.00
# 34 07/22 08:00 To 07/28 07:59 144.00    Int Dump: End of Period 0.00

  0.00
# 35 07/29 08:00 To 08/04 07:59 143.99    Int Dump: End of Period 0.00

  0.00
# 36 08/05 08:00 To 08/11 07:59 144.00    Int Dump: End of Period 0.00

  0.00
# 37 08/12 08:00 To 08/14 02:00 42.01    Fill Ongoing 0.00
Top-Up Mode Statistics
Target Current Range +/- 2.0, Minimum Injector Downtime = 8.0 minutes Total
Current in Range during Scheduled Topup Time 97.08 %
Current in Range during Delivered Beam Time 99.55 %
Injector Availability 99.52 %
Period Beginning 05/27/2009 08:00
Current in Range 96.68 %
Injector Availability 96.63 %
Out of Range at: 05/30/2009 13:06:32 to 05/30/2009 17:36:00 : 269.47 minutes
Injector downtime:05/30/2009 13:01:36 to 05/30/2009 17:34:56 : 273.33 minutes
Period Beginning 06/03/2009 08:00
Current in Range 99.80 %
Injector Availability 99.74 %
Out of Range at: 06/07/2009 07:58:56 to 06/07/2009 08:15:44 : 16.80 minutes
Injector downtime:06/07/2009 07:54:00 to 06/07/2009 08:15:40 : 21.67 minutes
Period Beginning 06/10/2009 08:00
Current in Range 99.36 %
Injector Availability 99.17 %
Out of Range at: 06/10/2009 19:37:44 to 06/10/2009 19:42:32 : 4.80 minutes
Injector downtime:06/10/2009 19:29:44 to 06/10/2009 19:37:44 : ~ 8.00 minutes
Out of Range at: 06/10/2009 23:12:48 to 06/10/2009 23:13:36 : 0.80 minutes
Injector downtime:06/10/2009 23:04:48 to 06/10/2009 23:12:48 : ~ 8.00 minutes
Out of Range at: 06/14/2009 05:09:12 to 06/14/2009 05:56:24 : 47.20 minutes
Injector downtime:06/14/2009 05:04:16 to 06/14/2009 05:56:20 : 52.07 minutes
Period Beginning 06/17/2009 08:00
Current in Range 100.00 %
Injector Availability 100.00 %
Period Beginning 07/06/2009 08:00
Current in Range 100.00 %
Injector Availability 100.00 %
Period Beginning 07/15/2009 08:00
Current in Range 100.00 %
Injector Availability 100.00 %
Period Beginning 07/22/2009 08:00
Current in Range 100.00 %
Injector Availability 100.00 %
Period Beginning 07/29/2009 08:00
Current in Range 100.00 %
Injector Availability 100.00 %
Period Beginning 08/05/2009 08:00
Current in Range 100.00 %
Injector Availability 100.00 %
The information on this page is automatically generated and may contain errors. An official operations statistics page will be posted at the end of each user period.