Skip directly to search Skip directly to A to Z list Skip directly to navigation Skip directly to site content Skip directly to page options

Summary of the water contamination situation at Camp Lejeune

  • 8 water treatment plants serving the base
    • Hadnot Point (HP)
      • Began operation in 1942
      • Areas served:
        • Mainside barracks
        • Hospital Point family housing
        • Family housing at Midway Park, Paradise Point, and Berkeley Manor until June 1972
    • Tarawa Terrace (TT)
      • Began operation in 1952
      • Shut down in March 1987
      • Areas served:
        • Tarawa Terrace family housing
        • Knox trailer park
    • Holcomb Boulevard (HB)
      • Began operation in June 1972
      • Areas served:
        • Family housing at Midway Park, Paradise Point, Berkeley Manor, and Watkins Village
        • Tarawa Terrace family housing after March 1987
    • Courthouse Bay
    • Rifle Range
    • Onslow Beach
    • Montford Point/Camp Johnson
    • New River

  • VOCs detected in HP and TT wells during 1980-85 sampling program
    • Samples collected by Camp Lejeune staff
    • Chemicals detected included TCE, PCE, benzene, DCE
    • Contamination of wells began many years before detection
    • Other on-base treatment plants were not contaminated

  • Contamination of HP and TT drinking water systems was intermittent
    • Wells rotated in and out of service
    • Each system had more wells than necessary to supply water on any given day

  • Tarawa Terrace Treatment Plant
    • PCE (perchloroethylene or tetrachloroethylene) was the main contaminant
    • Maximum level detected in drinking water was 215 parts per billion (ppb) in February 1985
    • Source of contamination was ABC One-Hour Cleaners, an off-base dry cleaning firm
    • The most contaminated wells were shut down in February 1985
    • Water modeling conducted by ATSDR is complete
      • PCE concentration exceeded the current limit of 5 ppb in drinking water at the TT water treatment plant for 346 months during November 1957-February 1987

  • Hadnot Point Treatment Plant
    • TCE (trichloroethylene) was the main contaminant
    • Maximum level detected in drinking water was 1,400 ppb in May 1982
      • The current limit for TCE in drinking water is 5 ppb
    • Other contaminants detected included DCE (trans-1,2-dichloroethylene) at a maximum of 407 ppb in January 1985, PCE and benzene
    • Multiple sources of contamination
      • Leaking underground storage tanks
      • Waste disposal sites
    • The most contaminated wells were shut down by February 1985
    • Water modeling is ongoing
      • Presently unknown when contamination of some HP wells began, but may have begun as early as the late 1940s or early 1950s
      • When the water modeling is completed by mid-2009, the dates when the system was contaminated will be determined

  • Holcomb Boulevard wells were not contaminated
    • Contaminated water from HP supplied the HB system when the HB plant was shut down for almost two weeks during January 27-Febraury 7, 1985
    • Contaminated water from HP may have been used sporadically to supplement the HB supply during dry summer months when the golf courses were watered


 
Contact Us:
  • Agency for Toxic Substances and Disease Registry
    4770 Buford Hwy NE
    Atlanta, GA 30341
  • (800) 232-4636
    TTY: (888) 232-6348
    24 Hours/Every Day
  • atsdrcamplej@cdc.gov
USA.gov: The U.S. Government's Official Web PortalDepartment of Health and Human Services
Agency for Toxic Substances and Disease Registry, 4770 Buford Hwy NE, Atlanta, GA 30341
Contact CDC: 800-232-4636 / TTY: 888-232-6348

A-Z Index

  1. A
  2. B
  3. C
  4. D
  5. E
  6. F
  7. G
  8. H
  9. I
  10. J
  11. K
  12. L
  13. M
  14. N
  15. O
  16. P
  17. Q
  18. R
  19. S
  20. T
  21. U
  22. V
  23. W
  24. X
  25. Y
  26. Z
  27. #