NOTE: The STS-85 solid rocket boosters arrived at Hangar AF Saturday afternoon and standard inspections are under way. Preliminary evaluations revealed only minor damage, including the dislodged integrated electronic assembly, and no significant solid rocket motor erosion.
On orbit, all of Discovery's systems are performing well and science investigations are continuing successfully.
STS-85 crew members: Commander Curtis Brown, Pilot Kent Rominger, Mission Specialists Jan Davis, Robert Curbeam and Stephen Robinson; and Payload Specialist Bjarni Tryggvason
NOTE: The Space Shuttle Atlantis arrived in the Vehicle Assembly Building at about 10:30 a.m. Today the orbiter will be lifted to the vertical position and soft mated to the external tank. Orbiter/external tank umbilical mate will begin late Tuesday and the Shuttle Interface Test is scheduled for Wednesday. Atlantis is slated to roll out to the launch pad at 2 a.m. next Monday.
STS-86 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
NOTE: Saturday, technicians completed voltage tests on Columbia's fuel cells and engineers are evaluating irregular voltage readings from fuel cell No. 1. The Shuttle's aft propulsion system pod is undergoing functional checkout this week and main propulsion system leak and functional tests begin today. Work to deservice freon coolant loop No. 2 is complete and component change-out activities are scheduled to begin this week. Evaluations continue on the orbiter's oxidizer cross-feed line.
STS-87 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
NOTE: Fuel cell No. 1 mechanical connections and leak checks are complete and good. Fuel cell No. 3 mechanical mates are in work. Installation of auxiliary power units No. 2 and No. 3 continues through Wednesday and Endeavour's orbital maneuvering system pod check-outs also continue.
For automatic e-mail subscriptions to this daily Shuttle status report or KSC originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.
To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."
Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm
Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/