Preliminary Assessment/ Site Investigation |
Remedial Investigation/Feasibility Study |
Proposed Remedial Action Plan/Record of Decision |
Remedial Design, Remedial Action and Operation and Maintenance |
Closeout |
Determining the threat and hazardous substances present, and whether the site should be placed on the National Priorities List. |
Determining the nature and extent of contamination, technical practicality of taking action, possible actions to take and risks involved. A risk assessment is made. |
Selecting and committing to a long-term plan in a document. |
Designing, building, and operating based on the plan. |
Requiring no further action other than long-term monitoring. Propose deletion from the National Priorities List. |
Public involvement takes place throughout the process through Restoration Advisory boards, public meetings and comment periods, and fact sheet distribution. |