NASA - National Aeronautics and Space Administration
Click here for our Site Map.
Go
A B C D E F G H I
J K L M N O P Q R
S T U V W X Y Z
Aeronautics
Anniversaries
Biographies
Centers & Offices
Exploration
Human Spaceflight
Photo-Video
Reference
Satellites
Space Biology
Space Policy
Space Science




Please scroll down the results page when search is completed.

Click here for NASA Advanced Search options.

Decadal Planning Team


Background Information

Links to Primary Source Documents


NASA's Decadal Planning Team and the Policy

Formulation of the Vision for Space Exploration

By Stephen Garber and Glen Asner


In the spring of 1999, approximately five months after a budget examiner at the Office of Management and Budget (OMB) took the unusual step of adding $5 million to NASA’s budget for long term planning, NASA Administrator Daniel Goldin formed what came to be known as the Decadal Planning Team (DPT).  At the most basic level, Goldin intended the planning group to generate a slate of space architecture options for the new presidential administration that would take the reins of government following the 2000 election.  He sought to ease the presidential transition and to position NASA for increased funding should the budget surpluses of the Clinton years continue.  Goldin hoped, furthermore, that in the process of devising a more ambitious space exploration agenda, the DPT would find a way to overcome the cultural barriers that divided NASA and hindered collaboration between the human spaceflight and robotic space science communities.  Goldin also sought to change the way NASA and its supporters understood the Agency’s long-term mission and conveyed that mission to the public.  The public deserved a solid, practical and/or scientific justification for human exploration instead of the sloganeering and appeals to emotion that many space advocates promoted. 


Goldin organized the DPT as a small, confidential planning group composed of personnel from NASA’s Field Centers and Headquarters.  The group reported to NASA’s Associate Administrators for Space Flight and Space Science, Joseph Rothenberg and Edward Weiler respectively, both of whom took a strong interest in the team’s work. The team quickly established that its plans would be driven by scientific priorities and would be “technology enabled,” meaning the development of certain key capabilities such as nuclear systems and advanced in-space propulsion techniques would enable journeys to places in the Solar System that are distant and physically hostile to humans.  While many discussions in early meetings focused on sending astronauts to Mars, the team rejected the concept of “destination-driven” exploration.  That is, priority technology investments should be made so that astronauts could travel to whichever destination was a priority for scientific, commercial, or policy reasons, rather than investing in technologies that would limit exploration to a single location. In practical terms, this meant that the DPT seriously analyzed the potential scientific payoffs from sending humans to the Moon and libration points.  It also meant that the team avoided defining the goals of exploration in terms of reaching a single destination within a set timeframe, an approach most prominently employed by President Kennedy in declaring the goal of the Apollo program as sending an astronaut to the Moon before the end of the 1960s.  To avoid the pitfalls of “destination-driven” exploration and to enable future exploration without enormous budgetary expenditures, DPT recommended a “steppingstones” approach in which each phase of the plan would build upon prior accomplishments and would not be activated until both the financial resources and advanced technologies necessary to complete the phase were available. 


The team did far more than define and recommend the broad outlines of a grand exploration strategy.  A great deal of the team’s time and budget were spent on finding solutions to such perennial hurdles to long-term space exploration as the adverse human health effects of space radiation, the need for revolutionary in-space propulsion technologies, and the need for nuclear systems to provide electricity and in-space propulsion beyond the Earth-Moon system. 
After two years, an expanded DPT was renamed the NASA Exploration Team (NEXT) and acquired a new team leader.  Late in 2001, Goldin left NASA and Sean O’Keefe took over as NASA Administrator.  O’Keefe took a strong interest in nuclear technologies and the team’s work in general. 


The NEXT planning effort suddenly and unexpectedly took on added significance after the Space Shuttle Columbia accident on 1 February 2003.  Almost immediately, the accident prompted a great deal of reflection within NASA, the Bush Administration, and the public about NASA’s strategic direction and the proper role for space exploration in our society. 


One result was that the White House and a host of individuals from other Federal agencies became involved in the process of charting a new course for NASA.  Basically led by a National Security Council staff member, this process involved high-level officials from NASA and Cabinet Departments, such as the Departments of Defense and State.  The ensuing debates over NASA’s future and that of U.S. civilian space were channeled through a prescribed national security policymaking process. While NASA worked to recover from the Columbia accident, the effort to find a compelling long-term plan for space exploration gained urgency. Within NASA, many of the same people who had worked on DPT and NEXT were called upon to advise this circle of policymakers.  The Administration’s policy formulation process culminated in a briefing to the President on 19 December 2003 (two days after the centennial of flight anniversary).  The briefing went smoothly and staff members obtained President Bush’s concurrence on a new space policy. 


On 14 January 2004, less than a year after the Columbia accident, Bush came to NASA Headquarters to unveil what became known as the new “Vision for Space Exploration.”  The Vision called for NASA to safely conclude the Shuttle program, finish the International Space Station, and develop a long-term program of human and robotic space exploration to send humans back to the Moon, on to Mars, and beyond. 


Below are links to some key DPT documents, as well as a short essay by Harley Thronson, senior scientist for DPT and NEXT, about this topic and these files.  Historians Glen Asner and Stephen Garber are currently writing a book-length history of the DPT and the policy development of the Vision. 



Primary Source Documents

Annual Reports and Summaries


NRC Steppingstones to The Future of Human Spaceflight

CY00 Annual Report

FY01 Annual Report

  • FY01 Annual Report Overview
  • FY01 Annual Report Tech Investments
  • FY01 Annual Report Earth's Neighborhood
  • FY01 Annual Report Earth Neighborhood, Bioastronautics
  • FY01 Annual Report Tech, Leveraging
  • FY01 Annual Report Nuclear Power and Prop Recommendations
  • FY02 Annual Report

  • NExT Overview-Priorities-Goals
  • NExT Talking Points Sept 2002
  • FY02 Annual Report Overview
  • FY02 Annual Report Chapter 2 Architectures
  • FY02 Annual Report Chapter 3 Hurdles 1- Transportation
  • FY02 Annual Report Chapter 3 Hurdles 2 - Power
  • FY02 Annual Report Chapter 3 Hurdles 3 - Crew Health & Safety
  • FY02 Annual Report Chapter 3 Hurdles 4 - Human Robot Ops
  • FY02 Annual Report Chapter 3 Hurdles 5 - Space Systems
  • FY02 Annual Report Chapter 4 Technology Planning
  • FY02 Annual Report Chapter 5 Leveraging-1
  • FY02 Annual Report Chapter 6 Future Direction

  • Architectures Design Reference Missions #C8D7


    Exploration Requirements for ETO - NExT May 2002

    Libr.Points & In-Space Ops In-SpaceServicing Report - Boeing NExT Sept. 2002

    Libr.Points & In-Space Ops L1-Moon Exploration Architecture DPT Jun 2000

    Libration Points & In-Space Ops L1-Moon Lander Design JSC - DPT Nov. 01

    Libration Ops-Gateway Update JSC DPT Aug.2001

    Libration Point Gateway Final Report DPT Oct 2001

    Mars - DPT Mars Missions Analysis Summary

    Moon - L1-Moon Exploration Architecture DPT June 2000

    Moon - L1-Moon Lander Design JSC DPT Nov 2001

    NExT DRM Summaries Jul_02 (Advanced Draft)

    Recent Human Exploration Studies DPT JSC - January 2000


    Human Exploration


    Human Subsystems-Planning Guide JSC DPT Sept. 2001


    Animations of Concepts


    Asteroid Exploration Concepts

  • Photo - Human exploration of asteroid
  • Photo - Human journey to asteroid
  • Movie - Human mission to asteroid
  • Libration Point Exploration Concepts

  • Photo - Astronauts approach E-M L1 Gateway
  • Photo - Docked at E-M L1 Gateway
  • Photo - E-M L1 Gateway transit
  • Photo - Telescope Ops at Libration Points Advanced telescope (JPL) concept
  • Photo - Telescope Ops at Libration Points Advanced telescope (JPL) serviced at E-M Gateway-1
  • Photo - Telescope Ops at Libration Points Advanced telescope (JPL) serviced at E-M Gateway-2
  • Photo - Telescope Ops at Libration Points Advanced telescope array at S-E L2
  • Photo - Transfer vehicle docked at Gateway-1
  • Photo - Transfer vehicle docked at Gateway-2
  • Movie - E-M L1 Gateway operations
  • Lunar Exploration Concepts

  • Photo - Astronaut on Moon
  • Photo - Lunar Exploration Via Libration Points - E-M L1 Exploration Gateway
  • Photo - Lander transfers to Moon from E-M L1
  • Photo - Lunar lander at E-M L1 Gateway
  • Photo - Lunar lander departs E-M L1 Gateway
  • Movie - Libration point-Moon mission
  • Photo - Lunar Lander on surface
  • Photo - Lunar Lander touches down
  • Photo - Lunar Lander
  • Mars Exploration Concepts

  • Photo - Astronaut and robot partner
  • Photo - Mars astronauts return to orbit-1
  • Photo - Mars astronauts return to orbit-2
  • Photo - Mars habitation arrives
  • Movie - Human Mars mission
  • Movie - Tether-based Mars exploration
  • Propulsion Transportation Concepts #2825

  • Photo - Earth-to-Moon transfer vehicle-1
  • Photo - Earth-to-Moon transfer vehicle-2
  • Photo - Earth-to-Moon transfer vehicle-3
  • Photo - ETO tether
  • Movie - Plasma sail
  • Photo - Plasma sail
  • Photo - Shuttle carries lunar transfer vehicle
  • Robots

  • Photo - Robonaut (JSC) on Mars surface
  • Photo - Robotic assembly with UMD Ranger

  • Management, Rules


    Ground rules-assumptions DPT Oct 2000


    Science and Exploration


    Exploration and Science Goals DPT May 2000

    Science Objectives NExT 2002

    Science Priorities 2004


    Technology Priorities, Recommendations


    Artificial Gravity Status and Options NExT July 2002

    Breakthrough Materials DPT July 2000

    Breakthrough Propulsion DPT October 1999

    Candidate Breakthrough Technologies DPT August 1999

    Common Technology Investment Recommendations DPT Spring 2000

    Human Exploration Nuclear Requirements V1

    In-Space Propulsion Options DPT August 1999

    IT and Human Exploration DPT 2000

    Mars Medical Status DPT August 1999

    Mars Medical Strategy DPT 99

    Mars Precursor Needs DPT 2000

    Overview Tech Breakthroughs DPT 2000

    Power and Transportation Technologies DPT 2000

    Robotics SOA NExT May 2002

    Robotics SOA NExT Sept 2001

    Robotics SOA-Projections NExT August 2001

    Space Biomedical Breakthroughs DPT 2000

    Space Biomedical Strategic Plan DPT JSC 2000

    Space Resources DPT Boulder 2000



     ADA Navigation
    About Us What's New Publications Topical Index FAQ Center History Offices Studying NASA History NASA History for Kids Site Map Contact Us