Please enable JavaScript in your web browser to use the features of this page.
Work Breakdown Structure
Functions
View Date and History
Whats New
Archives
Revised 4/2009
COVER PAGE
INTRODUCTION
1 : MISSION ANALYSIS
1.1 : Identify Projected Demand for Services
1.2 : Identify Technological Opportunities
1.3 : Identify Projected Supply of Services
1.4 : Mission Needs Analysis and Assessment
1.5 : Initial Requirements Definition
2 : INVESTMENT ANALYSIS
2.1 : Initial Investment Decision
2.1.1 : Planning
2.1.2 : Analysis
2.1.3 : Documentation
2.2 : Final Investment Decision
2.2.1 : Planning
2.2.2 : Analysis
2.2.3 : Documentation
2.3 : Rebaseline Decision
3 : SOLUTION DEVELOPMENT
3.1 : Program Management
3.1.1 : Program Planning, Authorization, Management and Control
3.1.2 : Contract and Grant Management
3.2 : System Engineering
3.2.1 : System Engineering Management
3.2.2 : System Requirements and Definition
3.2.3 : Analysis, Design, and Integration
3.2.4 : Value Engineering
3.2.5 : Supportability, Maintainability, and Reliability Engineering
3.2.6 : Quality Assurance
3.2.7 : Configuration Management
3.2.8 : Human Factors
3.2.9 : Security
3.2.10 : System Safety Engineering and Management
3.2.11 : Other System Engineering Specialties
3.3 : HW/SW Design, Development, Procurement, and Production
3.3.1 : Hardware Design and Development
3.3.2 : Software Design and Development
3.3.3 : HW/SW Integration, Assembly, Test and Checkout
3.3.4 : Production Engineering
3.3.5 : Procurement/Production
3.4 : Physical and Airspace Infrastructure Design and Development
3.4.1 : Facility Planning and Design
3.4.2 : Real Estate
3.4.3 : Physical Infrastructure
3.4.4 : Airspace Redesign
3.5 : Test and Evaluation
3.5.1 : Research and Early Evaluation Test
3.5.2 : Development Test
3.5.3 : Operational Test
3.5.4 : Independent Software Verification and Validation
3.5.5 : Independent Operational Test and Evaluation
3.6 : Data and Documentation
3.7 : Logistics Support
3.7.1 : Logistics Support Planning
3.7.2 : Test and Measurement Equipment Acquisition
3.7.3 : Support and Handling Equipment Acquisition
3.7.4 : Support Facilities Construction/Conversion/Expansion
3.7.5 : Support Equipment Acquisition/Modification
3.7.6 : Support Facilities and Equipment Maintenance
3.7.7 : Initial Spares and Repair Parts Acquisition
3.7.8 : Initial Training
4 : IMPLEMENTATION
4.1 : Program Management
4.1.1 : Program Planning, Authorization, Management and Control
4.1.2 : Contract Management
4.1.3 : Human Resources Planning and Staffing
4.2 : Engineering
4.3 : Environmental and Occupational Safety and Health Compliance
4.4 : Site Selection and Acquisition
4.5 : Construction
4.6 : Site Preparation, Installation, Test, and Checkout
4.7 : Joint Acceptance Inspection/Commissioning/Closeout
4.7.1 : NAS Charting and Aeronautical Information Management
4.8 : Telecommunications
4.9 : Implementation Training
5 : IN-SERVICE MANAGEMENT
5.1 : Preventive Maintenance/Certification
5.1.1 : Preventive Maintenance/Certification
5.1.2 : System Management Office (SMO) Overhead
5.1.3 : FAA Academy Maintenance
5.2 : Corrective Maintenance
5.2.1 : Corrective Maintenance
5.2.2 : System Management Office (SMO) Overhead
5.2.3 : FAA Academy Maintenance
5.3 : Modifications
5.4 : Maintenance Control
5.5 : Technical Teaming
5.5.1 : Airway Transportation System Specialists Technical Teaming
5.5.2 : Air Traffic Control Specialists Technical Teaming
5.5.3 : Other Staff Technical Teaming
5.6 : Watch Standing Coverage
5.7 : Program Support
5.7.1 : Program Planning, Authorization, Management and Control
5.7.2 : Contract Management
5.8 : Logistics
5.8.1 : Supply Support
5.8.2 : Replenishment Spares
5.8.3 : Repair
5.8.4 : Logistics Support Services
5.8.5 : Support Equipment Maintenance
5.8.6 : Technical Data
5.8.7 : Maintenance Support Facilities
5.8.8 : Commercial Depot Logistics Service (CDLS) Contracts
5.9 : In-Service Training
5.9.1 : Airway Transportation System Specialists In-Service Training
5.9.2 : Air Traffic Control Specialists In-Service Training
5.10 : Second Level Engineering
5.10.1 : Program Management and Infrastructure Support
5.10.2 : National Airspace System (NAS) Field Support and Restoration
5.10.3 : Hardware and Software Engineering Support
5.10.4 : Configuration Management
5.10.5 : Process Improvement
5.10.6 : Quality Assurance
5.10.7 : Information System Security
5.10.8 : Recurring NAS System Costs
5.10.9 : Software Licenses
5.11 : Infrastructure Support
5.11.1 : Hazardous Materials Handling
5.11.2 : Utilities, Building and Grounds Upkeep and Maintenance
5.11.3 : Telecommunications
5.11.4 : Building and Infrastructure Modernization and Improvements
5.11.5 : Real Estate Management
5.11.6 : Physical Security
5.12 : NAS Charting and Aeronautical Information Management
5.13 : System Performance Assessment
5.14 : System Operations
5.15 : Travel To And From Sites
6 : DISPOSITION
6.1 : Program Management
6.2 : Decommissioning
6.3 : Engineering
6.4 : Environmental Activities
6.5 : Dismantle/Removal
6.6 : Site Restoration/Closeout
Please enable JavaScript in your web browser to use the features of this page.