|
|
|
|
Windows Media
9.6 MB
Download Time:
:39
Cable/DSL
24:02 56K Dialup
|
|
MPG4 Movie
14.4 MB
Download Time:
:58
Cable/DSL
36:03 56K Dialup |
|
|
|
|
TITLE: |
Krakatau Setup |
CATEGORY: |
Subcritical Experiment |
DESCRIPTION: |
This video clip shows the process of lowering the Krakatau subcritical experiment package underground at the U1a facility, connecting it to the diagnostics rack and lowering the experimental package into a hole drilled into the floor of the tunnel at U1a. Marbles, gravel and grout (cement) are backfilled into the hole to absorb the shock from the high explosives and seal radiation in the floor of the tunnel. |
FACT SHEET: |
|
DATE: |
February 2006 |
FILM NUMBER: |
|
DURATION: |
7:54 |
CREDIT: |
National Nuclear Security Administration /
Nevada Site Office |
HELP GUIDE: |
Viewing Instructions |
|