Potholes Reservoir Resource Management Plan |
||
![]() |
||
Overview |
The process of creating the resource management plan (RMP) was started in 1996 and consisted of a detailed planning process culminating in the preparation of an RMP document in August 2002. The RMP is Reclamation’s blueprint for the future use, management, and site development of the reservoir over the next ten years. Additional questions can be addressed to Jim Blanchard at the Ephrata Field Office, jblanchard@pn.usbr.gov, (509) 754-0226, or fax (509) 754-0239. |
|
![]() |
||
Instructions for File Download | In order to view these PDF files, you must have Adobe Acrobat Reader software loaded on your computer. Download software from www.adobe.com. All text files provided are formatted for double sided printing. The figure files are listed individually to ensure print quality while minimizing download size. |
|
![]() |
||
Download Documents |
01/2002 |
Record of Decision 9 pages / 6.5 mb |
12/2001 | ||
08/2002 | Resource Management Plan (239 pages / 9 mb) |
|
Cover, Table of Contents (7 pages / 204 kb) | ||
Chapter 1 Introduction (7 pages / 350 kb) | ||
Chapter 2 Agency Coordination and Standards (50 kb) |
||
Chapter 3 Existing Conditions (37 pages / 1.6 mb) |
||
Chapter 4 Resource Goals and Objectives (55 pages / 1.9 mb) |
||
Chapter 5 Land Management Recommendations (4.9 mb) |
||
Chapter 6 Monitoring (10 pages / 38 kb) |
||
Chapter 7 References (7 pages 25 kb) |
||
Appendix A Draft Coordination Report (28 pages / 113 kb) |
||
Appendix B Historic Vegetation (30 pages / 93 kb) |
||
Appendix C Environmental Committments (3 pages / 19 kb) |
||
![]() |
||
Last Update: May 15, 2007 8:44 AM |