![Upper Colorado Region header image Upper Colorado Region header image](images/ucro-title.gif)
![photo: Flaming Gorge Dam Counter-Terrorism Exercise photo: Flaming Gorge Dam Counter-Terrorism Exercise](feature/images/FGexercise.jpg)
at Flaming Gorge Dam
Reclamation hosted and participated in a counter-terrorism training exercise at Flaming Gorge Dam with federal, state, and county emergency response law enforcement. Learn More
![photo: A-LP First pump of water dicharge into disipation structure photo: A-LP First pump of water dicharge into disipation structure](https://webarchive.library.unt.edu/eot2008/20090512222138im_/http://www.usbr.gov/uc/feature/animas/images/ALP08535-firstpumpDischarge.jpg)
First Water Pumped to Reservoir
The first water was pumped from the Animas River to Lake Nighthorse as the Durango Pumping Plant begins operation. Learn More
![photo: Members of the 511th Engineer Dive Company photo:Members of the 511th Engineer Dive Company](https://webarchive.library.unt.edu/eot2008/20090512222138im_/http://www.usbr.gov/uc/feature/albq/divers/images/image1.jpg)
Team for Work at Nambe Falls Dam
Reclamation contracted with the U.S. Army Dive Company to perform work on the Nambe Falls Dam trash rack. Learn More
![Quick Links Graphic](images/quicklinks.gif)
General
- Adaptive Management Program
- Animas - La Plata Project
- Aquatic Invaders -Zebra/Quagga
- A.V. Watkins Dam Repairs
- Brief Reclamation History
- CAST For Kids
- Colorado River Basin Salinity Control
- Colorado River Storage Project
- Commercial Film & Photography Permit
- Consumptive Uses/Losses Report
- Drought - Upper Colorado River Basin
- Employment Opportunities - UC Region
- Environmental Compliance Info
- Glen Canyon High-Flow Experiment
- Glen Canyon Long Term Experim. Plan
- Glossary
- Huntington-Cleveland Salinity Ctrl. Proj.
- Hydropower - Reclamation-wide site
- Lake Mgmt. Strategies, Powell - Mead
- Links
- Managing for Excellence
- Middle Rio Grande Activities
- News Releases - UC Region
- Recreation.gov
- Speeches
- Water for America
- Water Users Roster
American Recovery and
Reinvestment Act Water & Reservoir Info
- Aspinall Unit Status Summary
- Blue Mesa Reservoir
- Crystal Reservoir
- Elephant Butte Reservoir
- Flaming Gorge Reservoir
- Flaming Gorge Status Summary
- Fontenelle Reservoir
- Fontenelle Status Summary
- Historic Reservoir Data
- Lake Powell
- Lake Powell Status Summary
- Navajo Reservoir
- Navajo Status Summary
- Snowpack
![photo: Ridges Basin Dam completed photo: Ridges Basin Dam completed](images/ALP6579.jpg)
Animas-La Plata Project: Ridges Basin Dam completed
![photo: fly fishing - Provo River, Utah](images/flyfish.jpg)
Fly fishing - Provo River, Utah
![Flaming Gorge Dam photo: Flaming Gorge Dam](images/fgorge.jpg)
Flaming Gorge Dam
![](images/recentdocs2.gif)
![](images/red-menuBullet.gif)
![](images/red-menuBullet.gif)
Water Intake Structure
![](images/red-menuBullet.gif)
![](images/red-menuBullet.gif)
![](images/red-menuBullet.gif)
![](images/red-menuBullet.gif)
![](images/red-menuBullet.gif)
![](images/red-menuBullet.gif)
![](images/menu-tan-bottom.gif)
![Recovery.gov image link Recovery.gov image link](images/recovery_logo-150px.jpg)