FACILITIES INSTRUCTIONS, STANDARDS AND
TECHNIQUES (FIST) MANUALS
Reclamation maintains a series of manuals entitled Facilities Instructions, Standards, & Techniques (FIST) which pertain to the operation and maintenance of hydroelectric equipment. Reclamation no longer sells publications, however, most of Reclamation's significant scientific, technical, and engineering works are available from the National Technical Information Service (NTIS). Information regarding availability and pricing may be obtained by contacting NTIS at the following address:
United States Department of CommerceA current listing of the FIST manuals is below. The documents require Adobe's Acrobat Reader to view. If you do not have a copy of Adobe Acrobat Reader, it is available at Adobe's site: http://www.adobe.com.
National Technical Information Service
5285 Port Royal Road
Springfield, VA 22161
(703) 487-4650 or
(800) 553-6847
Internet: http://www.ntis.gov/
Miscellaneous Electrical Volumes I, May 1991 ( Click here for FIST Volumes 3-11 through 3-15 ) |
||
3-11 | Generator Thrust Bearing Insulation and Oil Film Resistance | |
3-12 | Correcting the Ratio and Phase Angle Characteristics of Bushing Current Transformers | |
3-13 | An Electrical Method of Moving a Generator Rotor | |
3-14 | Commutator and Collector Ring Performance | |
3-15 | Fiber Optic Arc Detector | |
Maintenance of Power Circuit Breakers & Power Circuit Breaker Problems, January 1992 |
||
3-16 | Maintenance of Power Circuit Breakers | |
3-17 | Power Circuit Breaker Problems | |
Miscellaneous Electrical Volumes II, June 1991 (Click here for FIST Volumes 3-18 through 3-28 ) |
||
3-18 | Replacing Glaze Burned Insulators | |
3-19 | Correction for Faulty Operation of Mercury Switches | |
3-20 | General Guide for Checkout of New Electrical Facilities | |
3-21 | General Electric Company Relays | |
3-22 | General Electric Type EJ-0-1 and EF-1 Fuse Problems | |
3-23 | Instrument Transformer Secondary Grounding | |
3-24 | Overload Protection of Three Phase Motors | |
3-25 | Doble Testing of Coupling Capacitors | |
3-26 | Failures of Pedestal-Type (Pin and Cap) Insulators | |
3-27 | Spare Parts for Westinghouse Outdoor Switches | |
3-28 | Installation of Connectors on PMG Wiring |
3-29 | Energized Facility Maintenance, May 1990 | |
3-30 | Transformer Maintenance, October 2000 | |
3-31 | Transformer Diagnostics, June 2003 | |
3-32 | Transformer Fire Protection, January 2005 |
Volume 4 - General Maintenance | ||
4-1 | Maintenance Schedules and Records | |
4-1A | Maintenance Scheduling for Mechanical Equipment, September 1995 | |
4-1B | Maintenance Scheduling for Electrical Equipment, December 2005 | |
4-2 | Power O&M Codes for ADP, December 1989 |
Miscellaneous General Maintenance Volumes I, September 1992 | ||
4-3 | Economic Analysis of Maintenance Problems | |
4-4 | Test Equipment Available for Loan from the Denver Office | |
4-5 | Use of Cathodic Protection of Buried and Submerged Metals in Corrosion Prevention in Electrical Power Installations | |
Miscellaneous General Maintenance Volumes II, August 1992 | ||
4-6 | Wood Pole Maintenance | |
4-7 | Sagging Transmission Line Conductors | |
4-8 | Herbicides Available for Treating Soil for Total Vegetation Control | |
4-9 | Oil-Absorbent Materials | |
4-10 | Bolt Anchor Sulfaset | |
4-11 | Dam and Powerplant Sump Water Level Indicator | |
4-12 | Diesel Oil Sampling and Rotation Program |
Volume 5 - Safety | ||
5-1 | Personal Protective Grounding for Electric Power Facilities and Power Lines, July 2005 | |
5-2 | Firefighting and Fire Prevention, February 1992 |
Miscellaneous Safety Volumes, February 1992 ( Click here for FIST 5-3 through 5-8 and 5-10 and 5-11 ) |
|||
5-3 | High Pressure Systems | ||
5-4 | Chlorine Gas System Safety Program | ||
5-5 | Handling Failed Capacitor Cells | ||
5-6 | Inspection and Maintenance of PCB-Containing Equipment | ||
5-7 | PCB Transformer Protection and Marking Requirements | ||
5-8 | Safety Procedures for High-Voltage Testing |
5-9 | Management and Safe Handling Procedures for Sulfur Hexafluoride (SF6) Gas, March 2004 |
5-10 | Voltage Hazard Associated with Use of Circuit Breakers Having Grading Capacitors |
5-11 | Potential Hazard from Messwandler-Bau Instrument Transformers |
5-12 | CO2 Systems - Operations and Maitenance, May2005 | |
5-13 | Fault Protection for Portable and Vehicle-mounted Generators and Welders, December 1997 |
|
Volume 6 - Facility Management | ||
6-1 | ||
6-2 | Conduct of Power Maintenance , March 2006 |
Revised April 21, 2006 Hydropower Site Map Help