Lake Cascade Resource Management Plan |
|||
Overview |
The process of creating the resource management plan (RMP) was started in January 1999 and consisted of a detailed planning process, which culminated in the preparation of the RMP document in February 2002. The RMP is Reclamation’s blueprint for the future use, management, and site development of the reservoir over the next ten years.
For a hard copy of the document email Vicki Kellerman at vkellerman@pn.usbr.gov or call (208) 378-5326. |
||
Instructions for File Download | In order to view the files, you must have Adobe Acrobat Reader software loaded on your computer. Download software from www.adobe.com. All text files provided are formatted for double-sided printing. The figure files are listed individually to ensure print quality while minimizing download size. These files, both text and figures, are supplied at print-level quality. |
||
Resource Managment Plan
|
Full Document (large file) | 15.02 mb | |
Cover, TOC, Acronyms | 3.07 mb | ||
493 kb | |||
Chapter 2: Exisitng Conditions | 6.96 mb | ||
Chapter 3: Existing Land Use and Management | 2.13 mb | ||
Chapter 4: RMP Planning Process | 477 kb | ||
Chapter 5: Resource Management | 1.55 mb | ||
Chapter 6: Implementation Program | 134 kb | ||
Chapter 7: Glossary of Terms | 59 kb | ||
Chapter 8: Bibliography | 55 kb | ||
Appendices | 388 kb | ||
Environmental Assessment |
2.96 mb | ||
Chapters 3 & 4 | 432 kb | ||
Chapters 5-9 and Appendices A-C | 199 kb | ||
Appendix D | 3.68 mb | ||
Last Update: April 13, 2007 4:00 PM |