Facilities in Operation
Storage Dams |
3 |
Diversion Dams |
2 |
Canals |
140 mi |
Laterals |
564 mi |
Drains |
673 mi |
Powerplants |
4 |
Transmission Lines |
163.4 mi |
Substations |
4 |
|
Storage Facilities
Buffalo Bill Dam Deaver Dam Ralston Dam
Diversion Facilities
Carriage Facilities
Shoshone Canyon Conduit
Shoshone Canyon Conduit Heart Mountain Powerplant |
Location: |
From Buffalo Bill Dam east along south side of Shoshone River Canyon to Heart Mountain Powerplant. |
Construction period: |
1935-1940 |
Description: |
Consists principally of three tunnel sections connected by concrete conduit sections. |
Length |
2.8 mi |
Capacity |
1,200 cfs |
Cross section: |
Horseshoe |
Diameter |
12 ft |
Lining |
Concrete |
|
Shoshone River Siphon - Heart Mountain Canal
Location: |
Across the Shoshone River from end of Shoshone Canyon Conduit, near Heart Mountain Powerplant. |
Construction period: |
1939 |
Description: |
|
Concrete siphon barrel |
793 ft |
Steel siphon barrel |
847 ft |
Total Length |
1,640 ft |
Diameter |
123 in |
Capacity |
915 cfs |
|
Heart Mountain Canal
Location: |
From Heart Mountain Powerplant generally north. |
Construction period: |
1937-1947 |
Length |
26.2 mi |
Diversion capacity |
915 cfs |
Typical section in earth: |
|
Bottom width |
32 ft |
Side slopes |
1.5:1 |
Water depth |
8.4 ft |
Typical section, concrete lined: |
|
Bottom width |
8 ft |
Side slopes |
1.25:1 |
Water depth |
7.51 ft |
Lining thickness |
4 in |
|
Garland Canal
Location: |
From lower end of Corbett Tunnel 3.25 miles below Corbett Dam on the Shoshone River about 6 miles northeast of Cody, Wyoming, generally northeast to vicinity of Garland, Wyoming. |
Construction period: |
1906-1908 |
Length1 |
18.5 mi |
Diversion capacity |
1,000 cfs |
Typical section in earth: |
|
Bottom width |
40 ft |
Side slopes |
2:1 |
Water depth |
6.5 ft |
|
1 Length does not include the Corbett Tunnel length. |
Corbett Tunnel - Garland Canal
Location: |
From Corbett Dam north. |
Construction period: |
1905-1907 |
Length |
17,357 ft |
Capacity |
1,000 cfs |
Cross section: |
Rectangular arched roof |
Height |
129 in |
Width |
138 in |
Lining: |
Concrete |
Lining thickness |
9 in |
|
Frannie Canal
Location: |
From Garland Canal near Ralston, Wyoming, generally northeast to vicinity of Frannie, Wyoming. |
Construction period: |
1917-1920 |
Length |
44 mi |
Diversion capacity |
550 cfs |
Typical section in earth: |
|
Bottom width |
36 ft |
Side slopes |
2:1 |
Water depth |
4.5 ft |
|
Deaver Canal
Location: |
From mile 14 on Frannie Canal, about 6 miles northeast of Powell, Wyoming, generally northeast past Deaver Reservoir. |
Construction period: |
1916-1917 |
Length |
24 mi |
Diversion capacity |
194 cfs |
Typical section in earth: |
|
Bottom width |
20 ft |
Side slopes |
1.5:1 |
Water depth |
3.6 ft |
|
Willwood Canal
Location: |
From Willwood Diversion Dam on the Shoshone River about 5 mi southwest of Ralston, Wyoming, generally east to a point about 4.5 mi south of Penrose. |
Construction period: |
1924-1927 |
Length |
27.5 mi |
Diversion capacity |
320 cfs |
Typical section in earth: |
|
Bottom width |
10 ft |
Side slopes |
1.5:1 |
Water depth |
5 ft |
Typical section in rock: |
|
Bottom width |
10 ft |
Side slopes |
0.75:1 |
Water depth |
5 ft |
|
Power Facilities
Buffalo Bill Powerplant Heart Mountain Powerplant Shoshone Powerplant Spirit Mountain Powerplant
|