|
Hydraulics
Normal Water Surface Elev: ................. 4420 ft
Hydraulic Height: .................................... 92 ft
Service Spillway Type:
Uncontrolled Crest ................................Yes
Morning-Glory ........................................... No
Crest Length .......................................... xx ft
Gated ....................................................... No
Capacity at Elev: 4420 ft, 52,000 cfs
Auxiliary Spillway ......................................... No
Capacity at Elev. .................................. 0 cfs
Outlet Works Capacity at
Elevation xxxx.0 ft., ......................... x,xxx cfs |
|
Hydrology
Drainage Area: ................................. 2,145 sq mi
Hydrometeorological Report HMR
Flood Type: ...............................General
Storm Duration: ....................................... hrs
Probable Maximum Flood (PMF) Report:
Peak Inflow: .................................. cfs
Inflow Volume: ........................ acre-ft
Flow Duration: ......................................0 days
PMF Routing MWS Elev.: ................. x.0 ft
Initial Routing Elev: ............................ x.0 ft
Study Date: |
|
|