Vermont Yankee -
Docket Nos. 050-00271
NRC Action Number(s) and
Facility Name |
Action Type
(Severity) &
Civil Penalty
(if any) |
Date
Issued |
Description |
EA-06-253
Vermont Yankee |
NOV
(White) |
12/20/2006 |
On December 20, 2006, a Notice of Violation associated with a White
Significance Determination Finding was issued involving the shipment
of a package containing radioactive material via an exclusive-use
open transport vehicle. The violation was cited against 10 CFR 71.5, "Transportation
of Licensed Material," and DOT regulation 49 CFR 173.441(a)
because the package containing the radioactive material was not designed
and prepared to assure, under conditions normally incident to transportation,
that the radiation level on any point on the external surface of
the package would not exceed 200 millirem per hour. |
EA-04-174
Vermont Yankee |
NOV
(SL III) |
06/22/2005 |
On June 22, 2005, a Notice of Violation was issued for a Severity
Level III violation of
10 CFR 74.19 (a)(1), (b), and (c) [formerly 10 CFR 70.51 (b), (c)
and (d)], citing the licensee’s failure, between January 1980
and July 13, 2004, to ensure that two irradiated fuel rods were in
the spent fuel pool as detailed in the licensee’s inventory.
The licensee also failed to conduct adequate inventories of the location
of the two fuel pieces. |
EA-04-173
Vermont Yankee |
NOV
(White) |
02/02/2005 |
On February 2, 2005, a Notice of Violation was issued for a violation
associated with a White SDP finding involving the failure to issue
tone alert radios to the entire populace within the emergency planning
zone (EPZ). The violation cited the licensee’s failure to follow
its emergency plan to establish the means to provide early notification
and clear instruction to the populace within the plume exposure pathway
EPZ. |
EA-00-165 Vermont Yankee |
NOV
(SL III) |
09/18/2000 |
A Notice of Violation for a Severity Level III violation was issued
September 18, 2000. The action was based on a former mechanical maintenance
manager deliberately causing a violation of the procedure implementing
the requirement to control contracted services during the 1998 refueling
outage. |
EA-97-531
Vermont Yankee |
NOVCP
(SL III)
$ 55,000 |
04/14/1998 |
Violations of design control, corrective actions, and reporting. |
EA-96-210 Vermont Yankee |
NOVCP
(SL III)
$ 50,000 |
08/28/1996 |
Failure to analyze ECCS equipment to be free from single failure
criterion. |
Vogtle 1 & 2 - Docket
Nos. 050-00424; 050-00425
NRC Action Number(s) and
Facility Name |
Action Type
(Severity) &
Civil Penalty
(if any) |
Date
Issued |
Description |
EA-06-132
Vogtle 1 & 2 |
NOV
(SL III) |
09/18/2006 |
On September 18, 2006, a Notice of Violation was issued for a violation
associated with a WHITE significance determination process finding.
The violation cited emergency preparedness planning standards 10
CFR 50.47(b)(14) and 10 CFR 50.47(b)(4) as well as the requirements
of 10 CFR Part 50, Appendix E, Section IV.F.2.g, because the licensee
failed to identify weak or deficient areas during its formal critique
of an emergency preparedness exercise. Specifically, the exercise
critique failed to identify that the Emergency Director’s Site
Area Emergency event classification was an incorrect classification. |
EA-96-479
Vogtle 1 & 2 |
NOV
(SL III) |
12/31/1996 |
Inoperable SI pump and a degraded containment spray pump due to
inadequate maintenance procedures. |
EA-95-171
Vogtle 1 & 2
|
NOV
(SL I) |
05/29/1996 |
Discrimination against former senior manager. |
|