skip navigation links 
 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
RPV Bottom Head Issues
Correspondence Related to NRC Bulletin 2003-02
Images
News and Correspondence
Public Meetings
References

News and Correspondence

This page lists, in chronological order, general news and correspondence on RPV Bottom Head Issues.

Some links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS), and others are to documents in Adobe Portable Document Format (PDF). ADAMS documents are provided in either PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page. If you have questions about search techniques or problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Date Description
10/15/03 Supplement to LER 03-003, Bottom Mounted Instrumentation Penetration Indications
09/08/03 NRC Special Inspection Team Report 050000498/2003008 and 05000499/2003008 and Exercise of Enforcement Discretion
08/21/03 June 12, 2003 Telecon Summary
08/21/03

June 19, 2003 Telecon Summary

08/21/03 Bulletin 2003-02: Leackage from Reactor Pressure Vessel Lower Head penetrations and Reactor Coolant Pressure Boundary Integrity
08/18/03 STP Unit 1 Reactor Pressure Vessel Head Inspection Results
08/15/03 NRC Approval - Request for Relief, RR-ENG-2-32, From ASME Code Requirements for Approval of Half-Nozzle Repair/Replacement for BMI Penetrations
08/13/03 NRC Information Notice 2003-11: Leakage Found on Bottom Mounted Instrumentation Nozzles
08/08/03 Staff observation/assessment of half-nozzle repair design calculations
08/08/03 July 10, 2003 Telecon Summary
08/08/03 June 26, 2003 Telecon Summary
08/08/03 May 22, 2003 Telecon Summary
08/01/03 Request for Relief, RR-ENG-2-35, From the Requirements of the ASME Boiler and Pressure Vessel Code Concerning Use of an Electro-Discharge Machining (EDM) Process (TAC NO. MB9655)
08/01/03 Relief Request RR-ENG-2-33, Alternative Flaw Characterization Criteria for Two Bottom-Mounted Instrument Penetration Welds (TAC NO. MB9727)
07/31/03 NRC Special Inspection Team Review and NRC Staff Evaluation of South Texas Project, Unit 1, Reactor Pressure Vessel Bottom-Mounted Instrumentation Penetration Leackage Investigation and Repair Activities
07/31/03 Summary of Exit Meeting for Special Inspection of Bottom Mounted Instrumentation Nozzle Leakage in South Texas Project, Unit (NRC Inspection Report 050000498/2003008)
07/30/03 Request for Withholding Information from Public Disclosure Per Section 2.790 of Title 10 of the Code of Federal Regulations Concerning Bottom Mounted Instrumentation Forced Outage (TAC No. MB8435)
07/23/03 Revised Summary of ASME Code Calculations Performed for Repair of Bottom Mounted Instrumentation Penetrations
07/17/03 Supplemental Response to Request for Additional Information Regarding Request for Alternative RR-ENG-2-32 (TAC No. MB9696)
07/17/03 Confirmation of 7/11 letter Updated Commitments to Investigate and Repair Bottom Mounted Instrumentation Penetration Indications
07/15/03 May 29, 2003 Telecon Summary
07/15/03 May 20, 2003 Telecon Summary
07/11/03 Updated Commitment to Investigate and Repair Bottom Mounted Instrumentation Penetration Indications.
07/03/03 Response to Request for Additional Information Regarding Request for Alternative RR-ENG-2-32 (TAC No. MB9696)
07/02/03 South Texas Project Unit 1 Docket No. STN 50498 Summary of ASME Code Calculations Performed for Repair of Bottom Mounted Instrumentation Penetrations
07/01/03 Revised Response to Request for Additional Information Regarding Request for Alternatives RR-ENG-2-35
06/27/03 NRC Approval - Request for Relief, RR-EING-2-30, Revision 2, From ASME Code Requirements for Approval of ASME Section XI Code Case N-516-2 for Underwater Welding of Core Barrel Locking Tab
06/26/03 Response to Request for Additional Information Regarding Request for Alternatives RR-ENG-2-35
06/25/03 NRC Approval - Request for Relief, RR-ENG-2-31, From ASME Code Requirements for Approval of ASME Section XI Code Cases N-2143-1 and 2143-1 for the Second 10-Year Inspection Interval
06/25/03 Request for Relief from ASME Section XI Requirements Associated with Characterizing Flaws in Bottom Mounted Instrumentation Penetration Welds (Relief Request RR-ENG-2-33)
06/19/03 Request for Alternative to ASME Section XI Requirements Associated with Half-Nozzle Repair/Replacement for Bottom Mounted Instrument Penetrations (Relief Request RR-ENG-2-32)
06/17/03 May 15, 2003 Telecon Summary
06/17/03 May 8, 2003 Telecon Summary
06/13/03 Request for Alternatives to ASME SEction XI Requirements Associated eith Mechanical Processing of Thermally cut Surfaces (Relief Request RR-ENG-2-35)
06/11/03 Licensee Event Report 03-003, Bottom Mounted Instrumentation Penetration Indications
06/10/03 Relief Request RR-ENG-30, Rev. 2
06/02/03 Revised Request for Approval of ASME Section XI Code Case N-516-2 for Underwater Welding of Core Barrel Locking Tab (Relief Request RR-ENG-2-30)
06/02/03 Bottom Mounted Instrumentation Forced Outage Confidential Information
05/28/03 NRC Press Release 03-069 - NRC to Hold Public Meeting June 5 on Reactor Vessel Penetration Leakage at South Texas Project
05/27/03 April 17, 2003 - Telephone Conversation Summary
05/23/03 April 22, 2003 - Telephone Conversation Summary
05/22/03 South Texas Press Release - STP releases preliminary inspection results
05/20/03 Morning Report for May 20, 2003
05/15/03 Request for Approval of ASME Section IX Code Cases 2142-1 and 2143-1 for the Second Ten-Year Inspection Interval (Relief Request RR-ENG-2-31)
05/12/03 Responses to NRC Questions regarding Bottom Mounted Instrumentation Penetration Indications
05/08/03 Request for Approval of ASME Section XI Code Case N-516-2 for the Second Ten-Year Inservice Inspection Interval (Relief Request RR-ENG-2-30)
05/08/03 April 24, 2003 - Telephone Conversation Summary
05/05/03 NRC Press Release IV-03-021 - NRC to Conduct Special Inspection at South Texas Project Unit 1
05/05/03 Charter for the NRC Special Inspection Team at South Texas Project - Review of Licensee Actions Related to Reactor Vessel Bottom Mounted Instrumentation Penetration Leakage
04/28/03 NRC Press Release 03-051: NRC to hold Public Meeting May 1 on Reactor Vessel Penetration Leakage at South Texas Project
04/24/03 Commitment to Investigate and Repair Bottom Mounted Instrumentation Penetration Indications
04/18/03 NRC Preliminary Notification PNO-IV-03-022: Reactor Vessel Bottom Head Penetration Leakage
04/14/03 NRC Event Report 39754
02/13/03 Response to RAI on Bulletin 2002-01
11/25/02 Bulletin 2002-01 RAI Letter
09/11/02 30 Day Response to Bulletin 2002-02
05/16/02 60 Day Response to Bulletin 2002-01
04/02/02 15 Day Response to Bulletin 2002-01
03/18/02 NRC Bulletin 2002-01: Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity
08/29/01 15 Day Response to Bulletin 2001-01
03/09/89 South Texas Response to GL 88-05
05/31/88 South Texas Response to GL 88-05

(To top of page)



Privacy Policy | Site Disclaimer
Tuesday, February 13, 2007