Home > Nuclear Materials > Fuel Cycle Facilities > New Fuel Facility Licensing
> Mixed Oxide Fuel Fabrication Facility Licensing > MOX Construction Inspection Program - Pre-Operational Inspection Procedures
MOX Fuel Fabrication Facility Inspection Program Construction Phase - Pre-Operational Inspection Procedures
The following links on this page are to documents in our Agencywide
Documents Access and Management System (ADAMS). ADAMS documents are provided
in either Adobe Portable Document Format (PDF) or Tagged Image File Format
(TIFF).
To obtain free viewers for displaying these formats, see our Plugins,
Viewers, and Other Tools. If you have problems
with viewing or printing documents from ADAMS, please contact the Public
Document
Room staff.
The procedures list was obtained from Inspection Manual Chapter 2630, "Mixed Oxide Fuel Fabrication Facility Construction Inspection Program"
Pre-Operational Inspection Procedures
IP Number |
Description |
IP 88030 |
Radiation Protection |
IP 86740 |
Inspection of Transportation Activities |
IP 88005 |
Management Organization and Controls |
IP 88010 |
Operator Training and Retraining |
IP 88015 |
Nuclear Criticality Safety Program |
IP 88016 |
Nuclear Criticality Evaluations and Analyses |
IP 88017 |
Criticality Alarm Systems |
IP 88020 |
Operational Safety |
IP 88025 |
Maintenance and Surveillance Testing |
IP 88035 |
Radioactive Waste Management |
IP 88045 |
Environmental Protection and Effluent Control |
IP 88050 |
Emergency Preparedness |
IP 88051 |
Evaluation of Exercise and Drills |
IP 88055 |
Fire Protection |
IP 88070 |
Permanent Plant Modifications |
IP 88071 |
Configuration Management |
|