Construction Application
* NRC recommends that users view the document from
ADAMS because the files are large. The reliability of downloading PDF files
using modems cannot be assured.
The following links on this page are to documents in Adobe Portable Document
Format (PDF). See our Plugins, Viewers, and
Other Tools page for more information. For successful viewing of PDF documents on our site please be sure to use the latest version of Adobe.
Date |
Correspondence and Other Information |
02/09/05 |
Duke Cogema Stone & Webster Mixed Oxide (MOX) Fuel Fabrication Facility Construction Authorization Request Page Changes |
01/27/05 |
Duke Cogema Stone & Webster Mixed Oxide (MOX) Fuel Fabrication Facility Construction Authorization Request Page Changes |
11/30/04 |
November
2004 Monthly Open Item Status Report |
09/08/04 |
Request for Additional Information - Mixed Oxide Fuel Fabrication Facility Revised Construction Authorization Request |
06/10/04 |
Change Pages for the Mixed Oxide Fuel Fabrication Facility Construction Authorization Request |
08/22/03 |
Schedule for Issuing the Final Environmental Impact Statement and the Final Safety Evaluation Report for the Mixed Oxide Fuel Fabrication Facility |
07/28/03 |
Mixed Oxide Fuel Fabrication Facility, Construction Authorization Request Change Pages & Revised Response to AP-03 |
04/10/03 |
Mixed Oxide (MOX) Fuel Fabrication Facility Construction Authorization Request Change Pages |
04/01/03 |
Mixed Oxide (MOX) Fuel Fabrication Facility Construction Authorization Request Change Pages |
02/18/03 |
Responses to Financial Qualification, Fire Safety, Chemical Safety, Aqueous Processing, Material Processing and Ventilation Open Items/Additional NRC Questions on Construction Authorization Request (CAR) Revision |
10/31/02 |
Mixed Oxide Fuel Fabrication Facility Construction Authorization Request Revision Cover letter Table of Contents through Figure 1.3.2-2 Section 1.3.3 through Table 1.3.5.1 Figures page: 1.3.5-51 through Figure 4-2 Section 5 through Table 5.5-27 Section 5.6 through Table 5A-14 Section 6 through Figure 7-25 Section 8 through Figure 10-11 Section 11.0 through Section 11.2.7 Figure 11.2-1 through Section 11.3.7 Table11.3-1 through Figure 11.4-14 Section 11.5 through Figure 11.9-33 Sections 11.10 through Section 15.8.9 |
03/08/02 |
DCS Construction Authorization Request (CAR), Clarification
of Response to NRC Request for Additional Information |
02/11/02 |
DCS CAR, Clarification
of Response to NRC Request for Additional Information |
01/07/02 |
DCS CAR, Clarification
of Response to NRC Request for Additional Information |
12/05/01 |
DCS CAR, Clarification
of Response to NRC Request for Additional Information |
11/02/01 |
DCS CAR, Clarification
of Response to NRC Request for Additional Information |
08/31/01 |
DCS CAR, Response to NRC Request for Additional Information
Parts 1,
2, 3,
and 4 |
08/31/01 |
DCS MOX Fuel Fabrication Facility
Financial Information |
08/10/01 |
DCS MOX Fuel Fabrication Facility
Geotechnical Report |
06/21/01 |
Mixed Oxide Fuel Fabrication
Facility Construction Application Authorization Request - Request for
Additional Information |
03/28/01 |
MOX Construction Application
Acceptance Letter |
12/15/00 |
DCS
Report on choice of MOX Fuel Fabrication Facility Process Glovebox Window
Material |
|