File Name |
Date |
Description |
BL-77-08 |
12/28/1977 |
Assurance of Safety and Safeguards During an Emergency - Locking Systems
|
BL-77-07 |
12/19/1977 |
Containment Electrical Penetration Assemblies at Nuclear Power Plants
under Construction |
BL-77-06 |
11/22/1977 |
Potential Problems with Containment Electrical Penetration Assemblies
|
BL-77-05a |
11/14/1977 |
Electrical Connector Assemblies |
BL-77-05 |
11/08/1977 |
Electrical Connector Assemblies |
BL-77-04 |
11/04/1977 |
Calculational Error Affecting ...Performance of a System for Controlling
pH of Containment Sump Water Following a LOCA |
BL-77-03 |
09/12/1977 |
On-Line Testing of the Westinghouse W Solid State Protection System (SSPS)
|
BL-77-02 |
09/12/1977 |
Potential Failure Mechanism in Certain Westinghouse (W) AR
Relays with Latch Attachments |
BL-77-01 |
04/29/1977 |
Pneumatic Time Delay Relay Setpoint Drift |