                                UNITED STATES
                        NUCLEAR REGULATORY COMMISSION
                    OFFICE OF INSPECTION AND ENFORCEMENT
                           WASHINGTON, D.C. 20555 

                              November 20, 1979

                                                  IE Bulletin No. 79-26 

BORON LOSS FROM BWR CONTROL BLADES 

Description of Circumstances: 

The General Electric Company (GE) has informed us of a failure mode for 
control blades which can cause a loss of boron poison material. Hot cell 
examinations of both foreign and domestic blades have revealed cracks near 
the upper end of stainless steel tubing and loss of boron from the tubes. 
The cracks and boron loss have so far been confined to locations in the 
poison tubes with more than 50 percent Boron-10 (B10) local depletion. 
Observed crack sizes range from a quarter to a half inch in length and from 
one to two mils in width. 

GE has postulated that the cracking is due to stress corrosion induced by 
solidification of boron carbide (B4C) particles and swelling of the 
compacted B4C as helium and lithium concentrations grow. Once primary 
coolant penetrates the cladding (i.e., the cracking has progressed through 
the cladding wall and the helium-lithium pressures are sufficient to open 
the crack), boron is leached out of the tube at locations with more than 50 
percent B10 local depletion (local depletion is considered to be twice the 
average depletion). It was further found with similar cracking but with less
than 50 percent local depletion of B10, that leaching did not occur even 
though primary coolant had penetrated the cladding. 

The cracking and boron loss shorten the design life of the control blade. 
According to the GE criteria the end of design life is reached when the 
reactivity worth of the blade is reduced by 10 percent,, which corresponds 
to 42 percent B10 depletion averaged over the top quarter of the control 
blade. Because of the leaching mechanism, GE has reduced the allowance for 
B10 depletion averaged over the top quarter of the control blade from the 42
percent value to 34 percent. 

The safety significance of boron loss is its impact on shutdown capability 
and scram reactivity. Although shutdown capability is demonstrated by 
shutdown 
.

IE Bulletin No. 79-26                             November 20, 1979  
                                                  Page 2 of 5 

margin tests after refueling, the calculated control blade worths used in 
the tests are based on the assumption that no boron loss has occurred. 
Reduction in scram reactivity due to boron loss could increase the severity 
of Critical Power Ratio (CPR) reductions during the plant transients and 
could increase the consequences of control rod drop accidents. 

Because the locations of limiting Linear Heat Generation Rate (LHGR), CPR, 
and Average Planar LHGR (APLHGR) are not in controlled cells, local power 
limit monitoring is not affected by boron loss. 

GE has evaluated the potential effect of boron loss on shutdown capability, 
CPR reduction and the consequences of control rod drop accidents. GE's 
evaluation is based on the hot cell result that no boron loss is observed 
until 50 percent local B10 depletion is attained. For each B4C tube, 
complete loss of B4C was assumed when the calculated B10 depletion needed 50 
percent locally. For any blade expected to reach a B10 depletion greater 
than 34 percent during a cycle, GE assumed a B10 depletion distribution 
typical of blades at the previously defined end of design life. 

Based on these evaluations GE arrived at the following conclusions: 

(a)  Control rod drop accident consequences are not sufficiently sensitive 
     to small reductions in scram reactivity to be affected by boron loss 
     before the end of design life of the blades involved. 

(b)  If no more than 26 percent of the control blades have experienced a 10 
     percent reduction in projected worth taking boron loss into 
     consideration, there is a negligible effect on transient CPR reduction 
     and MCPR limits. 

(c)  If any control blades have experienced more than 10 percent reduction 
     in projected worth, taking boron loss into consideration, the shutdown 
     margin 
.

IE Bulletin No. 79-26                                  November 20, 1979 
                                                       Page 3 of 5 

should be demonstrated to be at least the sum of the shutdown margin 
required by Technical Specifications plus an increment sufficient to account 
for the potential for boron loss. 

We have examined the bases for GE's conclusions, including the hot cell 
tests and the calculational assumptions.  the preferred action is to replace 
all blades expected to have greater than 34 percent B10 depletion averaged 
over the upper one-fourth of the blade.  However, based on our review we 
believe the relation between boron loss and B10 depletion (i.e., the 
observations to date show that boron loss does not occur until 50 percent 
local of B10) is sufficiently understood to justify BWR operation on an 
interim basis provided the following actions have been taken by licensees. 

Action to be Taken by Licensees: 

For all BWR power reactor facilities with an operating license: 

1.   The operating history of the reactor is to be reviewed to establish a 
     record of the current B10 depletion averaged over the upper one-fourth 
     of the blade for every control blade; the record is to be maintained on
     a continuing basis.  This action is required on all reactors whether 
     shutdown for refueling or operating. 

2.   Identify any control blades predicted to have greater than 34 percent 
     B10 depletion averaged over the upper one-fourth of the blade by the 
     next refueling outage. 

     a.   Describe your plans for replacement of identified control blades. 

     b.   Describe measures which you plan to take justifying continued 
          operations until the next refueling specifically addressing (1) 
          any blade with 
.

IE Bulletin No. 79-26                             November 20 , 1979  
                                                  Page 4 of 5 

          greater than 42 percent depletion averaged over the upper 
          one-fourth of the blade; and (2) the condition where you find 
          greater than 26 percent of the control blades calculated to have 
          greater than 34 percent depletion averaged over the upper 
          one-fourth of the blade. 

3.   At the next cold shutdown or refueling outage, conduct shutdown margin 
     tests to verify that: 

     a.   full withdrawal of any control blade from the cold xenon-free core
          will not result in criticality; and  

     b.   compliance with the shutdown margin requirement in a manner that 
          accommodates the boron loss phenomenon (i.e., by including a plant
          specific increment in the shutdown margin that takes the potential
          loss of boron from control blades identified from evaluation of 
          Item 1 into consideration). 

4.   Perform a destructive examination of the most highly exposed control 
     blade at the end of the next cycle and provide results of the 
     examination within one calendar year after removal of the blade. The 
     results to be reported should include: 

     a.   Tube number or identification. 

     b.   The evaluation of each crack in the tubing. 

     c.   The calculated B10 depletion versus elevation for each tube. 

     d.   The measured B10 loss versus elevation for each tube. 

     e.   The maximum local depletion for -tubes having no cracks. 

     f.   The maximum local depletion for tubes having no loss of boron. 

     Alternately, the results of a destructive examination of a blade of 
     similar fabrication and operational history may be provided within one 
     year of the 
.

IE Bulletin No. 79-26                             November 20, 1979 
                                                  Page 5 of 5 

     date of issuance of this Bulletin.  If the highest local B10 depletion 
     is less than 50 percent, this examination can be deferred until the 
     next refueling. 

5.   Submit within 45 days of the date of issuance of this Bulletin, a 
     written report of the findings as to Items (1) and (2).  for facilities
     in a refueling outage, and all other facilities at their next refueling
     outage, submit the written report on Item (3) within 30 days after 
     plant startup following the outage.  A written report on Item (4) is 
     requested within one year after removal of a control blade for 
     destructive examination. 

Reports should be submitted to the Director of the appropriate NRC Regional 
Office and a copy should be forwarded to the NRC Office of Inspection and 
Enforcement, Division of Reactor Operations Inspection, Washington, D.C. 
20555. 

For all BWR facilities with a construction permit and all other power 
reactor facilities with an operating license or construction permit, this 
Bulletin is for information only no written response is required. 

Approved by GAO B180225 (R0072); clearance expires 7/31/80.  Approval was 
given under a blanket clearance specifically for identified generic 
problems.