Sandia National Laboratories
No document links for 2009
|
- July 31, 2008, Board letter regarding the June 20, 2008, letter from Mr. David McCoy, Executive Director, Citizen Action New Mexico, regarding concerns at Sandia National Laboratories. [HTML] [PDF] [DOC]
|
- October 1, 2007, Department letter transmitting NNSA Central Technical Authority (CTA) guidance to the Office of the Deputy Administrator for Defense Programs regarding expectations that the safety bases and controls be finalized and approved before a Contractor Readiness Assessment begins. [HTML] [PDF] [DOC]
|
No document links for 2006
|
- June 13, 2005, Department letter regarding Corrective Action Plan for the skin contamination incident and Integrated Safety Management at the Sandia National Laboratories Technical Area V. [HTML] [PDF] [DOC]
- March 23, 2005, Department letter regarding implementation of nuclear safety requirements for a nuclear facility located at Sandia National Laboratories, New Mexico. [HTML] [PDF] [DOC]
|
- December 13, 2004, Board letter granting a 30-day extension to respond to Board reporting requirement regarding safety bases at Sandia National Laboratory. [HTML] [PDF] [DOC]
- November 23, 2004, Department letter providing status of NNSA's portion in Commitment 4.1.4 in the 2002-1 implementation plan, Quality Assurance for Safety-Related Software, which requires NNSA personnel assigned to Software Quality Assurance positions to have qualifications in accordance to the Technical Qualification program. [HTML] [PDF] [DOC]
- November 22, 2004, Department letter requesting a 30-day extension to submit a report and brief the Board regarding adequacy of safety basis for nuclear facilities at Sandia National Laboratory. [HTML] [PDF] [DOC]
- November 10, 2004, Department letter regarding implementation of the guidance on Facility Representative training and staffing analysis. [HTML] [PDF] [DOC]
- October 8, 2004, Board letter regarding Integrated Safety Management at Sandia National Laboratories, New Mexico. [HTML] [PDF] [DOC]
- September 27, 2004, Board letter establishing a 90-day reporting requirement regarding issues on the adequacy of safety analyses for facilities at Sandia National Laboratory. [HTML] [PDF] [DOC]
- June 4, 2004, Department letter forwarding the National Nuclear Security Administration (NNSA) Site Office Functions, Responsibilities and Authorities Manuals (FRAMs), and plans for updating safety-related Orders, Standards, and supplemental Directives. [HTML] [PDF] [DOC]
- March 18, 2004, Department letter providing additional information as a follow-up to the Sandia National Laboratory briefing with the Board on its new management team and other areas of interest to the Board. [HTML] [PDF] [DOC]
|
- November 21, 2003, Department letter regarding Commitment 4.2.4 in implementation plan 2002-2, Weapons Laboratory Support of Defense Nuclear Complex, on process for selection, training, mentoring, and succession planning for weapons points-of-contact. [HTML] [PDF] [DOC]
- October 17, 2003, Department letter providing requested clarifications for NNSA sites regarding habitability-related High Efficiency Particulate Air (HEPA) filters. [HTML] [PDF] [DOC]
- September 30, 2003, Department letter reporting closure of Commitment 4.2.3 in implementation plan 2002-2, Weapons Laboratory Support of the Defense Nuclear Complex, which requires identifying the point-of-contact for each weapon system in the defense nuclear complex. [HTML] [PDF] [DOC]
|
- November 12, 2002, Department letter regarding Sandia Underground Reactor Facility (SURF). [HTML] [PDF] [DOC]
- October 3, 2002, Board letter forwarding Recommendation 2002-2, Weapons Laboratory Support of the Defense Nuclear Complex. [HTML] [PDF] [WPD]
- September 3, 2002, Department letter responding to Board reporting requirement dated August 1, 2002 regarding the single point of contact concept relative to W80 enchanced transportation cart (ETC) approval. [HTML] [PDF] [WPD]
- August 1, 2002, Board letter establishing a 30-day reporting requirement regarding the actions being taken to ensure support in the implementation of safety initiatives at the Pantex Plant. [HTML] [PDF] [WPD]
- May 17, 2002, Department letter responding to Board reporting requirement dated March 7, 2002 regarding the design of the Sandia Underground Reactor Facility (SURF). [HTML] [PDF] [WPD]
- March 7, 2002, Board letter establishing a 60-day reporting requirement on the issues outlined in the enclosed staff report on the preliminary design of Sandia Underground Reactor Facility. [HTML] [PDF] [WPD]
|
No document links for 2001
|
No document links for 2000
|
No document links for 1999
No document links for 1998
- January 7, 1997, Staff Review of "Feedback and
Improvement" Activities at Sandia National Laboratories-New Mexico, [HTML] (forwarded February
25, 1997).
- July 31, 1995, Board staff trip report on SNL-NM emergency response exercise
rubble glow (trip conducted May 17, 1995). [PDF]
- June 22, 1994, Board staff trip report on nuclear materials storage at Sandia
National Laboratory. [PDF]
- June 9, 1994, Board staff trip report on low-level waste management and
environmental protection at Sandia National Laboratory. [PDF]
- February 2, 1994, Board staff trip report on Sandia National
Lab/Savannah River Site (trip conducted January 5-7, 1994). [PDF]
|
|
|
|