Skip to ContentSkip to Section MenuSkip to Site Search Control

Presidio Header - The Presidio Trust Section

THE PRESIDIO
The background image for the Presidio "The Presidio Trust" header consists of a field of bright green with the words "The Presidio Trust" in block letters in the lower right corner overlaying a monochrome sketch of a horizontal fern branch.

The Presidio Trust Section Menu

Page Content

Environmental and Planning Documents

Building 100

Crissy Field

Cultural Institutions on the Main Post

Letterman Project

Lodge at the Main Post

Main Parade Ground

Main Post Update

Mountain Lake Enhancement Project

Playing Fields

Presidio Golf Course IPM Program

Presidio Trust Management Plan

Public Health Service Hospital Project

Tennessee Hollow Watershed Project

Thornburgh-West Letterman Project

Trails and Bikeways Master Plan

Vegetation Management Plan

Walt Disney Family Museum

Water Recycling Project


Building 100

Environmental Assessment

- Back to the Top -


Crissy Field

Crissy Field Marsh Expansion Study – Final Report (March 16, 2004)
          Chapter 1 to 3
          Chapter 4
          Chapter 5
          Chapter 6 to 10
          Appendix A

- Back to the Top -


Cultural Institutions on the Main Post

Public Museum at the Presidio - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping (August 2007)

Request for Proposals – Cultural Institutions at the Presidio Main Post
          Amendment #1 to the RFP for Cultural Institutions (October 16, 2007)

- Back to the Top -


Letterman Project

Letterman Final Environmental Impact Statement

Letterman Complex Programmatic Agreement

Letterman Complex Final Planning and Design Guidelines

- Back to the Top -


Lodge at the Main Post

Public Scoping Notice – November 2006

- Back to the Top -


Main Parade Ground

Main Parade Ground Environmental Assessment (November 2007)

- Back to the Top -


Main Post Update

National Environmental Policy Act Documents

Summary Brochure – Bringing Back the Heart of the Presidio

Draft Main Post Update of the Presidio Trust Management Plan (June 2008)
          Part 1
          Part 2

Presidio Trust Management Plan Main Post Update – Draft Supplemental Environmental Impact Statement (June 2008)
          Part 1 (Chapter 1)
          Part 2 (Chapter 2)
          Part 3 (Chapter 3 Sections 3.1 through 3.5)
          Part 4 (Chapter 3 Sections 3.6 through 3.8)
          Part 5 (Chapter 3 Sections 3.9 to conclusion)
          Appendix A

National Historic Preservation Act/Section 106 Documents

Draft Finding of Effect for the Main Post Update (February 2009)

California State Historic Preservation Officer Comment Letter – July 3, 2008

California State Historic Preservation Officer Comment Letter – July 18, 2008

References

Request for Proposals for Cultural Institutions on the Presidio Main Post (August 2007)

Draft Levantar Archaeological Management Strategy
          Part 1
          Part 2

Draft Archaeological Collections Management Policy

Draft Cut and Fill Map 1871-2000

Draft Cultural Landscape Assessment of the Main Post
          Part 1
          Part 2

Draft Identified Historic Properties Report

Draft Geoarchaeological Investigations for the Proposed Presidio Contemporary Art Museum

Draft Presidio Lodge Archaeological Test Trenching Results

Draft Archaeological Research Design Report for El Presidio and the Main Post

Draft Archaeology Education Program Prospectus

Draft Archival Research Report

Report on Archaeological Shovel Probe Survey at the Presidio of San Francisco

Draft Presidio Heritage Program: A Museum Without Walls

DRAFT 2008 National Historic Landmark (NHL) Update (85% as of July 2008)
          Introduction
          Section 7: Description
          Section 8: Statement of Significance
          Section 9: References
          Photographs
          Maps and Figures
                    Updated Building Classifications Map (June 2008)
          Appendix A: Previous Archaeological Studies
          Appendix B: DPR 523 C Records
          Appendix C: Archeological Property Templates

- Back to the Top -


Mountain Lake Enhancement Project

A Summary of the Mountain Lake Enhancement Plan

Mountain Lake Enhancement Plan and Environmental Assessment
          Chapter 1: Introduction
          Chapter 2: Affected Environment
          Chapter 3: Enhancement Alternatives
          Chapter 4: Environmental Consequences
          Chapter 5: Consultation and Coordination
          Appendices
          FONSI - Finding of No Significant Impact

- Back to the Top -


Playing Fields


Summary of November 15, 2006 Playing Fields Public Workshop


Summary of September 21, 2006 Playing Fields Public Meeting


Frequently Asked Questions about Recreation in the Presidio (September 2006)


- Back to the Top -


Presidio Golf Course IPM Program

Presidio Golf Course IPM Program Environmental Assessment

FONSI (Finding Of No Significant Impact)
          Attachment One: Public Comment
          Attachment Two: Errata

 

- Back to the Top -


Presidio Trust Management Plan

Executive Summary

Presidio Trust Management Plan

Environmental Impact Statement

Record of Decision (ROD)
          Resolution
          Table of Contents
          Record of Decision Chapters 1-10
          Attachment 1 - Mitigation Monitoring and Enforcement Program
          Attachment 2 - Report Accompanying the ROD
          Attachment 3 - Errata

- Back to the Top -


Public Health Service Hospital Project

Public Health Service Hospital Record of Decision (April 2007)

November 2006 Workshops – Background Binder

Wyman Residences Record of Decision (August 2006)

Public Health Service Hospital Final Supplemental Environmental Impact Statement (May 2006)
          Part 1 (p. 1-32)
          Part 2 (p. 33-79)
          Part 3 (p. 81-183)
          Part 4 (p. 184-256)
          Part 5 (p. 257-312)
          Appendix A
          Appendix B
          Appendix C
          Response to Comments - Part 1 (p. 1-76)
          Response to Comments - Part 2 (p. 77 - 122)

Notice of Availability of Final Supplemental Environmental Impact Statement (April 2006)

Project Update – Public Health Service Hospital (August 2004)

Public Health Service Hospital Draft Supplemental Environmental Impact Statement (August 2004)
          Table of Contents
          Summary
          Chapter 1: Purpose and Need
          Chapter 2: Alternatives p. 37 to 53
          Chapter 2: Alternatives p. 54 to 71
          Chapter 3: Affected Environment and Environmental Consequences p. 73 to 113
          Chapter 3: Affected Environment and Environmental Consequences p. 114 to 153
          Chapter 3: Affected Environment and Environmental Consequences p. 154 to 173
          Chapter 3: Affected Environment and Environmental Consequences p. 174 to 193
          Chapter 3: Affected Environment and Environmental Consequences p. 194 to 213
          Chapter 3: Affected Environment and Environmental Consequences p. 214 to 244
          Chapter 4: Consultation
          List of Acronyms, Glossary, Index
          Appendix A: Response to Comments
          Appendix B: Transportation Technical Memoranda

Notice of Intent to Prepare a Supplemental Environmental Impact Statement and Conduct Public Scoping

Project Update – Public Health Service Hospital (February 2004)

Environmental Assessment for the Public Health Service Hospital (February 2004)
          Table of Contents and Introduction
          Purpose and Need
          Alternatives
          Affect Environment and Environmental Consequences
          Consultation and References
          Acronyms and Glossary
          Appendix A
          Appendix B

Public Health Service Hospital Project Scoping Materials

Public Health Service Hospital Request for Proposals (RFP)
          Addendum 1
          Addendum 2
          Addendum 3
          Addendum 4
          Addendum 5

Public Health Service Hospital Request for Qualification (RFQ)
          Public Health Service Hospital RFQ - Appendix A
                    Cover and Table of Contents
                    Environmental Review Summary
                    Draft Planning and Design Guidelines
                    Summary of Environmental Remediation
                    Project Responsibility Chart
                    List of Existing Tenants
                    Overview of Exisiting Presidio of San Francisco Residential Programs and Revenue

 

- Back to the Top -


Tennessee Hollow Watershed Project

Environmental Assessment

Response to Public Comment and Final Finding of No Significant Impact

Tennessee Hollow Watershed Project Update (August 2007)

Tennessee Hollow Environmental Assessment (August 2007)

Tennessee Hollow Watershed Project Scoping Materials

Tennesse Hollow Watershed Project Summary November 2002 (as revised January 2003)

Glossary of Possible Habitat Types


- Back to the Top -


Thornburgh-West Letterman Project


Notice of Intent – Public Scoping for Thornburgh-West Letterman Environmental Assessment (April 2007)

- Back to the Top -


Trails and Bikeways Master Plan


Trails and Bikeways Master Plan

- Back to the Top -


Vegetation Management Plan

2004 Open Space Update

2003 Open Space Update

Vegetation Management Plan and Environmental Assessment
          Summary
          Chapter 1 Introduction
          Chapter 2 Purpose and Need
          Chapter 3 Vegetation Management Plan
          Chapter 4 Description of Project Alternatives
          Chapter 5 Affected Environment and Environmental Consenquences
          Chapter 6 Consultation and Coordination
          Chapter 7 References
          Appendices


- Back to the Top -


Walt Disney Family Museum


Environmental Assessment (September 2006)

- Back to the Top -


Water Recycling Project


Water Recycling Project Environmental Assessment
Chapter 1 Introduction
Chapter 2 Description of Alternatives
Chapter 3 Environmental Analysis
          3.1 Introduction
          3.2 Land Use and Policy Consistency
          3.3 Water Resources
          3.4 Biological Resources
          3.5 Cultural and Historic Resources
          3.6 Hazardous Materials
          3.7 Traffic
          3.8 Air Quality and Odors
          3.9 Noise
          3.10 Geology, Soils, and Seismicity
          3.11 Cumulative Effects
Chapter 4 Report Preparation
Appendix - Potential Occurrence of Special Status Species in Project Study Area
Glossary and Acronyms



- Back to the Top -