M/V Alvenus
Calcasieu River bar channel, 11 miles SE of Cameron, LouisianaSubject | Report - Situation |
---|---|
Posting Date | 1984-Aug-23 |
VESSEL STATUS: 8.23.84 M/V ALVENUS STILL BERTHED AT TODD SHIPYARD, PELICAN ISLAND, GALVESTON, TX UNTIL ENTERING DRYDOCK FACILITIES ON SEPTEMBER 5. BEACH IMPACT AND CLEANUP STATUS: 8.21.84 PROPOSAL PRESENTED BY CONTRACTORS TO TEST THE USE OF THE DISPERSANT COREXIT 9527 TO AID IN THE CLEANUP OF THE GALVESTON SEAWALL. 8.23.84 PROPOSAL FOR DISPERSANT TEST APPROVED BY OSC, EPA AND TDWR. IN ITS APPROVAL OF TEST, EPA HAS PLACED SEVERAL STIPULATIONS INCLUDING CERTAIN REPORTING REQUIREMENTS. TEST IS SCHEDULED FOR 1000 MONDAY MORNING (8.27.84). 8.23.84 CLEANUP OF SEAWALL CONTINUES WITH HYDRO/SAND BLASTING OF GROINS BY DAY AND THE SEAWALL BY NIGHT. 8.21.84 UNAUTHORIZED DISPOSAL/STOCKPILING SITE REPORTED BY PRIVATE CITIZEN TO BE IN MARSH/WETLAND AREA BACKING EAST BEACH. SITE INVESTIGATED BY OSC STAFF AND CONTRACTOR/OWNER REP. UNAUTHORIZED SITE CLEANUP COMPLETED 8.22.84. 8.21.84 TDWR, IN AGREEMENT WITH NOAA SCIENTIFIC SUPPORT TEAM RECOMMENDED NO FURTHER REMOVAL OF SAND FROM THE BEACH, OTHER THAN IDENTIFIED ISOLATED PATCHES WITH A HIGH PERCENTAGE OF OIL. THE REMAINING LIGHTLY OILED SAND ON THE BEACHES IS TO BE SPREAD AND TILLED INTO THE UPPER BEACH NEAR THE DUNE LINE---THE HEIGHT OF TILLED SAND NOT TO EXCEED 3 FT. 8.22.84 CITY, COUNTY AND STATE OFFICIALS OBSERVED RESULTS OF SPREADING/TILLING OPERATIONS AND GAVE THEIR APPROVAL. TDWR WILL CONTINUE TO MONITOR SPREADING/TILLING OPERATIONS. TOTAL SAND REMOVED FROM GALVESTON ISLAND BEACHES AS OF 8.22.84 IS 99,100 CUBIC YARDS, REPRESENTING SOME 7900 TONS OF OIL REMOVED FROM THE BEACH. OSC NOW BEING QUESTIONED BY CITY AND COUNTY ON WHAT PLANS ARE BEING MADE TO REPLENISH SAND ON THE BEACHES. NOAA ACTIVITIES: 1. CONDUCTED BEACH PROFILE SURVEY 8.23.84 2. PREPARED SUMMARY OF ALL SAMPLING DATA COLLECTED TO DATE AND DISTRIBUTED COPIES TO OWNER/CONTRACTOR REP, EPA, TDWR AND OSC. NOAA WILL CONTINUE TO COORDINATE SAMPLE ANALYSIS DATA. 3. DAILY WEATTHER RREPORTS SUPPLIED TO CONTRACTORS BY HOUSTON NWS OFFICE. 4. SSC PARTICIPATED IN RADIO TALK SHOW 'GALVESTON TALKING' TO DISCUSS OIL SPILL CLEANUP OPERATIONS IN GALVESTON. OTHER PARTICIPANTS: TDWR, NMFS, AND COUNTY PARKS SUPERINTENDENT. 5. SSC PARTICIPATED IN OVERFLIGHT WITH OWNERS TECHNICAL REPRESENTATIVES TO VIEW PROGRESS OF CLEANUP OPERATIONS ON WEST BEACHES AND TO CHECK ON REPORT THAT FRESH OIL WAS WASHING ASHORE NEAR SAN LUIS PASS. SAMPLE OF FRESH OIL COLLECTED FOR ANALYSIS TO DETERMINE IF FROM ALVENUS. PLANNED ACTIVITIES: 1. CONTINUE BEACH PROFILES. 2. E. GUNDLACH AND M. WILLIAMS TO GO TO AUSTEN TO TALK WITH BUREAU OF ECONOMICAL GEOLOGY ABOUT BEACH PROFILE DATA FOR GALVESTON ISLAND PRIOR TO OIL SPILL. 3. SSC TO COORDINATE DEVELOPMENT OF MONITORING PLAN FOR DISPERSANT TEST TO BE CONDUCTED ON SEAWALL. MONITORING WILL BE DONE BY NOAA, EPA, TDWR,NMFS, TEXAS PARKS AND WILDLIFE, U.S.F.W.L. AND COUNTY ENVIRONMENTAL ENGINEER. NOAA PERSONNEL ON SCENE: SHARON CHRISTOPHERSON TODD BAXTER ERICH GUNDLACH, RPI MARK WILLIAMS, RPI MIKE VOGEL DEPARTED 8.23.84