All Current Incidents. |
Incident - Interstate 295S |
Interstate 295S: at Exit 9A - Route 146 South - Lincoln accident cleared, roadway reopened to traffic last updated today at 10:46 AM |
|
Closure - Interstate 95N |
Interstate 95N: from Connecticut State Line to Exit 6 - Route 3 - West Greenwich; Coventry right lane closed — until Friday, at about 3:30 PM last updated May 8 |
|
Closure - Interstate 95N |
Interstate 95N: from Exit 6 - Route 3 - West Greenwich; Coventry to Exit 8B - Route 2 North - West Warwick left lane closed — until Friday, at about 6:00 AM last updated May 8 |
|
Closure - Interstate 95S |
Interstate 95S: from Exit 8 - Route 2; Quaker Lane to Exit 6 - Route 3 - Coventry; West Greenwich left lane closed — until Friday, at about 6:00 AM last updated May 8 |
|
Closure - Interstate 95S |
Interstate 95S: from Exit 6 - Route 3 - Coventry; West Greenwich to Connecticut State Line right lane closed — until Friday, at about 3:30 PM last updated May 8 |
|
Closure - US 44 |
US 44 westbound: at Lake Washington Drive in Glocester right shoulder closed — until today at about 3:30 PM last updated May 8 |
|
Closure - Interstate 95N |
Interstate 95N northbound: from Exit 18 - US 1A - Thurbers Avenue to Exit 25 - Route 126; North Main Street; Smithfield Avenue lane closed — until Friday, at about 6:00 AM last updated May 8 |
|
Closure - Interstate 95S |
Interstate 95S: from Exit 25 - Smithfield Avenue; North Main Street to Exit 18 - US 1A; Thurber's Avenue lane closed — until Friday, at about 6:00 AM last updated May 8 |
|
Closure - RI 138 |
RI 138 eastbound: at Jamestown Bridge in Jamestown lane closed — starting 9:00 AM, 05/12/09 until tomorrow at about 4:00 PM last updated May 8 |
|
Roadwork - Interstate 195W |
Interstate 195W: at Exit 3 - Gano Street; India Point road construction, entrance ramp closed — until Friday, at about 3:00 PM last updated today at 10:31 AM |
|
Roadwork - Airport Connector |
Airport Connector westbound: from Post Road in Warwick to Metro Center Boulevard in Warwick bridge maintenance operations, left lane closed — until today at about 2:30 PM last updated today at 8:09 AM |
|
Roadwork - RI 24 |
RI 24 in both directions: from Hummock Avenue in Portsmouth to Main Road; State Highway 138 (East) in Tiverton bridge inspection work is in progress, left lane closed — until Friday, at about 3:00 PM last updated May 8 |
|
Roadwork - RI 116 |
RI 116: at Stillwater Road bridge inspection work is in progress, right shoulder closed, left shoulder closed on Monday, Tuesday and Wednesday — starting 9:00 AM, 05/18/09 until May 20 last updated May 1 |
|
Roadwork - RI 138 |
RI 138 westbound: at Jamestown Bridge in Jamestown bridge inspection work is in progress, lane closed on weekday — until Friday, at about 4:00 PM last updated May 8 |
|
Roadwork - RI 138 |
RI 138: from Albert Street in Tiverton to Massachusetts State Line road maintenance operations, lane closed — until May 16 last updated May 8 |
|
Roadwork - RI 146A |
RI 146A in both directions: at Saint Paul Street bridge maintenance operations, right shoulder closed, left shoulder closed — starting 9:00 AM, 05/15/09 until Friday, at about 3:00 PM last updated May 8 |