Combined License Applications for New Reactors
Location of Projected New Nuclear Power Reactors
Applications Received
Bell Bend
Bellefonte, Units 3 & 4
Callaway, Unit 2
Calvert Cliffs, Unit 3
Comanche Peak Units, 3 & 4
Fermi, Unit 3
Grand Gulf, Unit 3
Levy County, Units 1 & 2
Nine Mile Point, Unit 3
North Anna, Unit 3
River Bend Station, Unit 3
Shearon Harris, Units 2 & 3
South Texas Project, Units 3 & 4
Victoria County Station, Units 1 & 2
Virgil C. Summer, Units 2 & 3
Vogtle, Units 3 & 4
William States Lee III, Units 1 & 2

North Anna, Unit 3 Application

North Anna
Who:   Dominion Virginia Power (Dominion)

What:   Application for a combined license (COL) for an Economic Simplified Boiling Water Reactor (ESBWR) designated as North Anna, Unit 3

When:   November 27, 2007 (date of application submittal)

Where:   Dominion's North Anna site near Richmond in Louisa County, Virginia

On this page:

Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.

Reference Documents

To top of page

Applicant Documents

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

Date Description
12/12/08 Dominion transmittal letter for North Anna Unit 3 COLA - Revision #1
  • Part 1 - General and Administrative Information
  • Part 2 - Final Safety Analysis Report (FSAR)
  • Part 3 - Environmental Report
  • Part 4 - Technical Specifications
  • Part 5 - Emergency Plan
  • Part 6 - Part not used in this application
  • Part 7 - Departures Report
  • Part 8 - Security Plan
  • Part 9 - Part not used in this application
  • Part 10 - Tier 1/Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC)
04/24/08 Dominion Application for Order and Conforming Amendments for Transfer of North Anna Early Site Permit
11/27/07 Dominion transmittal letter for North Anna Unit 3 COLA
  • Part 1 - General and Administrative Information
  • Part 2 - Final Safety Analysis Report (FSAR)
  • Part 3 - Environmental Report
  • Part 4 - Technical Specifications
  • Part 5 - Emergency Plan
  • Part 6 - Part not used in this application
  • Part 7 - Departures (Variances, Supplemental Information) from the ESBWR Design Control Document (DCD)
  • Part 8 - Security Plan [This Part contains safeguards information which is withheld from public availability]
  • Part 9 - Part not used in this application
  • Part 10 - Tier 1/Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC)

To top of page

Application Review Schedule

Key Milestones Completion Date
Actual - A
Target - T
Application Tendered 11/27/07 - A
Acceptance Review
Acceptance Review Start
12/03/07 - A
Docketing Decision Letter Issued/Acceptance Review Complete
01/28/08 - A
Review Schedule Established/Schedule Letter Issued to Applicant
02/27/08 - A
Safety Review
Phase 1 - Requests for Additional Information (RAIs) Issued to Applicant
08/29/08 - A
Phase 2 - SER with Open Items (incorporating COLA Rev 1) issued
07/24/09 - T
Phase 3 - ACRS Review of SER with Open Items Complete
11/04/09 - T
Phase 4 - Advanced SER with no Open Items Issued
09/10 - T
Phase 5 - ACRS Review of SER with no Open Items Complete
12/10 - T
Phase 6 - Final SER Issued
02/11 - T
Environmental Review
Phase 1 - Environmental impact statement (EIS) summary report issued
09/05/08 - A
Phase 2 - Draft EIS issued to EPA
12/19/08 - A
Phase 3 - Response to public comments on draft EIS issued
06/09 - T
Phase 4 - Final EIS issued to EPA
12/09 - T
Hearing
Commission or ASLB hold mandatory hearing
 
License
Commission decision on issuance of COL application
 

Information on Federal Register notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found on the Hearing Opportunities page.

To top of page

NRC Documents

Date Description
02/25/09 Updated Combined License Application Review Schedule
10/30/08 Order Approving Transfer of Early Site Permit No. ESP-003 And Conforming Amendment
09/04/08 Environmental Scoping Summary Report
07/17/08 Correction and Supplement to Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process
02/29/08 Federal Register Notice for Hearing and Opportunity to Petition for Leave to Intervene for North Anna Unit 3
02/27/08 Combined License Application Review Schedule
01/28/08 COLA Acceptance for Docketing and Federal Register Notice
12/06/07 Acknowledgement of Receipt of Application and Federal Register Notice

To top of page

Draft Environmental Impact Statement

  • See NUREG-1917, "Supplemental Environmental Impact Statement for the Combined License (COL) for North Anna Power Station Unit 3" (December 2008)

To top of page

Requests for Additional Information

Category RAI Date RAI Letter No. and Subject Applicant Response
Safety 03/20/08 RAI Letter No. 01 SRP Section 12.02 04/28/08
03/28/08 RAI Letter No. 02 SRP Section 2.3.2.3 04/25/08
04/01/08 RAI Letter No. 03 SRP Section 2.3.4.3 05/12/08
05/19/08 RAI Letter No. 04 SRP Sections 11.02, 11.04, and 11.05 06/30/08
06/04/08 RAI Letter No. 05 SRP Sections 17.04, 17.06, and 19 07/14/08
06/05/08 RAI Letter No. 06 SRP Sections 06.02.01, 06.02.04, 10.03.06, and 14.02 07/14/08
06/11/08 RAI Letter No. 07 SRP Sections 09.03.02, 11.02, 11.03, 11.04, 11.05, and 13.05.02.01 07/23/08
06/11/08 RAI Letter No. 08 SRP Section 09.05.01 07/23/08
06/13/08 RAI Letter No. 09 SRP Section 08.02 07/28/08
06/17/08 RAI Letter No. 10 SRP Sections 2.05.04 and 02.05.05 07/14/08
06/19/08 RAI Letter No. 11 SRP Sections 02.05.04, 08.03.02, 09.02.05, 12.02, 13.01.02-13.01.03 08/04/08
06/23/08 RAI Letter No. 12 SRP Sections 05.02.05, 10.04.05, and 14.02 08/07/08
06/24/08 RAI Letter No. 13 SRP Sections 09.01.04, 09.01.05, 09.05.04, and 17.5 08/04/08
06/27/08 RAI Letter No. 14 SRP Sections 03.07.01, 03.07.02, and 05.02.04 08/12/08
07/07/08 RAI Letter No. 15 SRP Section 13.03 Rescheduled
07/09/08 RAI Letter No. 16 SRP Sections 08.02, 09.05.04, and 12.02 08/21/08
07/15/08 RAI Letter No. 17 SRP Sections 02.01.02, 02.03.01, 02.03.02, 02.03.05, 09.02.01, and 14.02 08/28/08
07/18/08 RAI Letter No. 18 SRP Sections 13.03 and 14.03.10 Rescheduled
07/21/08 RAI Letter No. 19 SRP Sections 02.03.05, 03.09.03, 05.03.01, and 14.03.10 09/03/08
07/27/08 RAI Letter No. 20 SRP Sections 09.05.01, 11.04 09/04/08
07/28/08 RAI Letter No. 21 SRP Sections 05.02.01.01, 05.02.01.02, 13.01.01, 13.01.02-13.01.03, 13.02.01, 13.02.02, 13.05.02.01, and 14.02 09/11/08
08/01/08 RAI Letter No. 22 SRP Sections 03.09.06 and 03.11 09/11/08
08/06/08 RAI Letter No. 23 SRP Sections 03.02.01 and 03.02.02 09/17/08
08/08/08 RAI Letter No. 24 SRP Sections 02.04.12, 12.02, 12.03-12.04, 12.05, 14.02, and 14.03.03 09/19/08
08/12/08 RAI Letter No. 25 SRP Sections 02.02.03, 03.05.01.05, 12.02, and 15.06.05 12/29/08
10/20/08
10/17/08
09/26/08
08/19/08 RAI Letter No. 26 SRP Sections 02.04.13, 03.09.02, 05.03.02, and 11.05 10/02/08
08/21/08 RAI Letter No. 27 SRP Sections 12.01 and 12.03-12.04 10/03/08
08/21/08 RAI Letter No. 28 SRP Sections 01 and 02.04.02 09/29/08
09/16/08
10/16/08 RAI Letter No. 29 SRP Section 08.02 12/01/08
10/20/08 RAI Letter No. 30 SRP Sections 02.03.01, 06.02.04, 09.05.04, 11.03, 12.02, 12.03-12.04 12/03/08
01/12/09 RAI Letter No. 31 SRP Sections 02.03.01, 06.02.04, 09.05.04, 11.03, 12.02, 12.03-12.04  
02/18/09 RAI Letter No. 032 SRP Sections 08.02, 11.04, 11.05, 13.01.02-13.01.03, 14.03.06  
03/09/09 RAI Letter No. 033 SRP Sections 2.2.3, 2.4.2, 8.2, 12.2, and 14.3.7  
Environmental 06/18/08 RAI Letter Regarding the Environmental Review of the Combined License Application 07/17/08

To top of page

Public Meetings

Date Description
02/03/09 Draft Supplemental EIS Public Meeting
04/16/08 Environmental Scoping
12/13 - 14/07 Meeting regarding the technical content of the North Anna 3 COLA
11/29/07 North Anna 3 COLA Orientation
10/24/07 Public Outreach Meeting

To top of page

Contacts

Contacts for the North Anna COL Application
Safety Project Manager Thomas Kevern
Environmental Project Manager Alicia Williamson
Contact a Public Affairs Officer

To top of page