File Name |
Date |
Description |
BL-75-08 |
12/11/1975 |
PWR Pressure Instrumentation |
BL-75-07 |
11/26/1975 |
No Title - Involves Exothermic Reaction in Radwaste Shipment |
BL-75-04b |
11/03/1975 |
Cable Fire at Browns Ferry Nuclear Power Station |
BL-75-06 |
05/30/1975 |
Defective Westinghouse Type OT-2 Control Switches |
BL-75-05 |
04/14/1975 |
Operability of Category I Hydraulic Shock and Sway Suppressors |
BL-75-04a |
04/03/1975 |
Cable Fire at Browns Ferry Nuclear Power Station |
BL-75-04 |
03/24/1975 |
Cable Fire at Browns Ferry Nuclear Power Station |
BL-75-03 |
03/14/1975 |
Incorrect Lower Disc Spring and Clearance Dimension in Series 8300 and
8302 ASCO Solenoid Valves |
BL-75-02 |
02/14/1975 |
Defective Radionics Radiographic Exposure Devices and Source Changers
|
BL-75-01a |
02/07/1975 |
Through-Wall Cracks in Core Spray Piping at Dresden-2 |
BL-75-01 |
01/30/1975 |
Through-Wall Cracks in Core Spray Piping at Dresden-2 |