Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us |
Home > Electronic Reading Room > Document Collections > News Releases > 2005 > IV-05-016 |
|||
|
|||
No. IV-05-016 | May 6, 2005 | |
CONTACT: | Victor Dricks Phone: 817-860-8128 |
E-mail: OPA4.Resource@nrc.gov |
NRC TO DISCUSS 2004 PERFORMANCE ASSESSMENT |
||
The U.S. Nuclear Regulatory Commission staff will meet with representatives of TXU Power on May 10 to discuss the results of the agency’s 2004 assessment of safety performance at the Comanche Peak nuclear plant, located near Glen Rose, Texas.
The meeting will be held at 6 p.m. at the Somervell County Expo Center, 202 Bo Gibbs Blvd., Glen Rose. Before the session is adjourned, NRC staff will be available to answer questions from the public on the plant’s safety performance, as well as the agency’s role in ensuring safe operation of the facility. Overall, Comanche Peak operated safely during 2004 and will receive baseline inspections during 2005. Baseline inspections are performed by the NRC Resident Inspectors assigned to the plant and by inspection specialists from the Region IV office and the agency’s headquarters in Rockville, Md. A letter sent from the NRC Region IV Office in Arlington, Texas, to plant officials will serve as the basis for the meeting. It is available on the NRC web site at: Current information for Comanche Peak Unit 1 is available on the NRC web site at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/CP1/cp1_chart.html. |
||
NRC news releases are available through a free listserv subscription at the following Web address: http://www.nrc.gov/public-involve/listserver.html. The NRC Home Page at www.nrc.gov also offers a Subscribe to News link in the News & Information menu. E-mail notifications are sent to subscribers when news releases are posted to NRC's Web Site. |
Privacy Policy |
Site Disclaimer |