skip navigation links 
 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Part 21 Reports
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995

Part 21 Reports: 2002

Log No Notifier Description Report Date Access No
2002-01-0 PDF Icon Boeing GTSTRUDL rigid body incidences command 10/31/2001 ml020090019
2002-01-1 PDF Icon Boeing GTSTRUDL calculate resultant command 11/28/2001 ml020090080
2002-01-2 PDF Icon Boeing GTSTRUDL print member properties command 12/20/2001 ml020220325
2002-02-0 U.S. Geological Survey dosimetry at Triga reactor 11/21/2001 ml020110184
2002-03-0 ASCO Valve Hydramotor® actuator limit switch 12/21/2001 ml020240230
2002-03-1 PDF Icon ASCO Valve Hydramotor® actuator limit switch 01/14/2002 ml020420376
2002-04-0 Automatic Valve air operated valve leakage 01/25/2002 ml021200032
2002-05-0 General Electric cutoff switch in AK-15, AK-25, and AKR-30S circuit breakers 02/18/2002 ml020650058
2002-06-0 ABB weight balance on CV-2 and CV-22 relays 03/19/2002 Event Notification 38781
2002-06-1 ABB weight balance on CV-2 and CV-22 relays 05/08/2002 ml021440028
2002-07-0 General Electric offset in instantaneous (magnetic) trip current on certain J-core molded case circuit breakers 04/03/2002 ml020990033
2002-08-0 Wyle incorrect irradiation dose units in hot cell work 04/12/2002 ml021060181
2002-08-1 PDF Icon Wyle incorrect irradiation dose units in hot cell work 05/22/2002 ml021570176
2002-09-0 General Electric missing lock washer on CR105X contactors 04/12/2002 ml021150567
2002-10-0 Rockwell Automation inadequate electric motor winding slot fill 05/09/2002 ml021360406
2002-10-1 PDF Icon Rockwell inadequate electric motor winding slot fill 05/16/2002 ml021790469
2002-10-2 PDF Icon Rockwell Automation inadequate electric motor winding slot fill 06/07/2002 ml021830510
2002-11-0 General Electric undersized washer in switch plate locking mechanism on differential pressure indicating switches 05/10/2002 ml021360140
2002-12-0 ABB failure of K-Line circuit breakers to charge at San Onofre 05/14/2002 Event Notification 38919
2002-13-0 Solid State Controls potential for loose fan blade in uninterruptible power systems 05/15/2002 ml021510295
2002-14-0 Consumers Energy lack of quality assurance maintenance on Midland Unit 2 reactor pressure vessel head 05/23/2002 ml021550411
2002-15-0 Rotork Controls potential for electric valve actuator control switches to reset or fail to operate 06/10/2002 ml021790313
2002-16-0 ASCO excessive recycling of pump needed to maintain valve actuator shaft in powered position during testing 06/19/2002 ml021830047
2002-16-1 PDF Icon ASCO excessive recycling of pump needed to maintain valve actuator shaft in powered position during testing 07/19/2002 ml022070455
2002-16-2 PDF Icon ASCO potential operational difficulties with certain pumps supplied in pump kits and intended for installation in NH95 Model B Hydramotor® actuators 08/02/2002 ml022210232
2002-16-3 ASCO Valve Inc. Excessive recycling of pump needed to maintain valve actuator shaft in powered position during testing 12/17/2002 ml023600354
2002-17-0 Rosemount inaccurate advice to Rochester Gas and Electric concerning calibration of Models 1152 and 1154 pressure transmitters with high line pressure 07/24/2002 Event Notification 39086
2002-18-0 Engine Systems EMD emergency diesel generator air start system pressure regulating valve may stick open 07/30/2002 ml022190534
2002-19-0 Engine Systems potential bearing cooling oil blockage from loose flashing material used in manufacture of EMD 645 engine pistons 08/01/2002 ml022200286
2002-20-0 Rockbestos incorrect lacquer applied to electrical cable could contribute to flame propagation 08/09/2002 ml022260608
2002-20-1 PDF Icon Rockbestos Cable failed to comely with the vertical tray flame test when subjected to the requirements 08/09/2002 ml022900277
2002-21-0 General Electric inadequate vibratory loads on main steam isolation valves with one main steam isolation valve out of service 08/23/2002 ml022380417
2002-21-1 PDF Icon General Electric Main Steam Line Valve Out-of-Service Final Report 08/23/2002 ml022810290
2002-22-0 ABB test failure of a power shield trip device manufactured before March 1991 08/26/2002 ml022410017
2002-22-1 PDF Icon ABB Power Shield Transformer Saturation 08/26/2002 ml022740451
2002-23-0 Rosemount failures of capacitors in damping circuits of certain Models 1153 and 1154 08/30/2002 ml022620057
2002-24-0 Rosemount certain Model 1153 differential pressure transmitters and space sensor modules may not meet the published temperature effect specification 09/09/2002 ml022620059
2002-25-0 ALCo (Fairbanks Morse) Fuel injector pump found to be leaking excessively through a nameplate rivet hole 09/18/2002 Event Notification 39197
2002-25-1 PDF Icon ALCo (Fairbanks Morse) Fuel injector pump found to be leaking excessively through a nameplage rivet hole 10/11/2002 ml022960351
2002-26-0 Fitzpatrick Trip device over current sensor failed during bench testing 09/26/2002 Event Notification 39218
2002-26-1 Fitzpatrick Trip device over current sensor failed during bench testing 10/02/2002 ml022890175
2002-27-0 General Electric Potentially delayed reactor scram because of the period based detection algorithm (PBDA) 10/04/2002 ml022830278
2002-27-1 General Electric Final Report, Stability Option III: Possible Successive COnfirmation Count Resets 11/18/2002 ml023290162
2002-28-0 General Electric Technical Specification safety limit for minimum critical power ratio (MCPR) may be exceeded in BWR/6 plant using newer fuel designs 10/04/2002 ml022820162
2002-29-0 C & D Technologies A series of welds for a fuel rack joining horizontal cross beams were not welded correctly during fabrication and may effect seismic qualifications 10/11/2002 ml022900283
2002-30-0 Engineer Systems Seal within engine driven water pump assembly failed prematurely resulting in leakage of primary cooling water and lubricating oil from weep hole in EDG 10/04/2002 ml022900613
2002-31-0 General Electric Stability Option III Period Based Detection Algorithm T-min Specification Has a Defect 11/22/2002 ml023310569
2002-32-0 Framatome The MCPR calculation using the SPCB correlation in the MICROBURN-B2 and MICROBURN-B codes and associated POWERPLEX monitoring software contains an erroPower Shield Transformer Saturation 11/22/2002 ml023310566
2002-33-0 Spectrum Technologies Class 1E safety related Cutler-hammer A200 NEMA Size 1 starter found to be faulty 11/25/2002 ml023330442
2002-33-1 Spectrum Technologies Class 1E safety related Cutler-hammer A200 NEMA Size 1 starter found to be faulty 12/20/2002 ml023600023
2002-35-0 ABB Broken solder joints (crack in solder joint) on some pins on the tap blocks of Power shield trip devices 11/20/2002 ml030160169
2002-36-0 Caboline Premature gellation or significant thickening prior to the end of the 12-month shelf life expiration date of Carbonize 11 SG 12/06/2002 ml023500215
2002-37-0 Framatome Location of fuel assemblies in BWR/6 reactors with the POWRPLEX incore monitoring system may affect their orifice pressure loss coefficients 12/10/2002 ml023470352
2002-38-0 Boeing Company Errors associated with the computer codes "ANSYS" and "GTSTRUDL" 11/19/2002 ml023360088


Privacy Policy | Site Disclaimer
Tuesday, February 20, 2007