ETA Logo
Search :
  Advanced Search
About ETAFind Job & Career InformationBusiness & IndustryWorkforce ProfessionalsGrants & ContractsETA LibraryForeign Labor CertificationPerformance & ResultsRegions & States
Skip to page content Department of Labor Logo UNITED STATES DEPARTMENT OF LABOR Employment & Training Administration
 
ETA Home  >  Grants & Contracts >  sga > 
 
Sitemap  Printer Friendly Version

SGA/DFA 02-110 Budget Information

PART II - BUDGET INFORMATION

SECTION A - Budget Summary by Categories

 (A)(B)(C)
1. Personnel   
2. Fringe Benefits (Rate )   
3. Travel   
4. Equipment   
5. Supplies   
6. Contractual   
7. Other    
8. Total, Direct Cost (Lines 1 through 7)   
9. Indirect Cost (Rate %)   
10. Training Cost/Stipends   
11. TOTAL Funds Requested (Lines 8 through 10)    

 

SECTION B - Cost Sharing/ Match Summary (if appropriate)

 (A)(B)(C)
1. Cash Contribution    
2. In-Kind Contribution    
3. TOTAL Cost Sharing / Match (Rate %)   

NOTE: Use Column A to record funds requested for the initial period of performance (i.e. 12 months, 18 months, etc.); Column B to record changes to Column A (i.e. requests for additional funds or line item changes; and Column C to record the totals (A plus B).

 

INSTRUCTIONS FOR PART II - BUDGET INFORMATION

SECTION A - Budget Summary by Categories

1. Personnel: Show salaries to be paid for project personnel which you are required to provide with W2 forms.

2. Fringe Benefits: Indicate the rate and amount of fringe benefits.

3. Travel: Indicate the amount requested for staff travel. Include funds to cover at least one trip to Washington, DC for project director or designee.

4. Equipment: Indicate the cost of non-expendable personal property that has a useful life of more than one year with a per unit cost of $5,000 or more. Also include a detailed description of equipment to be purchased including price information.

5. Supplies: Include the cost of consumable supplies and materials to be used during the project period.

6. Contractual: Show the amount to be used for (1) procurement contracts (except those which belong on other lines such as supplies and equipment); and (2) sub-contracts/grants.

7. Other: Indicate all direct costs not clearly covered by lines 1 through 6 above, including consultants.

8. Total, Direct Costs: Add lines 1 through 7.

9. Indirect Costs: Indicate the rate and amount of indirect costs. Please include a copy of your negotiated Indirect Cost Agreement.

10. Training /Stipend Cost: (If allowable)

11. Total Federal funds Requested: Show total of lines 8 through 10.

SECTION B - Cost Sharing/Matching Summary

Indicate the actual rate and amount of cost sharing/matching when there is a cost sharing/matching requirement. Also include percentage of total project cost and indicate source of cost sharing/matching funds, i.e. other Federal source or other Non-Federal source.

NOTE: PLEASE INCLUDE A DETAILED COST ANALYSIS OF EACH LINE ITEM.

 


 
Created: January 15, 2009